Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development and Improvement of Submerged Lance Converting and Refining Furnace of Fangyuan Two-Step Process

    By Haibin Wang, Zhiwei Huang, Zhixiang Cui, Wenzhao Cui, Zhi Wang

    Fangyuan Two-Step copper smelting process was commercialized in October, 2015 and has been operating for 3 years and 5 months. As the unique continuous copper smelting process with simplified flow in

    Jan 1, 2019

  • CIM
    Characterization of Solid Residue from Leaching New Zealand Ironsand Characterization of Solid Residue from Leaching New Zealand Ironsand

    By M. Nusheh, C. Bumby, A-H. Puichaud

    "Vanadium-bearing titanomagnetite ironsand deposits occur along a 480 km stretch of the west coast of New Zealand. In the present study, the leaching behaviour of NZ ironsand was investigated in hydro

    Jan 1, 2017

  • CIM
    Time-Between-Seismic Events to Enhance Seismic Source Interpretation

    By D. Beneteau

    Plotting sets of data collected over time using a frequency-magnitude distribution is common with both earthquake and mining seismology. A Time-Between-Events (TBE) analysis technique simply makes use

    Nov 1, 2011

  • CIM
    Resource Recovery From Waste Waters: Using Biomineralisation for the Selective Recovery of Metals from Acid Rock Drainage and Mine Process Waters

    By D. B. Johnson

    Acidic, metal-rich waters generated at working metal mines and abandoned mine sites are generally considered to be major pollutants of the environment. However, the metals they contain often have sign

    Aug 1, 2013

  • CIM
    Copper Refining Electrolysis at High Current Densities with Conventional Technology

    By A. C. Atenas

    The majority of refineries that operate with traditional starting sheet technology ?starting sheet- uses a relatively low current density of 250 A/m2. Industrial tests at high current density with con

    Jan 1, 2007

  • CIM
    Kinetics of Gold Leaching in Alkaline Sulfide Solutions

    By S. Joshi, E. Asselin

    An electrochemical quartz crystal microbalance (EQCM) was used to study the leaching of pure gold in deaerated 1 M Na2S solution. Multiple cyclic voltammograms were measured between -0.76 and 1.242 V

    Jan 1, 2011

  • CIM
    Inmet?s 2004 Performance Against TSM Indicators

    Agenda ? Introduction ? Inmet?s Operations and Closed Properties ? Inmet?s SECA Philosophy ? Inmet?s SECA Framework ? The Business Case for TSM ? Inmet?s TSM Reporting ? Inmet?s 2004 TSM Perfor

    Apr 1, 2005

  • CIM
    Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants

    By Tim Hughes, Steve Gannon, Jennifer Abols

    "In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal

    Jan 1, 2007

  • CIM
    An information system to prevent sulphide dust ignition

    By A. Burkert, A. E. Hajj

    "An information system has been developed for the use of companies considering developing a new mine which may be liable to secondary sulphide ignitions or by existing operations. The system uses the

    Jan 1, 1994

  • CIM
    Managing technological innovations from research to operations: a case study, introducing an improved material

    By G. Lucas

    "Material substitution occurs continuously in response to competitive and economic pressures. Technical development can accelerate or slow substitution by improving the performance of the invading or

    Jan 1, 1987

  • CIM
    Solidification of Undercooled Intermetallic Forming Systems

    By H. Assadi, S. Reutzel, D. M. Herlach

    Intermetallics exhibit unique solidification behaviour due to their chemical longrange order. This includes, for instance, generally slow solidification kinetics, and in some cases, an anomalous parti

    Jan 1, 2006

  • CIM
    "Vanadium Recovery from LD Converter Slag by Means of HeterotrophicBacteria"

    By S. M. J. Mirazimi, F. Rashchi

    Recovery of vanadium from LD (Linz-Donawits) converter slag was evaluated by means of microbial leaching. Vanadium leaching was performed in two stages. In the first stage, the bacteria were grown in

    Jan 1, 2011

  • CIM
    Recovery of Cerium from Chloride Solution by Oxidation with Sodium Hypochlorite

    By K. Soldenhoff, D. Wilkins, E. Ho

    In the processing of rare earth ores, a pure, mixed rare earth chloride solution is usually produced and used as the feed to solvent extraction circuits to separate the individual rare earths. Cerium(

    Jan 1, 2014

  • CIM
    Etude du drainage superficiel et souterrain de la -mine à ciel ouvert des Mines Gaspé, Murdochville, Québec

    By A. Liard, H. Sommelet, G. Sauriol

    "Description des études qui ant conduit à la conception spécifique du système de drainage de la mine à ciel ouvert. Les approches différentes sont examinées ainsi que la valeur du système recommande.I

    Jan 1, 1981

  • CIM
    Development and Production of X80 Hot-Rolled Thick Steel Strips in WISCO

    By C. -S. Xie, J. -H. Kong

    The microstructure and mechanical properties of X80 hot-rolled thick steel strips with a thickness of 17.5mm produced in Wuhan Iron & Steel Company (WISCO) are introduced in the paper. The steel strip

    Jan 1, 2005

  • CIM
    Sustainability

    By Rob Scott

    Making a difference with Zinc & Health Two billion people do not get enough zinc in their diets. Every year 450,000 children die from complications arising from zinc deficiency Our Zinc Allia

    May 1, 2013

  • CIM
    Galfan-coated automotive steel improves fabrication and performance

    By Richard F. Lynch, Frank E. Goodwin

    "The development of Galfan, a new generation 95% zinc-5% aluminum-mischmetal alloy coating for steel, offers opportunities for greater fabrication flexibility and upgraded corrosion performance in aut

    Jan 1, 1987

  • CIM
    A Study of Strength Characteristics of an Andesite

    By G Zahary

    THE most acceptable approacl1 to analyzing rock behaviour, at the present time, is based on the application of principles of mechanics and strength of materials. Analyses have been made in which the c

    Jan 1, 1963

  • CIM
    Corrosion mechanism and degradation of refractories in copper smelting furnaces at sarcheshmeh copper complex

    By A. Rahimi

    The smelting plant at Sarcheshmeh Copper complex commenced working with two reverbatory furnaces, four pierce smith converters, two anode furnace and one holding furnace having a known capacity of 420

    Jan 1, 2004

  • CIM
    Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating Highlights

    By K. Meyer

    "INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.

    Jan 1, 1989