Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Metallurgical Strategy at Sturgeon Lake MillBy C. P. Patel
"The Sturgeon Lake Joint Venture volcanic massive sulpide deposit was discovered in 1970. Milling was started by Falconbridge Copper Ltd. at Sturgeon Lake in September 1974. The Sturgeon Lake pit and
Jan 1, 1980
-
Application of Sodium and Biogenic Sulphide for Copper Precipitation in a Continuous ReactorBy Isabel C. B Rodrigues, Flávia D. Reis, Versiane A. Leão, Rosa M. F. Lima
Attention has been focused in recent decades upon the precipitation of metal sulphides from acid mine drainage (AMD) and pregnant leach solutions, due to the advantages of the sulphide precipitation p
Jan 1, 2014
-
Update of Span Design Curve for Weak Rock MassesBy Andrea M. Ouchi
A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR
May 1, 2004
-
Hybrid Power at Remote Mining Sites to Reduce Electricity CostsBy Michel Carreau
Renewable assets have large upfront capital costs but minimal operating expenses over their lifetimes. In some instances, deals can be structured so that direct capital investment is feasible, with pa
Aug 1, 2013
-
Reprocessing Of Historic Tailings from the Aunor Mine in TimminsBy M. A. Tomlinson, A. Di Feo, T. C. Cheng
"Goldcorp is evaluating the potential for economic reprocessing of historic tailings at several sites, including the Aunor A facility located in Timmins. The overall project is investigating the abili
Jan 1, 2019
-
Andritz Metals Spray-Roast Acid Regeneration Pilot PlantBy S. K. Mitterecker, T. Hofbauer, F. Baerhold
"Acid regeneration is a very important process step in each acid leach circuit. It is required to recover dissolved metals and HCl from spent leaching acid. Andritz Metals presents its recently commis
Jan 1, 2016
-
Closing the loop—Using actual concentrator performance to determine the true value of ore sources"The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co
Jan 1, 2005
-
Structural Controls on Gold Mineralization at the Burnt Timber Mine, Lynn Lake Greenstone Belt, Trans-Hudson Orogen, ManitobaBy B. Lafrance, C. J. Beaumont-Smith, L. R. Jones
"Abstract - The Burnt Timber gold deposit is located in the Paleoproterozoic Lynn Lake greenstone belt of the Trans-Hudson Orogen, Manitoba. The deposit occurs along the Johnson shear zone, and is hos
Jan 1, 2006
-
Heating Iron Ore Slurry to Improve Filtering Efficiency Prior to PelletizingBy Robert E. Wood
Engineers have known for some time that the efficiency of filtering iron ore concentrate slurry can be significantly improved by pre-heating the slurry ahead of the filters. However, heating such larg
May 1, 2010
-
Development of the automatic GO-60 drillBy R. England
"This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.
Jan 1, 1987
-
Multiple Feeder ControlBy André Vien, Pedro Gonzalez, Julio Palomino, Rob Perry
"In many mineral processing plants ore is reclaimed from a stockpile using multiple feeders. The discharge from these feeders is combined onto a single conveyor from which total tonnage is measured. T
Jan 1, 2000
-
Selecting the Number of Increments for Daily Metallurgical Samples: Application to Goldcorp Eleonore Gold Ore Concentrator, Quebec, CanadaBy Claude Bazin, Jalna Lamontagne
"The operators of mineral processing plants collect daily samples from strategic process streams with a view to prepare production balances to assess plant performances. The rules to minimize the risk
Jan 1, 2017
-
Management of Radioactive Wastes from Rare Earth Element ProductionBy L. M. Lowe, D. B. Chambers, D. G. Feasby
"The presence of the naturally occurring radioactive elements uranium and thorium in rare earth (RE) resources can present challenges in achieving regulatory and social acceptance. The discovery and a
Jan 1, 2016
-
Flexibility of the Outokumpu Flash Smelting for Low and High Grade Concentrates - Evaluation By CFD-ModelingBy K. Eklund, T. Ahokainen
The Flash Smelting process is the most used production method for primary copper in the world. The basic idea of the Flash Smelting is to utilize the thermal value of sulfidic concentrates and melt th
Jan 1, 2007
-
The Application of Large Scale Stirred Milling to the Retreatment of Merensky Platinum TailingsBy Stephan Buys, Dan Curry, Chris Rule
"The use of fine grinding (FG) in mineral processing is well established. The application of FG in the South African platinum industry is more recent and it’s use in the recovery of PGM’s from dormant
Jan 1, 2005
-
An Alkaline Glycine-Based Process for Copper Recovery and Iron Rejection from ChalcopyriteBy B. Tanda
A process has been developed at Curtin University whereby glycine is used in an alkaline environment to leach gold, silver and copper from their ores, concentrates, process intermediates and wastes. C
Jan 1, 2016
-
Magmatic and Non Magmatic OresBy C. J. Sullivan
It is of importance, in prospecting, to distinguish ores of magmatic origin from those derived by the meta-morphism and granitization of source rocks and from those accumulated in certain sedimentary
Jan 1, 1962
-
General geology and uranium deposits of the Beaverlodge DistrictBy L. S. Beck
"IntroductionThe Beaverlodge District is an important mineralogenic province of pitchblende and occupies about 1300 square kilometres centred on Beaverlodge Lake near the north shore of Lake Athabasca
Jan 1, 1986
-
Water Management Design for Cigar Lake Uranium MineBy Ken Dyck Sr.
"Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to
Jan 1, 2006
-
Milling of Noranda Process SlagsBy P. W. Godbehere, B. W. Brooks
"This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced
Jan 1, 1977