Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development of a Leach/Rip Process for Recovering Uranium from the Mkuju River Deposit in Tanzania

    By K. Soldenhoff

    Mantra Resources Ltd is developing the Mkuju River project is southern Tanzania. The uranium deposit, hosted in ?Karoo? sandstone, is surface outcropping with the majority of uranium mineralisation oc

    Aug 1, 2010

  • CIM
    The Siscoe Gold Deposit

    By J. E. Hawley

    Introduction The Siscoe gold mine is the most easterly producer of gold from deposits lying in the belt of Keewatin and Timiskaniing rocks which extends east from Kirkland Lake, Ontario, and on throu

    Jan 1, 1932

  • CIM
    Redesign of Furnace No. 1 at the Pobuzhsky Ferronickel Combine

    By N. Novikov, M. Jastrzebski, N. Kryzhanovskaya, D. Shevchenko, I. Kapran, N. V. Novikov, T. Koehler, B. Zaporozhets

    "The PFK FeNi Smelter was re-commissioned by Solway Resources in 2002, ending a long period of economic decline in the adjacent town. In 2009 Hatch was retained to design, supply and install a custom

    Jan 1, 2012

  • CIM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimizing the Rate of Froth Recovery using Outokumpu Froth master™

    By Peter Bourke, Marc van Olst, Seppo Ronkainen, Natalie Brown

    "Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and r

    Jan 1, 2001

  • CIM
    Design and Construction of Deep Shaft Concrete Linings in the UK

    By F. A. Auld

    "During the period 1958-1980 seven deep shafts were sunk from the surface in the UK. From 1977 until 1989 sixteen deep shafts were sunk in the UK, all concrete lined. Subsequently from 1989 up to the

    Jan 1, 2019

  • CIM
    Chapter III- Continued - Part 6.-Porcupine-Ramore Area - Structural Relations of the Porcupine Ore Deposits

    By W. Roy Dunbar

    "The Porcupine area is in northern Ontario at the intersection of N. Lat. 48° 30' and 81° W. Long. It is 125 miles due north of the Sudbury nickel range. Practically all the mineral production of this

    Jan 1, 1954

  • CIM
    Flotation Treatment of Complex Sulphide Ores

    By M. J. Fairweather

    "The development of means to maximize the selectivity between galena and sphalerite in lead zinc ores is extremely important to the lead-zinc industry. Two challenging studies recently undertaken by C

    Jan 1, 1991

  • CIM
    Dust Control at Steep Rock Iron Mines Pelletizing Plant

    By P. S. Capper

    "Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr

    Jan 1, 1976

  • CIM
    New Technology for Hoist Conveyance Monitoring and Analysis

    Many mines in Canada, the US and S. Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due the excessive weight. It has been suggested (DeLorme, 2

    May 1, 2002

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • CIM
    Study of the Potential Fault Reactivation Induced by Co2 Injection in a Three-Layer Storage Formation

    By J. Bensabat, B. Figueiredo, A. Niemi, J. Rutqvist, C. F. Tsang

    "A hydro-mechanical model was developed to study the interaction between mechanical deformation and fluid flow in the fault zones during CO2 injection and storage at the Heletz site which was chosen a

    Jan 1, 2015

  • CIM
    The genesis of giants: lessons from the Tambogrande VMS district, Perú - (POWER POINT)

    By Lawrence Winter

    why are these deposits significant? (i) economically and (ii) in a VMS/geological context. ?Significance of the tectonic setting. ?New understanding of the regional geology: volcanic stratigraphy, f

    May 1, 2006

  • CIM
    Improving Double Bench Face Performance at the Ekati Diamond MineTM Site

    By Judy K. Todd

    Double benching has been utilized as an excavation technique in open pit mines for many years. This process involves drilling, blasting, and excavating the material for the design bench height. A seco

    May 1, 2002

  • CIM
    Two-Mass Vibrating Screens for High Tonnage Applications

    By Steve Massman, Edward Wipf, Gary Beerkircher

    "As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000

    Jan 1, 2017

  • CIM
    The Recovery of Copper from Copper Oxide Ore using Heap Leaching, Solvent Extraction and Electrowinning

    By R. H. Walton

    "In recent years the recovery of copper from low grade oxide ores has received widespread attention. The cost of treating such ores using conventional technology, such as milling and flotation, is fre

    Jan 1, 1990

  • CIM
    Computer Control Strategy

    By R. J. McLeod

    "CONTROL STRATEGYThe Lake Dufault Division of Falconbridge Copper Limited has been concentrating a complex copper zinc ore since late 1964. An ARL X-ray on stream analyzer was installed in 1966 for pr

    Jan 1, 1973

  • CIM
    Eldorado Mine

    By Richard Murphy

    "The general geology of the Great Bear Lake area has been described by; D. F. Kidd in the Summary Report of the Geological Survey for 1932. A brief description of the Eldorado mine was prepared by C.

    Jan 1, 1954

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • CIM
    New Helen Mine

    By T. L. Tanton

    "The New Helen mine is 12 miles east of Michipicoten harbour on lake Superior. It is 2 miles east of Wawa station, on the Algoma Central railway, with which it is connected by a spur line railway and

    Jan 1, 1954

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003