Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Feasibility of Dry High Pressure Grinding and Classification

    By van der Meer. F. P.

    High Pressure Grinding Roll (?HPGR?) technology is applied in a broadening range of minerals processing applications for relatively wet or moist materials. HPGR grinding of dry material or involving d

    Jan 1, 2012

  • CIM
    Physical Metallurgy: I.-Recent Developments; II.-Diagnosis of Mechanical Failures

    By Gordon Sproule

    THE papers presented to the Institute, and published in the BULLETIN, in the past three years, may be classified as follows: Geology, Mining, and Milling 89 or 58.5 per cent Smelting, Refining, an

    Jan 1, 1936

  • CIM
    Use of the Enviro-Clear Thickener at Quirke Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt

    Jan 1, 1977

  • CIM
    Prospecting for Gold: Self-Assembly on Old CDs

    By Hua-Zhong Yu

    Gold is one of the most widely used substrate materials for self-assembly. Self-assembled monolayers (SAMs) prepared from alkanethiols and their derivatives on gold are the most reliable and well-stud

    Oct 1, 2003

  • CIM
    Hydrogen Cracking and Fracture of Galvanized Transmission Tower Bolts

    By J. C. Thornley

    Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si

    Jan 1, 1979

  • CIM
    Electrochemical Characteristics of Iron Sulfide Minerals in the Presence of SMBS and TETA and the Case for Their Joint Action

    By A. M. L. Cushing, S. Kelebek, A. Ghahreman

    Iron sulfides are part of many ore deposits affecting flotation separation of non-ferrous base metals from them. Open-circuit potential (OCP), potentiodynamic polarization, and electrochemical impedan

    Jan 1, 2017

  • CIM
    Fracture Analysis at the Tasiast Open Pit Mine in Western Africa

    By A. C. Gagnon, H. Saroglou

    "The focus of this paper is on the analysis of geometrical discontinuity properties for the rock mass located within an open pit mine located in Western Africa. Discontinuity data were collected using

    Jan 1, 2015

  • CIM
    The Systematic Reclamation of Gold Mine Tailings

    By Jean-Claude LeRoy, Herman Keller

    "INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part

    Jan 1, 1975

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994

  • CIM
    Concerning Ore-Shoots

    By G. Vibert Douglas

    It has long been recognized that there are considerable difficulties connected with the physical and chemical explanation of shoots of ore. The literature of Mining Geology has frequent references to

    Jan 1, 1934

  • CIM
    Stope-and-Pillar Design for the Elliot Lake Uranium Mines

    By D. G. F. Hedley, F. Grant

    "In 1958, the Ontario Department of Mines appointed a committee to study the accident situation and mining methods used in the uranium mines in the E1liot Lake district. This committee reviewed the ex

    Jan 1, 1972

  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    Measuring Grade-Recovery and Partition Curves of Dense Minerals by Batch Fractionation in a Laboratory-Scale Reflux™ Classifier

    "Sink-float analysis is often used to obtain yield-ash and density partition curves in the coal industry. These provide a valuable tool for evaluating the performance of a separation process. However,

    Jan 1, 2016

  • CIM
    Les Aspects Regionaux de la Dispersion Glaciaire, Chibougamau, Quebec

    By M. Bouchard et G. Martineau

    In the Chibougamau area, a large portion of the glacially tranported boulders which were deposited at the surface were later partly remobilized by the waters of Glacial Lake Ojibway. In the dispersal

    Jan 1, 1984

  • CIM
    Simulating the Effect of LHD Operations on Production Rates and Ventilation Costs in a Sublevel Cave Underground Mine

    "Load-haul-dump machines (LHDs) are typically used in underground metal mining operations. Delays or inappropriate use of LHDs can result in production loss. Optimized LHD use is especially crucial in

    Jan 1, 2019

  • CIM
    Drum Hoists ? Case Study

    By Gordon F. Scott

    This paper considers a recently completed hoist project for IAMGOLD. Called the Westwood project, this mine utilises some of the largest drum hoists supplied to the North American Market in recent tim

    May 1, 2011

  • CIM
    The Highmont Concentrator Startup

    By R. S. Fukuhara, M. J. Allan

    "Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the

    Jan 1, 1982

  • CIM
    Labour Market Intelligence; An update for the Canadian Mining Industry

    OVERVIEW OF PRESENTATION ? What is LMI ? Who uses LMI and how? ? Value of LMI to the Mining Industry ? Mining Industry Workforce Information Network (MIWIN) ? The Challenge: Forecasting the futur

    May 1, 2009

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    Significant Improvements are Possible from Process Optimization

    By Jon R. Maki

    "EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for

    Jan 1, 2014