Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Feasibility of Dry High Pressure Grinding and ClassificationBy van der Meer. F. P.
High Pressure Grinding Roll (?HPGR?) technology is applied in a broadening range of minerals processing applications for relatively wet or moist materials. HPGR grinding of dry material or involving d
Jan 1, 2012
-
Physical Metallurgy: I.-Recent Developments; II.-Diagnosis of Mechanical FailuresBy Gordon Sproule
THE papers presented to the Institute, and published in the BULLETIN, in the past three years, may be classified as follows: Geology, Mining, and Milling 89 or 58.5 per cent Smelting, Refining, an
Jan 1, 1936
-
Use of the Enviro-Clear Thickener at Quirke MillBy H. Ewaschuk
"INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt
Jan 1, 1977
-
Prospecting for Gold: Self-Assembly on Old CDsBy Hua-Zhong Yu
Gold is one of the most widely used substrate materials for self-assembly. Self-assembled monolayers (SAMs) prepared from alkanethiols and their derivatives on gold are the most reliable and well-stud
Oct 1, 2003
-
Hydrogen Cracking and Fracture of Galvanized Transmission Tower BoltsBy J. C. Thornley
Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si
Jan 1, 1979
-
Electrochemical Characteristics of Iron Sulfide Minerals in the Presence of SMBS and TETA and the Case for Their Joint ActionBy A. M. L. Cushing, S. Kelebek, A. Ghahreman
Iron sulfides are part of many ore deposits affecting flotation separation of non-ferrous base metals from them. Open-circuit potential (OCP), potentiodynamic polarization, and electrochemical impedan
Jan 1, 2017
-
Fracture Analysis at the Tasiast Open Pit Mine in Western AfricaBy A. C. Gagnon, H. Saroglou
"The focus of this paper is on the analysis of geometrical discontinuity properties for the rock mass located within an open pit mine located in Western Africa. Discontinuity data were collected using
Jan 1, 2015
-
The Systematic Reclamation of Gold Mine TailingsBy Jean-Claude LeRoy, Herman Keller
"INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part
Jan 1, 1975
-
New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)By R. S. Simkus, J. R. Egan
"Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct
Jan 1, 1994
-
Concerning Ore-ShootsBy G. Vibert Douglas
It has long been recognized that there are considerable difficulties connected with the physical and chemical explanation of shoots of ore. The literature of Mining Geology has frequent references to
Jan 1, 1934
-
Stope-and-Pillar Design for the Elliot Lake Uranium MinesBy D. G. F. Hedley, F. Grant
"In 1958, the Ontario Department of Mines appointed a committee to study the accident situation and mining methods used in the uranium mines in the E1liot Lake district. This committee reviewed the ex
Jan 1, 1972
-
Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
Measuring Grade-Recovery and Partition Curves of Dense Minerals by Batch Fractionation in a Laboratory-Scale Reflux™ Classifier"Sink-float analysis is often used to obtain yield-ash and density partition curves in the coal industry. These provide a valuable tool for evaluating the performance of a separation process. However,
Jan 1, 2016
-
Les Aspects Regionaux de la Dispersion Glaciaire, Chibougamau, QuebecBy M. Bouchard et G. Martineau
In the Chibougamau area, a large portion of the glacially tranported boulders which were deposited at the surface were later partly remobilized by the waters of Glacial Lake Ojibway. In the dispersal
Jan 1, 1984
-
Simulating the Effect of LHD Operations on Production Rates and Ventilation Costs in a Sublevel Cave Underground Mine"Load-haul-dump machines (LHDs) are typically used in underground metal mining operations. Delays or inappropriate use of LHDs can result in production loss. Optimized LHD use is especially crucial in
Jan 1, 2019
-
Drum Hoists ? Case StudyBy Gordon F. Scott
This paper considers a recently completed hoist project for IAMGOLD. Called the Westwood project, this mine utilises some of the largest drum hoists supplied to the North American Market in recent tim
May 1, 2011
-
The Highmont Concentrator StartupBy R. S. Fukuhara, M. J. Allan
"Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the
Jan 1, 1982
-
Labour Market Intelligence; An update for the Canadian Mining IndustryOVERVIEW OF PRESENTATION ? What is LMI ? Who uses LMI and how? ? Value of LMI to the Mining Industry ? Mining Industry Workforce Information Network (MIWIN) ? The Challenge: Forecasting the futur
May 1, 2009
-
Kansanshi Copper Smelter: The First Four Years of OperationBy S. Hunt, D. de Vries
Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe
Jan 1, 2019
-
Significant Improvements are Possible from Process OptimizationBy Jon R. Maki
"EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for
Jan 1, 2014