Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Les Terrains Auriferes Site -Site Closure and Rehabilitation, Conceptual to Construction

    By R. Knapp, R. Firlotte

    "Les Terrains Auriferes (LIA) Property, formerly the Malartic Goldfield (Goldfield) mine, ceased its remaining milling operations in the fall of 1994. During the early years of mining, the mill proces

    Jan 1, 1997

  • CIM
    Introduction of China’s Copper Converting Technologies

    By Huilan Yang, Feng He

    This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting

    Jan 1, 2019

  • CIM
    Teck’s Secondary Leaching Technology

    By H. M. Lizama, R. L. Stephens

    Secondary leaching of previously leached supergene copper ore has been developed and implemented at Teck’s Quebrada Blanca operations. This consists of using in-situ leaching techniques aided by geoph

    Jan 1, 2019

  • CIM
    High SO2 Feed Gas Sulfuric Acid Plant Design Option

    By D. J. McLaws

    "Recent innovations in metal smelting technology utilize continuous oxygen-enriched smelting and converting processes which are capable of producing off-gases containing up to 60% SO2 or more. Other S

    Jan 1, 2014

  • CIM
    Pressure Welding, Solid-State: Role of Hot Deformation

    By H. J. McQueen

    Pressure welding is a solid state joining technique that depends on bringing the parts into sufficiently close contact that inter-atomic bonds are achieved. Pressing is more effective at elevated temp

    Jan 1, 2011

  • CIM
    Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh Mine

    The uphole bench extraction strategy at EKJV Management Pty Ltd?s Raleigh Mine, requires simultaneous horizontal and vertical exposure of paste filled stopes. In order to prevent excessive ore dilutio

    May 1, 2007

  • CIM
    Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication Backbone

    By Christoph Mueller

    Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi

    May 1, 2006

  • CIM
    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    Secondary Copper Smelting

    By B. Karnath, K. Guha, S. Tandon

    At Jhagadia Copper Ltd (India), Copper is produced through secondary route using Top Blown Rotary Converter (Kaldo Furnace). The basic raw material being treated includes Matte-slag Reverts, Copper Ca

    Jan 1, 2007

  • CIM
    Chemostratigraphy of Volcanic Rocks Hosting Massive Sulfide Clasts Within the Meductic Group, West-Central New Brunswick

    By L. R. Fyffe, D. R. Lentz, S. H. Mcclenaghan

    "Abstract - The Eel River area in the southwestern Miramichi terrane of New Brunswick contains a complete calc-alkaline suite of volcanic rocks that are interlayered with intervals of sedimentary and

    Jan 1, 2006

  • CIM
    Linking Flotation Efficiency to Bubble Size

    By Jose R. Hernandez-Aguilar

    "This paper revisits data from previous studies (Hernandez-Aguilar, 2010, 2011) to better understand the link between metallurgical performance and pulp-zone bubble size (Db) in full-scale flotation s

    Jan 1, 2017

  • CIM
    Computer Control of Flotation Circuits at Frood Stobie Mill

    By G. Styles, K. Lye, R. Tenbergen, M. Mayhew

    Requirements to produce a higher bulk concentrate grade have necessitated extensive use of on-stream analyser data and computer programming to obtain the targets set for Frood Stobie Mill as required

    Jan 1, 1985

  • CIM
    Effect of Acid Laden Mining Effluent on Characterization and Physio-Chemical Behaviour of Clayey and Sandy Soil

    By V. Murugaiyan

    The Geotechnical Engineer is faced to view problems emerging from the task of protecting the environment and also the problems related to prevention of natural hazarders. Geo-Environmental Engineering

    May 1, 2004

  • CIM
    Laser measurement of open stope dilution

    By Yve Potvin, Fabien Miller, Deni Jacob

    "The potential benefits of measuring the volume of excavated open stope are enormous. By comparing the actual excavation of the orebody contour, it is possible to determine the “real"" amount of minin

    Jan 1, 1992

  • CIM
    Climate Change: Framing The Challenge; Strategic Approaches for the Mining Industry

    By Henry Stoch

    It?s a green, green world ? Public concern about the impact of human activities on the environment and the roles that businesses play in that impact is rising. What?s happened in the last few months

    May 1, 2008

  • CIM
    Evolution Tectonique d'une Portion du Sillon de Roches Vertes de Chibougamau

    By R. Daignault et G. O. Allard

    The Chibougamau area represents a part of the Abitibi greenstone belt. The rocks constitute a volcanic pile (Roy Group) overlain by a volcano-detritic sequence (Opemisca Group). Three important period

    Jan 1, 1984

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Simulation and Formability of Automotive Aluminum Alloy Sheet and Tube

    By J. T. Chen, S. Winkler, M. J. Worswick, O. Orlov

    This paper presents a review of research conducted at the University of Waterloo concerned with the application of aluminum alloy sheet and tube in automotive structures and body panels. The research

    Jan 1, 2006