Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Errington and Vermilion Lake MinesBy William C. Martin
"Consolidated Sudbury Basin Mines Limited owns two mines, 4 miles apart, near the southwest end of Sudbury Basin. The Errington mine lies close to the north boundary of Creighton Township and about 18
Jan 1, 1949
-
The Upgrading of Tin Ore by Continuous AgglomerationBy A. Mykytiuk, I. E. Puddington, W. D. Macleod, F. W. Meadus
"A laboratory-scale continuous procedure for the up-grading of naturally occurring tin ores, based on the principle of spherical agglomeration, is described. High recoveries are indicated. A proposed
Jan 1, 1966
-
Alternative technology to decrease the environmental impact of gold milling a progress report on CANMET research activities in this fieldBy R. E. Molnar, P. A. Riveros, V. M. McNamara
"This paper describes some recent research done at CANMET in the areas of ion exchange and A VR (Acidification- Volatilization Reneutralization), as applied to the recovery of gold and cyanide, respec
Jan 1, 1993
-
Influence of Structure on the Corrosion Properties of Aluminium AlloysBy Jirí Faltus
The paper deals with studying the impact of structural properties and anodizing of surface on the corrosion properties of extruded rods from commercial aluminium alloys: AA6082, AA6262, AA6012, AA2007
Jan 1, 2015
-
Stability Assessment of Rock Slopes: Towards an Inverse-Reliability-Based MethodologyBy Xiang Li, Xibing Li
It is paramount that the stability of rock slopes be correctly accounted for under diverse operating and environmental conditions. Owing to different sources of uncertainty entailed in such stability
Jan 1, 2015
-
Outokumpu Blister Smelting Processes-Clean Technology StandardsBy I. V. Kojo
Continuous development of technologies has been self-explanatory for Outokumpu Technology's engineers for decades. The aim in the development has always been the improvement of profitability of t
Jan 1, 2007
-
Handling and Storage of Coal at Large Canadian Electric UtilitiesBy S. F. Featherby
"This paper traces briefly the historical development of coal handling systems to meet the needs of a rapidly developing thermal power generation technology. The wide range of operating requirements i
Jan 1, 1966
-
Condition Monitoring and Basic Maintenance?. One Without the Other?? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti
Aug 1, 2013
-
Elk River CollieryBy W. C. Whittaker
COMPLETED in November, 1943, at a cost of over $1,500,000, Elk River colliery of the Crow's Nest Pass Coal Company, Limited, has been laid out and equipped for an ultimate annual production of 1,
Jan 1, 1944
-
Some Insights into the Process Design of Ferronickel SmeltersBy S. Mostaghel, S. Nicol, M. Y. Solar
Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra
Jan 1, 2014
-
On the utilization of nickel smelter slagsBy Gerhard Heinrich
"The composition and the possible utilization of a slag sample from a nickel smelter operation in the Sudbury district were investigated. The sample containing 0.136% Ni, 0.10% Co and 0.29% Cu could b
Jan 1, 1989
-
Dynamic Simulation and Model Based Real-Time Optimization of SAG Mills Using Genetic AlgorithmsBy J. Salazar
This paper presents a dynamic simulator of the semi-autogenous grinding operation deduced from first principles (non-stationary population balances) coupled to a Model-Based Real-Time Optimization (MB
Jan 1, 2007
-
Dragline monitoring, control, and navigationBy J. Hansen
"ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti
Jan 1, 2000
-
Sustainable Development ? From by-Product Synergy to Capital Stock TurnoverBy Gordon E. Forward
Sustainable development in the mining and metallurgical industrial sectors can be implemented by two distinct groups: 1. The managers and operators of existing facilities ? working with industrial p
May 1, 2002
-
Outreach with Education to Link Mining and ClassroomsBy Maureen E. Lipkewich
Education builds long term awareness, acceptance and support for responsible mineral resource development. The MABC Education Program is an award winning education partnership with British Columbia cl
May 1, 2002
-
Gold Losses at Klondike Placer MinesBy R. Clarkson
"The Yukon's numerous (185) placer gold mines are still a major social and economic force in this developing economy. Gold recovery at each of the various sluiceboxes is not optimized due to extremely
Jan 1, 1990
-
Platinum and Rhenium Recovery from Reforming Catalysts via Plasma Arc TechnologyBy D. E. Deegan, P. M. Keeley, N. A. Rowson, T. Stachowski
An investigation into the use of Tetronics International’s thermal plasma technology based pyrometallurgical smelting process for the recovery of both platinum and rhenium was conducted. 1000 kg of Pt
Jan 1, 2015
-
Effect of Waste Plastics Addition on the Reduction of Iron Oxide by SawdustBy James Ransford Dankwah
This work investigates the effect of waste plastics addition on the reduction of iron oxide by sawdust. Composite pellets of iron oxide containing sawdust (SD), high density polyethylene (HDPE) and bl
Jan 1, 2014
-
The Deformation and Recrystallization of Commercially Pure Mg and Mg-Y AlloysBy R. Cottam
The deformation and recrystallisation of magnesium yttrium alloys containing 0.23, 0.84 and 2.71wt% yttrium and commercially pure magnesium extrusion has been investigated at temperatures between 200
Jan 1, 2006
-
Standardization of Data Formats as Basis for Future Efficient Mine ProductionBy Christoph Mueller
Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro
May 1, 2002