Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Wall control blasting practices at the EkatiTM diamond mineBy J. Peterson, D. D. Tannant, J. Todd
"A review of blast designs and improved blasting practices at the EkatiTM diamond mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inv
Jan 1, 2001
-
Enhance Mining System Reliability Through System Integration ApproachThe reliability of mining systems is generally low due to their harsh working conditions. Currently, efforts for improving mining system reliability are often made in isolation. This practice could su
Aug 1, 2013
-
MetalsBy Lawrence Bragg
WE associate metals with hardness, toughness, and strength. But a curious paradox lies at the root of the valuable mechanical proper-ties of the metallic state: in order to be strong, a metal must be
Jan 1, 1943
-
Complete Refractory Gold SolutionsBy C. Van Den Heuvel, C. B. Van Buuren
BIOX® has been successfully demonstrated over the past 2 decades for the recovery of gold from refractory sulphide concentrates. To date 12 successful BIOX® plants have been installed in 8 countries s
Jan 1, 2014
-
Geotechnical Design Of The Roby Pit, Lac Des Iles MineBy David Stone
North American Palladium is the owner/operator of the Lac des Iles mine located 115 km north of Thunder Bay, Ontario. The mine has produced an average of 65,000 ounces of palladium since 1994. Lac de
May 1, 2001
-
Guniting at the McIntyre MineBy D. E. Keeley
Introduction Gunite is a mixture of sand and cement applied to any surface by being shot by compressed air through a nozzle, where it is wetted just before leaving the orifice. The mixture is transpo
Jan 1, 1934
-
The Pre-Mississippian Veins and Deposits of the Cariboo DistrictBy Douglas Lay
Attention has been drawn in the publications of the Department of Mines to the view that veins of two different ages occur in the Cariboo district, namely, those of Jura-Cretaceous age and those of pr
Jan 1, 1936
-
Design and Construction of Natural Gas Transmission LinesBy B. W. Snyder
INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h
Jan 1, 1951
-
Sulphuric Acid and Liquid Sulphur Dioxide Manufactured from Smelter Gases at Copper Cliff, OntarioBy R. W. Allgood
"THE world-wide shortage of elemental sulphur, which became sharply apparent in 1950, has focused attention on the commercial exploitation of sulphur-bearing materials such as pyritic ores, sour natur
Jan 1, 1952
-
Recovery of Scandium from Industrial Process Solutions – Observations from Preliminary TestingBy Frédéric Bélanger, George P. Demopoulos, Pascal Coursol, Thomas Feldmann
"The use of scandium in industrial applications is expected to rise in the coming years, in large part due to the expected adoption of new, clean energy technologies such as solid oxide fuel cells or
Jan 1, 2016
-
Scheduling Production by the Critical Path Method at McIntyreBy P. O. Parfitt
At the McIntyre mine, there are two distinct operations: a gold mine with narrow veins, mined by cut-and-fill methods, and a copper mine with large, open, long-hole stopes. The application of the Crit
Jan 1, 1967
-
Process development by Dynatec for the Ambatovy Nickel ProjectBy J. Stiksma, R. Kalanchey, M. J. Collins, G. Owusu, R. Raudsepp, K. R. Buban, L. A. Barta, I. M. Masters
This paper describes the results of testwork for the treatment of Ambatovy laterite ore by a pressure acid leach process, with recovery of the soluble nickel and cobalt values as mixed sulphide interm
Jan 1, 2005
-
Post-War Problems of the Young EngineerBy Geo. E. Cole
A GREAT deal of time and energy is now being devoted to the study of post-war reconstruction and rehabilitation, in spite of the fact that as yet we have not won the war in which we are presently enga
Jan 1, 1943
-
Time ? A Key Seismic Source ParameterBy Marty Hudyma
There are five independent seismic source parameters: seismic energy, seismic moment, source size, location, and time. These parameters are investigated primarily for evaluating seismic hazard and und
Jun 1, 2012
-
Mining Automation ProgramBy C. J. Preston, R. E. Ström, G. R. Baiden
"On January 1st 1996 Inco Limited, Tamrock OY, Dyno Explosives Group and CANMET formed a consortium for the development of robotic mining equipment. This project is a five year research and developmen
Jan 1, 1997
-
Rapid graphical analysis of rock slopesBy D. M. Cruden
"When two discontinuities form a tetrahedral wedge in a rock slope, a factor of safety for the wedge can be simply calculated (if motion is driven only by gravity and resisted only by friction) from p
Jan 1, 1990
-
Operating Cost Budgets for MinesBy Leonard Kellogg
Introduction The Mine Manager or Superintendent is a man faced with a difficult problem. He must direct the activities of his mine in such a manner that, over a period of time, the greatest possible
Jan 1, 1952
-
A Process for Cleaning Molybdenite ConcentrateBy F. K. McKean
Abstract A discussion of the difficulties involved in the production of a clean molybdenite concentrate introduces the paper. There is a brief description of the various methods for producing molyb
Jan 1, 1947
-
Simulation models for mineral processing plantsBy J. W. Merks
"Simulation is the process of designing a computerized model, of a system or procedure, for the purpose of understanding its behaviour and developing strategies to control its operation. Simulation mo
Jan 1, 1991
-
Mount Isa Mines Necessity Driving InnovationBy N. Aslin, G. Heferen, H. DeWaal
"Mount Isa Mines (MIM) acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry starting in the 1978’s through until the early 2000’s.
Jan 1, 2018