Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Wall control blasting practices at the EkatiTM diamond mine

    By J. Peterson, D. D. Tannant, J. Todd

    "A review of blast designs and improved blasting practices at the EkatiTM diamond mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inv

    Jan 1, 2001

  • CIM
    Enhance Mining System Reliability Through System Integration Approach

    The reliability of mining systems is generally low due to their harsh working conditions. Currently, efforts for improving mining system reliability are often made in isolation. This practice could su

    Aug 1, 2013

  • CIM
    Metals

    By Lawrence Bragg

    WE associate metals with hardness, toughness, and strength. But a curious paradox lies at the root of the valuable mechanical proper-ties of the metallic state: in order to be strong, a metal must be

    Jan 1, 1943

  • CIM
    Complete Refractory Gold Solutions

    By C. Van Den Heuvel, C. B. Van Buuren

    BIOX® has been successfully demonstrated over the past 2 decades for the recovery of gold from refractory sulphide concentrates. To date 12 successful BIOX® plants have been installed in 8 countries s

    Jan 1, 2014

  • CIM
    Geotechnical Design Of The Roby Pit, Lac Des Iles Mine

    By David Stone

    North American Palladium is the owner/operator of the Lac des Iles mine located 115 km north of Thunder Bay, Ontario. The mine has produced an average of 65,000 ounces of palladium since 1994. Lac de

    May 1, 2001

  • CIM
    Guniting at the McIntyre Mine

    By D. E. Keeley

    Introduction Gunite is a mixture of sand and cement applied to any surface by being shot by compressed air through a nozzle, where it is wetted just before leaving the orifice. The mixture is transpo

    Jan 1, 1934

  • CIM
    The Pre-Mississippian Veins and Deposits of the Cariboo District

    By Douglas Lay

    Attention has been drawn in the publications of the Department of Mines to the view that veins of two different ages occur in the Cariboo district, namely, those of Jura-Cretaceous age and those of pr

    Jan 1, 1936

  • CIM
    Design and Construction of Natural Gas Transmission Lines

    By B. W. Snyder

    INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h

    Jan 1, 1951

  • CIM
    Sulphuric Acid and Liquid Sulphur Dioxide Manufactured from Smelter Gases at Copper Cliff, Ontario

    By R. W. Allgood

    "THE world-wide shortage of elemental sulphur, which became sharply apparent in 1950, has focused attention on the commercial exploitation of sulphur-bearing materials such as pyritic ores, sour natur

    Jan 1, 1952

  • CIM
    Recovery of Scandium from Industrial Process Solutions – Observations from Preliminary Testing

    By Frédéric Bélanger, George P. Demopoulos, Pascal Coursol, Thomas Feldmann

    "The use of scandium in industrial applications is expected to rise in the coming years, in large part due to the expected adoption of new, clean energy technologies such as solid oxide fuel cells or

    Jan 1, 2016

  • CIM
    Scheduling Production by the Critical Path Method at McIntyre

    By P. O. Parfitt

    At the McIntyre mine, there are two distinct operations: a gold mine with narrow veins, mined by cut-and-fill methods, and a copper mine with large, open, long-hole stopes. The application of the Crit

    Jan 1, 1967

  • CIM
    Process development by Dynatec for the Ambatovy Nickel Project

    By J. Stiksma, R. Kalanchey, M. J. Collins, G. Owusu, R. Raudsepp, K. R. Buban, L. A. Barta, I. M. Masters

    This paper describes the results of testwork for the treatment of Ambatovy laterite ore by a pressure acid leach process, with recovery of the soluble nickel and cobalt values as mixed sulphide interm

    Jan 1, 2005

  • CIM
    Post-War Problems of the Young Engineer

    By Geo. E. Cole

    A GREAT deal of time and energy is now being devoted to the study of post-war reconstruction and rehabilitation, in spite of the fact that as yet we have not won the war in which we are presently enga

    Jan 1, 1943

  • CIM
    Time ? A Key Seismic Source Parameter

    By Marty Hudyma

    There are five independent seismic source parameters: seismic energy, seismic moment, source size, location, and time. These parameters are investigated primarily for evaluating seismic hazard and und

    Jun 1, 2012

  • CIM
    Mining Automation Program

    By C. J. Preston, R. E. Ström, G. R. Baiden

    "On January 1st 1996 Inco Limited, Tamrock OY, Dyno Explosives Group and CANMET formed a consortium for the development of robotic mining equipment. This project is a five year research and developmen

    Jan 1, 1997

  • CIM
    Rapid graphical analysis of rock slopes

    By D. M. Cruden

    "When two discontinuities form a tetrahedral wedge in a rock slope, a factor of safety for the wedge can be simply calculated (if motion is driven only by gravity and resisted only by friction) from p

    Jan 1, 1990

  • CIM
    Operating Cost Budgets for Mines

    By Leonard Kellogg

    Introduction The Mine Manager or Superintendent is a man faced with a difficult problem. He must direct the activities of his mine in such a manner that, over a period of time, the greatest possible

    Jan 1, 1952

  • CIM
    A Process for Cleaning Molybdenite Concentrate

    By F. K. McKean

    Abstract A discussion of the difficulties involved in the production of a clean molybdenite concentrate introduces the paper. There is a brief description of the various methods for producing molyb

    Jan 1, 1947

  • CIM
    Simulation models for mineral processing plants

    By J. W. Merks

    "Simulation is the process of designing a computerized model, of a system or procedure, for the purpose of understanding its behaviour and developing strategies to control its operation. Simulation mo

    Jan 1, 1991

  • CIM
    Mount Isa Mines Necessity Driving Innovation

    By N. Aslin, G. Heferen, H. DeWaal

    "Mount Isa Mines (MIM) acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry starting in the 1978’s through until the early 2000’s.

    Jan 1, 2018