Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Response of the Flir Airtec Monitor to Airborne Coal Dust

    By E. Cauda, K. Phillips

    "Diesel particulate matter (DPM) exposures are a serious occupational health hazard in underground mines. While the complex nature of DPM makes direct analysis difficult, its primary component, elemen

    Jan 1, 2019

  • CIM
    Automation to Change the way we Mine in Narrow-Veins

    By Ben R. Bjorkman

    The future is here ? or at least that?s what Mine Planners predicted some 15 years ago ? that by 2004 we would have man-less mines running themselves using space-aged technology. Truthfully, though, t

    Oct 1, 2004

  • CIM
    Process for the Complete Utilization of Oil Sands Fly Ash

    By T. H. Etsell, P. C. Holloway

    The fly ash produced by oil sands operations in northern Alberta represents a large, high-grade, potential resource for vanadium production in Canada. After extensive batch testing at the University o

    Jan 1, 2004

  • CIM
    Concentration of Tantalum .from the Bernie Lake Pegmatite Deposit, Manitoba

    By D. Raicevic

    Interest has recently been revived in the recovery of tantalum from the Bernie Lake pegmatite deposit. A gravity concentration process was developed to give satisfactory recovery and concentrate grade

    Jan 1, 1968

  • CIM
    Gold mineralization of the sulphidepreview lakes area, la ronge belt

    By Robert S. G. Chapman, Kieran M. J. Downes

    The Sulphide-Preview Lakes area is located 45 km northeast of La Ronge in northern Saskatchewan. It lies within the southern portion of the Proterozoic La Ronge Volcanic-Sedimentary Belt. Two styles o

    Jan 1, 1986

  • CIM
    INMET Mining Operationalizing the Ruggie Framework in a Mining Context

    Operationalizing the Ruggie Framework in a Mining Context Ruggie?s 3 Pillars: The State?s duty to Protect Policies, regulation, adjudication The Corporation?s responsibility to respect Acting with

    May 1, 2013

  • CIM
    Impurity Disposition and Control in the Ravensthorpe Acid Leaching Process

    By D. T. White

    Pressure acid leaching of nickel laterite ores typically involves the production of an intermediate product that is releached and refined to pure nickel and cobalt products. BHP Billiton is developing

    Jan 1, 2006

  • CIM
    Solution Management at the Mantoverde Division of Anglo American Chile

    By U. Troncoso

    Mantoverde is a heap leach-SX-EW operation that was commissioned in December 1995 at a production rate of 42,130 ton of copper per year and 5.4 million ton of ore per year. Copper production has been

    Jan 1, 2007

  • CIM
    Geostatistical Modeling of Particle Size Distributions in The McMurray Formation

    By O. Babak, J. G. Manchuk

    ABSTRACT A significant factor in evaluating bitumen recovery from an oil sands mine is the particle size distribution (PSD). Increased understanding of mined ore quality and improvement in predictions

    Jan 1, 2013

  • CIM
    The Use of Enhanced Gravity Concentration for Precious Metal Recovery

    By Steve McAlister, Colin Sprake

    "Enhanced gravity concentration machines have been applied successfully in the following areas of precious metal recovery flowsheets:1. Primary Grinding Circuits2. Shaking Table Tailings3. Pre-Concent

    Jan 1, 2003

  • CIM
    Copper Leaching Aids ? Compatibility with the Copper Solvent Extraction Process

    By G. Kordosky

    Leaching aids that result in an increase in leaching rates and overall copper recovery have the potential to be beneficial to copper leach/solvent extraction/electrowinning operations. It is generally

    Jan 1, 2007

  • CIM
    Predicting Nickel Recoveries at the Thompson Mill from Feed Mineralogy

    By F. D. Ford, Z. Dai, A. Byers

    Manitoba Mining and Milling operations consist of three underground mines (Thompson T1, T3 and Birchtree), feeding the Thompson Mill. Three years ago, a collaborative effort involving Mines Exploratio

    Jan 1, 2015

  • CIM
    Kinetics of the Galvanic Reduction of Chalcopyrite Concentrates by Copper

    By Matthew Novak, J. Brent Hiskey

    It is well known that when chalcopyrite is put in direct contact with copper in an acidic medium a galvanic cell is created. Chalcopyrite is reduced to iron and sulfur deficient defect phases such as

    Jan 1, 2014

  • CIM
    The application of high density paste backfill at Dome Mine

    By D. L. Churcher, R. J. Perry

    "In recent years much work has been don e to examine alternate underground backfill support systems with the objectives of improving ground support and reducing mining costs. This report deals with th

    Jan 1, 1990

  • CIM
    Suggested Criteria for the Custody Transfer Design of Automatic Installations

    By K. H. Kretzschmar, M. A. Smith

    A brief review of the rapid growth of ACT in Western Canada is presented. It is remarked that this rap-id growth has been accompanied by a heterogeneous approach to design. A more rational and consist

    Jan 1, 1960

  • CIM
    A Hyper-Manual on Expert Systems for the Mineral Industry

    By J. A. Meech

    "The technology known as Expert Systems is being used within the minerals industry in a wide variety of problem areas. Applications include diagnosis, prediction, training, monitoring and control. Exp

    Jan 1, 1993

  • CIM
    Diamonds, Kimberlites, Lamproites and Related Rocks in the United States

    By W. Dan Hausel

    "Abstract-Hundreds of diamonds have been found in the United States. The majority of the discoveries occurred during the 19th century as a by-product of placer gold mining. Most of these early diamond

    Jan 1, 1995

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Innovative CRF batch plant design at the Leeville Mine, Nevada

    By A. E. Reschke

    Optimized mine planning of the Leeville Gold Mine, Nevada, necessitated the requirement for an average of 2540 tpd of high quality cemented rockfill (CRF) in primary stoping blocks and underhand cut a

    May 1, 2007

  • CIM
    Influence of castable design on the bingham to dilatancy transition

    By M. Rigaud, K. Sankaranarayanane, X. Zhou

    The effect of varying fine alumina/ultra-fine alumina ratio on the Bingham to dilatancy transition in alumina based, self-flowing refractory castables has been studied in detail employing rheological

    Jan 1, 2004