Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comparison of Resin-In-Pulp and Direct Precipitation for Recovery of Uranium in Alkaline Leach Circuits

    By D. Van Tonder

    ABSTRACT The comparative economics of ion exchange and direct precipitation have been analyzed by developing indicative CAPEX/OPEX models for typical alkaline leach uranium circuits. An agitated tank

    Jan 1, 2012

  • CIM
    Simulation of Bulk Earthwork and Quarry Material Delivery During Surface Mine Transformation

    By S. Duvah Pentiah

    The transformation of an open pit coal mine to a horizontal-punch underground mine is subject to a number of challenges. These include scheduling the operation of various sizes of trucks over a long p

    Aug 1, 2013

  • CIM
    Research Progress on Stability Classification for Rocks Surrounding Coal Roadways in China

    By Renliang Shan

    Site conditions of China?s coal roadways are complex and changeable, and scientific classification of them is the fundamental basis for coal roadway support design, with great significance for ensurin

    Aug 1, 2013

  • CIM
    Mining, mineral processing, and mini-machines

    A mini- or micro-machine is a small electro- mechanical device. There are several existing applications of micro-sensors such as the accelerometers used in automobile airbags or the force sensors and

    Jan 1, 2002

  • CIM
    Evaluation of Shotcrete Rock Support Systems in Underground Mines by a New Non-Intrusive Technique

    By Moe Momayez

    Shotcrete is a practical and economical support system in many Canadian underground mines. Although shotcrete technology has gained acceptance in the mining industry, there are some problems that have

    May 1, 2001

  • CIM
    Capacity Enhancement at Newmont Mining Corporation’s Twin Creeks Whole Ore Pressure Oxidation Facility

    By T. Krumins, F. C. Ruff, M. Eichhorn, L. Zunti

    Hatch Ltd. has recently completed a project to increase refractory gold ore processing capacity at Newmont Mining Corporation’s Twin Creeks facility. The objective of the project was to increase throu

    Jan 1, 2014

  • CIM
    Hydrodynamic modelling of hydrometallurgical unit operations

    CSIRO Minerals, in association with the AJ Parker CRC for Hydrometallurgy, has an active program of hydrometallurgical research in which physical and computational modelling are used to better underst

    Jan 1, 2005

  • CIM
    Isasmelt™ - Smelting more with Less

    By Biplop Das, E. Herrera, A. Burrows, P. J. Mackey, G. R. F. Alvear Flores

    Since the first commercial plant was built at Mount Isa, another twenty ISASMELT™ furnaces have come into commercial operation, and construction of new plants continues. The primary copper ISASMELT™ t

    Jan 1, 2015

  • CIM
    Clinker deposits in Saskatchewan

    By Paul Guliov

    Coal-bearing Tertiary sediments of the Ravenscrag Formation in southern Saskatchewan host numerous deposits of clinker resulting from in situ coal combustion. Clinker deposits form when sediments of r

    Jan 1, 2001

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • CIM
    Incorporation of Geometallurgical Modelling into Long-Term Production Planning

    By K. Waters, A. Navarra, T. Grammatikopoulos

    Strategic decisions to develop a mineral deposit are subject to geological uncertainty, due to the sparsity of drill core samples. The selection of metallurgical equipment is especially critical, sinc

    Jan 1, 2017

  • CIM
    Tempering Heat Treatment Process for Repairing Damaged Turbine Rotors

    By S. Rash Ahmadi

    One of the most important elements in power plants is rotors and repairing the damaged rotors is very important in view point of economics. One of the most complicated problems in power plants is incr

    Oct 1, 2011

  • CIM
    Longwall Mining at Sydney Mines

    By J. J. McDougall

    Until quite recently, the coal in the Cape Breton field was won from comparatively thick seams with light cover, and from submarine areas, and the system of mining naturally followed was pillar-and-st

    Jan 1, 1928

  • CIM
    Boliden Westmin Limited - Gibraltar Mine

    By Harry Siewert, Tom Milner, Jack Stickney

    "LocationThe Gibraltar mine is located in central British Columbia (NTS 93B/9W), 362 km north of Vancouver. Access is provided by 20 km of paved road from McLeese Lake, which lies 45 km north of Willi

    Jan 1, 2000

  • CIM
    Modelling Heavy-Tailed Coarse Gold Deposits with a Spatial Point Process

    By J. B. Boisvert, W. Board, C. R. Mooney

    "Traditional geostatistical modelling methods are difficult to apply to heavy-tailed deposits because the extreme positive skew of the grade distribution leads to bias. The focus here is on an innovat

    Jan 1, 2015

  • CIM
    Siscoe Mine

    By W. F. James

    "The property of Siscoe Gold Mines, Limited, comprises about 1,600 acres, including Siscoe island and adjacent claims under water in Montigny lake, in Dubuisson and Vassan townships, Quebec.For many y

    Jan 1, 1954

  • CIM
    Predicting HVAC Energy Consumption in Commercial Buildings Using Multiagent Systems

    By Nn Li

    Energy consumption in commercial buildings has been increasing rapidly in the past decade. The knowledge of future energy consumption can bring significant value to commercial building energy manageme

    Aug 1, 2013

  • CIM
    Weldability of Haynes® 282® Alloy

    By H. J. White

    The effect of alloying elements on the mechanical properties and weldability of wrought gamma prime strengthened nickel- base superalloys is well known. An understanding of the basic guidelines concer

    Jan 1, 2010

  • CIM
    Stabilization of Lead and Zinc Flotation Circuits at Galmoy Mine, Kilkenny, Ireland

    By Paul Laframboise, Nigel MacDonald, Mike Hallewell, Robert Thorpe

    "Galmoy Mine, owned by Arcon Mines Limited, has operated since 1997, and is one of three operating lead/zinc mines in Ireland. Changes in ore type starting in mid 2002 created challenges to metallurgi

    Jan 1, 2005

  • CIM
    Diesel steam reforming for SOFC systems

    By B. A. Peppley

    The current most common method of hydrogen production for fuel cell systems, including SOFC systems, is autothermal reforming. Autothermal reformers have a number of advantages including fast start up

    Jan 1, 2005