Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development Of Lead Free Copper Alloy "Ecobrass®"

    By K. Oishi

    We have developed a 76Cu-3Si-21Zn alloy "ECOBRASS®" containing no lead. When 3% Si is added to a 78Cu-22Zn alloy, kappa and gamma phases participate uniformly in the alpha matrix. When being machined,

    Jan 1, 2007

  • CIM
    "Advanced prognosis for life cycle management of future and legacy aircraft propulsion systems A Canadian perspective"

    By Jeff Bird, Xijia Wu, Prakash C. Patnaik

    "Prognosis and health management (PHM) is an evolving suite of technologies intended for application to the life cycle management (LCM) of mission/safety critical systems, with anticipated results, wh

    Jan 1, 2004

  • CIM
    Promoting Transparency in Central African Mineral Development

    By A. Ingelson, C. Nwapi

    "With growing international interest in mineral resources in Central Africa, the importance of transparency in resource development cannot be overemphasized. Without transparency, the region cannot ma

    Jan 1, 2015

  • CIM
    Application of Advanced Mining Technology in Open Pit Mines for Optimizing Waste Dumping and Concurrent Land Reclamation

    By A. K. Debnath

    Mining being a site specific activity, land becomes the prime requirement for starting, successful execution and closure of any mining project. Many important mining projects are not progressing satis

    Aug 1, 2013

  • CIM
    Towards a Practical Stope Reconciliation Process in Large-Scale Bulk Underground Stoping Operations, Olympic Dam, South Australia

    "This paper deals with the reconciliation of open stope performance at Olympic Dam, South Australia, with a focus on stope stability, recovery, and operational aspects of stope reconciliation in relat

    Jan 1, 2015

  • CIM
    Asbestos in asphalt

    By M. Cossette, V. H. Tran

    "How can the durability of asphalt pavement be doubled without increasing highway budgets? Asphalt containing asbestos can provide the desired performance with additional costs being made up by longer

    Jan 1, 1991

  • CIM
    Intelligent P&IDs, their creation and use in process hazard analysis of refineries and chemical plants

    By T. D. Traubert, J. T. Dietz, D. Catena

    "Canadian process industry experts have often observed the strong trend for U.S. industrial safety and environmental laws to creep across the border. These experts will be interested in new United Sta

    Jan 1, 1993

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • CIM
    A Method of Appraising Lost Production for Mined-Through Coal-Bed Methane Wells

    By Philip W. Johnson, Charles D. Haynes

    "Abstract - The coalbed methane industry has become a prominent source of domestic natural gas, with its technology having evolved over the past 30 years. Whereas most coalbed methane wells are able t

    Jan 1, 2006

  • CIM
    A Management System for Mine Reconciliation

    By Cesar Carrasco

    Mine reconciliation is the art and science of comparing predictions and real-world outcomes with the intent of revealing the true quality of performance of models, planning, mining, and mineral proces

    Oct 1, 2024

  • CIM
    Development of Fail-Safety system for Building Wall Cleaning Robot

    By J. Huh

    Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu

    Aug 1, 2013

  • CIM
    Environmental considerations in tailing disposal

    By G. W. Poling

    This paper evaluates current environmental protection legislation, guidelines and criteria, focusing mainly on the land and water disposal of mill tailings. Effluent criteria and regulatory mechanisms

    Jan 1, 1979

  • CIM
    Recycling of End-of-Life Waste CD/DVD as a Carburizer in Processing of Fe-C Alloys

    By R. Khanna, I. Mansuri, S. Devasahayam

    "Recycling polymer based end-of-life materials as carbon resources for a partial replacement of coke/coal can make important contributions towards enhancing the environmental sustainability of steelma

    Jan 1, 2012

  • CIM
    Electrical Power Cables as Applied to Mining Projects

    By C. F. Starr

    This paper deals with the various types of cable in use in mines, with special attention paid to their construction. There will be a few comments regarding the different insulants, jacketing materials

    Jan 1, 1969

  • CIM
    Mechanical Properties of Precipitation Hardened Supersaturated Al-Sc-Zr

    By Joseph Licavoli, Paul Sanders, Yang Yang

    "Al-Sc-Zr alloys form thermally stable L12 precipitates which provide high temperature strength. Although the overall fraction of L12 Al3Sc and Al3Zr may be increased by increasing scandium (Sc) and z

    Jan 1, 2018

  • CIM
    Ventilation Design and Operating Issues Relating to Underground Mines with High Elemental Sulphur Content

    "The ventilation-related risks from mines with elemental sulphur include dust explosions, spontaneous combustion with emission of heat and toxic sulphur dioxide or hydrogen sulphide gases, reactions w

    Jan 1, 2019

  • CIM
    An overview of Minnova's Ansil mine

    By J. Desrosiers

    "Minnova Inc. has five operating divisions thoughout Canada. One of them is Lac Dufault which was established in 1964.Lac Dufault is located 15 km north of Rouyn-Noranda, in what is known as Noranda v

    Jan 1, 1991

  • CIM
    Challenges in Pneumatic Conveying of Concentrate and Flue Dust at Copper Smelters

    By E. Lehtila, J. J. Talja, R. Jahila

    Kopar Oy is acknowledged for engineering and manufacturing of robust systems for bulk material handling, especially at power plants and non-ferrous smelters. We have over thirty years of experience wi

    Jan 1, 2019

  • CIM
    Sample bias and conditional probability ore reserve estimation at Valley

    By G. F. Raymond, W. P. Armstrong

    "At the time of this study, the Valley mine was producing 23 000 tonnes of ore per day from a large, low-grade porphyry copper orebody. Sulphide mineralization, principally bornite and chalcopyrite, o

    Jan 1, 1988