Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Metasomatic Norms and Mass Balance Chemico-mineralogic Models of HydrothermalAlteration SystemsBy Xiaolin Cheng, A. J. Sinclair
"Norm calculation procedures originally designed principally for igneous rocks are very rigid in their application and, in general, do not utilize important alteration minerals. For instance, volatile
Jan 1, 1995
-
Using hydraulic excavators to mine variably dipping coal seamsBy Ross G. Bertinshaw
"The Line Creek Mine of Crows Nest Resources started mining coal in the fall of 1981. There are seven mineable seams with thicknesses ranging from 1.5 to 13 metres and with dips varying from 0 degrees
Jan 1, 1985
-
Time-Between-Seismic Events to Enhance Seismic Source InterpretationBy D. Beneteau
Plotting sets of data collected over time using a frequency-magnitude distribution is common with both earthquake and mining seismology. A Time-Between-Events (TBE) analysis technique simply makes use
Nov 1, 2011
-
An analytical approach to the design of coal pillarsBy K. Barron
"A computer program is described which will analyze the stability of coal pillars. The extent of the peripheral failed zone and the central elastic core of the pillar, the stress distribution across t
Jan 1, 1984
-
An Approach to Observe Fractures Induced by Hydraulic FracturingBy S. Yano, S. Takagi, Y. Nagaya, T. Akai, T. Ishida, Z. Bennour, T. Suzuki
"It is often reported that the concept of single-plane-fracture is not sufficient to account for the productivity from shale gas/oil wells. Many researchers introduce the concept of the stimulated res
Jan 1, 2015
-
Effluent Treatment Practice at the David Bell MineBy A. N. Veltmeyer
"INTRODUCTIONTeck-Corona Operating Corporation's David Bell Mine is located 35 Km east of Marathon, Ontario. In conjunction with its 1000 tonne per day gold concentrator, the company operates an efflu
Jan 1, 1989
-
Are REE Exploration Companies Doing Enough and/or the Right Testwork to Avoid Plant Failure?By B. Yu, N. Verbaan, A. Mezei
The recent 20 years witnessed a boom and bust in the nickel laterite industry. Most notoriously is the story of the first three Western Australian nickel laterite projects which all suffered major ram
Jan 1, 2014
-
Toe buttressing procedure to stabilize slide zones for dragline stripping operationsBy Denni Nikols, Farrukh Z. Khan
"Highvale Mine, located at Wabamun, Alberta, produces thermal coal for TransAIta's Keephills and Sundance generating plants. Overburden stripping in the mine is conducted by draglines which norma
Jan 1, 1989
-
Proper equipment replacement timing the key to replacement economyBy R. E. Stewart
"Using the concept of economic life and marginal analysis, it can be shown that proper equipment replacement timing can save a mining company many thousands of dollars. To assist management with deter
Jan 1, 1980
-
Underground Development Work in the ArcticOperating and Social Considerations from a Contractor?s Perspective
May 1, 2013
-
Mining Operations and Slurry Pipelines Update and FutureBy R. A. Hill, J. D. Pitts
"Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio
Jan 1, 1978
-
Operating Risk in Economic Analysis for the Assessment of Design & Planning Alternatives in Underground Mine FeasibilitiesBy S. A. Kenzap
Risk & Uncertainty ? Uncertainty about a situation can often indicate risk, which is the possibility of loss, damage, or any other undesirable event. Most people desire low risk, which would translat
Oct 1, 2010
-
Effective Modeling and Estimation of Stratified DepositsBy Garth D. Kirkham
The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa
May 1, 2013
-
A Simplified Method to Determine lsoelectric Points of OxidesBy R. B. Roberts, A. L. Mular
A simple way to determine the IEP of oxide minerals is described. The method is shown to apply for fine powders of Fe203 and ZnO. The IEP lies at pH 6.95 for Fe203 and at pH 9.08 for ZnO.
Jan 1, 1966
-
Gold Alloy Deformation Processed Metal - Metal Matrix Composite WireBy Timothy W. Ellis
Wire Bonding is the dominant IC interconnection process presently used in the semiconductor assembly industry (1). The flexibility, adaptability and cost of wire bonding will continue to keep it as th
Oct 1, 2003
-
Hoist rope improvements through thermo plastic enhancementBy Bill Parnell
"Friction winders and double drum winders have been used in the vertical shaft mining industry for over 100 years. In that time, there have been many changes made in the electronic and mechanical fiel
Jan 1, 1995
-
Influence of Highly Permeable Geologic Structure on Inflows to A154 N/S Open Pit Diavik Diamond Mines Inc., Lac de Gras, NWTBy Jeff R. Reinson
The Diavik Diamond Mine is producing diamonds from two orebodies, the A154 South and A154 North kimberlite pipes, discovered beneath the waters of Lac de Gras. Innovative dike technology with appropri
May 1, 2006
-
Footwall anchoring at Smoky River Coal LimitedBy Peter L. Sheehan, David A. Fawcett, Dennis C. Martin
"Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to
Jan 1, 1988
-
The energy game: first down and four to goBy Robert B. Parsons
"First down and four to go. In the game Of football, this is not a bad position to be in. However, in this game of political football, it means that there is still a long way to go. The government in
Jan 1, 1981
-
Adapting to Ore Characteristics at Lac des Iles MineBy Erin N. Legault-Seguin
The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000
May 1, 2009