Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Financial and Geomechanical Optimization for Mine Pushbacks

    By M. Grenon

    OBJECTIVE ?To link slope stability and financial assessment algorithms into a commercially available mine design software packages to provide integrated global pit optimization.

    May 1, 2013

  • CIM
    Meeting the Technical, Ecological, and Social Challenges in the Decommissioning of Potash Mines in Eastern Germany

    By M. Kuyumcu

    With annual production of almost 3.5 million metric tonnes of K20, former East Germany (GDR) was the world?s third-largest producer of potash, ranking behind only the Soviet Union and Canada. More tha

    Aug 1, 2013

  • CIM
    Comparative Metallurgical Performance in Zinc Flotation

    By A. W. Stradling, M. J. Fairweather

    "The selective flotation of lead, zinc and iron sulphide minerals is key to the economic performance of concentrators treating zinc-lead ores. Diagnostic metallurgy is a tool to quantify mineral behav

    Jan 1, 2003

  • CIM
    Modelling of Blast-Induced Stress Wave Propagation and Fracturing In Hard Rock Material

    By Ali Mortazavi

    In underground mining applications, successful blasting results in less damage, which may lower support costs, lower dilution and produce a uniform fragmentation. The explosive detonation process crea

    May 1, 2002

  • CIM
    Narrow-vein Mining Experiences at the Ashanti Mine: A Case Study

    By Fidelis T. Suorineni

    The Ashanti mine, located in Obusai, Ghana, West Africa, has been in production for over 100 years, and is currently the second largest single gold producer in Africa. The mine covers a concession are

    Oct 1, 2001

  • CIM
    Cavity Monitoring System and Stope Analysis

    By John D. Lupton

    This paper will discuss the benefits and advantages of using 3D survey data in stope analysis. Obtaining detailed 3D survey data of underground mine progress and production is a challenge. It is almos

    Apr 1, 2005

  • CIM
    Contrasting Kimberlites and Lamproites

    By Barbara H. Scott Smith

    "During the last two decades lamproites have joined kimberlites as the only two known primary sources of economic quantities of diamonds. This paper contrasts the petrography, primary and xenocrystic

    Jan 1, 1992

  • CIM
    Iron Ore Company of Canada ZV Concentrator: Flowsheet Description and Process Development

    By G. Gagnon

    "HistoryMining of the Schefferville iron deposits began in 1954 on completion of the 357 mile railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment o

    Jan 1, 1981

  • CIM
    The Impact of Coastal and Marine Mines on Seabed Biological Resources: Engineering Needs for Sustainable Recovery and for Use of the Resources after Mining Ceases.

    By Derek V. Ellis

    Coastal and marine mines affect the seabed?s biological resources, eg fisheries, when large volume wastes such as tailings are placed on the seabed, and by the extraction processes from marine mining.

    May 1, 2002

  • CIM
    Mining Workplace Culture and the Careers of Highly Qualified Women

    At 14%, the representation of women working in the mining industry is the lowest among primary industry categories in Canada1. With reference to mining operations and senior leadership, the gap in the

    Aug 1, 2013

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • CIM
    Managing metal price risks

    By Keith C. Hendrick

    "Metal prices are frequently the most critical and least predictable element in determining the profitability of mining operations. Short -term fluctuations can be offset in varying degrees by hedging

    Jan 1, 1983

  • CIM
    Co-products and by-products of base metal mining in Canada: facts and implications

    By L. S. Jen

    Canadian copper, nickel, zinc, lead and molybdenum mines are characterized by the mining of ores from which more than one metal is recovered. During the 1980s, approximately 15% of the gold, 25% of th

    Jan 1, 1992

  • CIM
    Simulation as a Tool to Enable World’s Best Mill Relining Practice (aafeded2-af45-4edf-b535-58771fc04187)

    By Peter Rubie

    "For many years, optimising the relining of hard rock grinding mills has been complicated by:?? the large number of variables;?? the low frequency of relines (slow feedback loop);?? the potential econ

    Jan 1, 2012

  • CIM
    Sampling for Metallurgical Test: How the Test Results can be used to Estimate Their Confidence Level

    "During the development of a mining project, samples are taken for metallurgical tests. The sample can be a composite sample made of material from a selection of various drilling products or a sample

    Jan 1, 2016

  • CIM
    Stratified Sampling of Drill Core

    By Norman O. Lotter

    Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si

    Jan 1, 2010

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • CIM
    Novel Dewatering Aids for Mineral Concentrates and Coal

    By M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu

    "According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus

    Jan 1, 2005

  • CIM
    Multi-Stage Biological Treatment System for Removal of Heavy Metal Contaminants

    By W. D. Gould, F. Goodazi, W. F. A. Duncan, A. G. Mattes

    A biological treatment system designed to passively remove high concentrations of metals from leachate collected from a landfill near a large integrated zinc lead smelter has been in operation intermi

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004