Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Process Hazard Analysis - Foundation for Managing Operational RisksBy Palaniappan Chidambaram
Despite the advances in processing technologies, construction techniques, inspection methods, and materials, the number of process safety incidents are still increasing, and often the same types of in
Jan 1, 2014
-
Risk Assessment of Confined Space Using Fuzzy Set Theory at Mine Reclamation SitesBy L. Mohammadi
Outline ?Background on the accident at the Sullivan Mine No.1 Waste Dump ?Holistic approach to understand the reason for accidents (Atmospheric) ?Specific hazards at reclamation sites ?Regular atm
May 1, 2010
-
Aspects of Sustainability Following Closure of the Steep Rock Iron Mines, OntarioBy Victor A. Sowa
"Abstract - In 1938, a body of goethite and hematite was discovered beneath Steep Rock Lake near Atikokan, northwestern Ontario. This was at the time the largest and richest undeveloped iron ore body
Jan 1, 2003
-
Deriner Hydropower Scheme ? Geotechnical Issues and the Particular Case of the Spillway Tunnels Design and ConstructionBy C. Cekerevac
The paper addresses some geotechnical issues related to the construction of the Deriner dam and HEPP. Design considerations and rock stabilization measures are presented for the excavations which took
May 1, 2009
-
Processing of High-Nickel Slimes at the CCR RefineryBy M. Doucet
The introduction of high-nickel anodes to CCR in 2006 resulted in an increase of nickel in anodic slimes. Removal of the nickel in these slimes to below 3.0% is necessary in order to prevent slag visc
Jan 1, 2007
-
Development and evaluation of proton conducting materials for PEMFCBy T. Navessin
Recent research activities in proton exchange membrane fuel cell (PEMFC) have significantly improved the performance per unit cost and its lifetime. These activities narrow the technology gaps, and th
Jan 1, 2005
-
The Social Dimension of Sustainable Development and the Mining IndustryBy Lise-Aurore Lapalme
Structure of the Presentation ? sustainable development and its social dimension ? challenges that mining is facing ? responses by industry ? corporate social responsibility ? the role of govern
May 1, 2002
-
A Field Assessment of the SIUC Innovative Spray System for Continuous MinersBy Yoginder P. Chugh
Beginning in 2010, a scientifically-founded water spray system for continuous miners (CMs) has been in development at Southern Illinois University that significantly reduces respirable dust exposure f
Aug 1, 2013
-
Lightweight Automobile Body Structure Comprised of Large Thin-Wall Magnesium CastingsBy S. D. Logan
This presentation describes a lightweight automobile body structure concept developed at DaimlerChrysler to support a high fuel-efficiency vehicle project. This body structure consisted primarily of l
Jan 1, 2006
-
Review of the Flotation Circuit at the Laronde ConcentratorBy J. Robitaille, P. Cousin
"Agnico-Eagle Mines Ltd, Laronde Division, is a gold operation processing ore containing copper and zinc. Copper is recovered as a concentrate prior to gold cyanidation.Copper concentrate grade was im
Jan 1, 1995
-
Interactive computer modelling of conveyor systemsBy A. W. Chan
"An interactive computer simulation model of conveyor systems used in oil sands mining has been developed to aid in the selection of mining equipment and the evaluation of operating policies. The mate
Jan 1, 1982
-
Principles of Using Microdiamonds for Resource Estimation: 1—The Impact of Mantle and Kimberlite ProcessesBy J. J. Ferreira, M. L. Thurston, I. L. Chinn, D. M. Rose
"Concerns about using microdiamonds for resource estimation have been raised by workers because multiple diamond populations exist in many parts of the mantle source region, small diamonds in kimberli
Jan 1, 2016
-
Niobium and Tantalum Chemistry: A Brief Overview and Recent HighlightsBy Sarah Belair, Gauthier Deblonde, Valerie Weigel, Alexandre Chagnes, Gerard Cote
"Niobium and tantalum are strategic metals for electronic and alloys industries. They are produced by pyrometallurgy and hydrometallurgy but most of the niobium and tantalum production processes are n
Jan 1, 2016
-
A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution CircuitBy J. A. Drozdiak, A. Bamber
In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or
Jan 1, 2012
-
Niobec Division"In 1989, improved milling and recoveries resulted in a record production of 7 722 200 Ib Nb2P5 at the Niobec Mine. At the beginning of 1990, proven and probable reserves stood at 11 952 000 tons grad
Jan 1, 1990
-
Microstructure and Mechanical Properties of Twin-Roll Cast Al-Mg Based AlloysBy C. Y. Lim, H. W. Kim, M. S. Kim, J. H. Cho, Y. S. Lee
Al - 5.5 wt% Mg - 0.3 wt% Cu alloy strip was successfully fabricated by horizontal-type twinroll casting (TRC). For producing sound strips with no surface defect, the casting was conducted at various
Jan 1, 2014
-
Plant Ramp-Up Profiles an Update with Emphasis on Process DevelopmentBy Terry McNulty
"Previous papers (McNulty 1998 and 2004) have dealt with the causes of successful and less successful achievement of design production rate by new processing plants in the minerals industry. Examinati
Jan 1, 2014
-
Gestion des Travaux de SidbecBy Louis Tellier
SIDBEC commenced detailed planning of major capital expenditures to install integrated steelmaking facilities in 1969. Today, less than IO years later, SIDBEC and its subsidiaries have completed major
Jan 1, 1979
-
Investigation of Hydraulic Fracture Growth through Weak Discontinuities with Active Ultrasound MonitoringBy R. Prioul, J. Kear, D. Chuprakov, A. P. Bunger
"Hydraulic fracture (HF) growth through naturally fractured rocks challenges the development of accurate predictive HF models. The authors present laboratory experiments differentiating behaviours ass
Jan 1, 2016
-
Shrinkage Stoping at the Mouska Mine Symposium of Vein DepositsBy Robert Marchand
_ North-western Quebec _ Bousquet mining district _ 21 M oz mining camp _ 100,000 t/yr (400 t/d) _ Shrinkage : 52 % _ Longhole : 40% _ Development : 8% _ 5 days/week _ 120 employees _Discover
Oct 1, 2001