Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Grinding Media

    By H. M. Howard

    "The subject of Grinding Media is perhaps still quite controversial. Many people will state today that the spherical ball is the only way, and also will state that this was settled long ago others are

    Jan 1, 1970

  • CIM
    Long-Term Performance of Dry Cover Systems for Reactive Mine Waste

    By David Christensen

    The long-term performance of dry covers is being examined in a research study funded by the International Network for Acid Prevention (INAP). The study was separated into two phases. The two main comp

    Nov 1, 2002

  • CIM
    The Oxygen Meter at MacLeod Cockshutt Gold Mines Ltd.

    By W. A. Grell

    "The oxygen meter has been in use at MacLeod Cockshutt Gold Mines for over a year, At MacLeod about 200 tons per day of reground concentrate containing roughly 10% pyrrhotite and 20% pyrite is cyanide

    Jan 1, 1964

  • CIM
    Oxidic Systems: A Combined Modelling and Experimental Approach

    By N. Moelans, I. Bellemans, K. Verbeken

    In this work, we present a phase field model to simulate the facetted crystallization of Fe3O4 in a quaternary FeO-Fe2O3-Cu2O-SiO2 melt under different partial pressures of oxygen. An important focus

    Jan 1, 2019

  • CIM
    Gold mineralization of the sulphidepreview lakes area, la ronge belt

    By Robert S. G. Chapman, Kieran M. J. Downes

    The Sulphide-Preview Lakes area is located 45 km northeast of La Ronge in northern Saskatchewan. It lies within the southern portion of the Proterozoic La Ronge Volcanic-Sedimentary Belt. Two styles o

    Jan 1, 1986

  • CIM
    Electrorefining High Level Arsenic Cast Anode

    By . A. C. Atenas

    Control of arsenic in the Potrerillos' Refinery electrolyte has been obtained by withdrawing a bleed stream of circulating electrolyte and ensuring the ratio of [O]/[As] in the cast anodes is mai

    Jan 1, 2007

  • CIM
    Cerro Verde Concentrator – Four Years Operating HPGRs

    By S. Koski, J. Vanderbeek, J. Enriquez

    "The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper a

    Jan 1, 2012

  • CIM
    The Effect of Stope Inclination and Wall Rock Roughness on Backfill Free Face Stability

    By A. P. E. Dirige

    In order to maximize the recovery of ore in variably dipping ore zones of moderate width, cemented backfill is normally placed to serve as structural support. With the intention of saving on costs, ba

    May 1, 2009

  • CIM
    How accurate are non-destructive-testing based estimates of mine shaft rope breaking-strength losses? — an update

    By J. E. Udd, L. B. Geller

    "Mine-shaft wire-rope discard regulations include, among other criteria, a limited amount of permissible loss-of-breaking-strength (LBS). Currently, this parameter is estimated on the basis of non-des

    Jan 1, 1990

  • CIM
    Heli-portable Resonant Drilling Environmentally Friendly 100 % Core Recovery Overburden Drilling

    By Matthew Janes

    Advantages: Clean samples Low sample disturbance Very low spoil Versatile Fast Penetrates all formations Resonant Drill 100 or 150 kW Self tuning to resonance Rotation to 100 rpm

    May 1, 2013

  • CIM
    Production of nano-Structured 5083 Aluminum Alloy by ARB Process and Evaluation Microstructure and Mechanical Properties

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    A Novel Biomineralization Process for Continuous, Selective Recovery of Rare Earth Elements

    By R. E. Baylis, M. R. Tolley, S. Singh, A. J. Murray, R. Boden, L. E. Macaskie, T. P. Hathway, D. Vavlekas

    We report rare earth element (REE) recovery using immobilized Serratia biofilm depositing metal phosphate via a robust enzymatic mechanism. Activity was approximately halved at pH 3.5 and restored at

    Jan 1, 2014

  • CIM
    Novel materials for aluminium electrolysis cells

    By W. M. Silva, Bittencourt. L. R. M.

    Three newly developed alumino-silicate refractory bricks for use in safety lining of aluminum electrolysis cells were compared to one commonly used bricks for the same application. It was shown that t

    Jan 1, 2004

  • CIM
    Successful loss control

    By B. R. Casement

    "Managing safety on the basis of after-the-fact reaction to accidents, can never be more than partially successful. Injuries will occur as long as the underlying potential for them still exists. Unles

    Jan 1, 1993

  • CIM
    Spray Drying

    By D. Brossman

    "The virtue of spray drying is that it is a drying method, and so far the only one by which it is possible in one operation to divide a mineral concentrate into its basic primary particles.,In so doin

    Jan 1, 1972

  • CIM
    Evaluation of the Fe3+ / Fe2+ redox fuel cell cathode couple

    By F. Moraw

    The use of redox fuel cells in which oxygen is replaced by other oxidants such as ferric ions can have significant advantages [1-3]. For example, the cathodic reaction rate (e.g., exchange current d

    Jan 1, 2005

  • CIM
    Effect of Particle Morphology on Coagulation of Silica

    By Behzad Vaziri Hassas, Firat Karakas, Esra Tanisali, Mehmet S. Çelik, Ahmad Hassanzadeh

    Coagulation is basically an aggregation process where particles settle under the influence of interfacial forces with electrostatic forces playing a governing role. Although particle morphology consis

    Jan 1, 2016

  • CIM
    Kinross Paracatu, Start-Up and Optimization of SAG Circuit (7832025f-e075-4ccb-ad3a-7f076b2a98ce)

    By Jr. Santos, T. V. Pignaton, R. B. Gomides, W. Phillips, M. P. D. Gomes

    Kinross Paracatu started the operation of the new gold processing plant in the end of 2008, being composed by one SAG mill and two ball mills. During the first year of operation the plant had several

    Jan 1, 2012

  • CIM
    Pastefill Operation at Xstrata Copper - Kidd Mine

    By Maureen A. McGuinness

    Kidd Mine, an Xstrata Copper operation in Timmins, Ontario, operates a 400 t/h pastefill plant that provides paste backfill to stopes at the depth of 9000 ft. This paper will cover the operating pract

    Feb 1, 2008

  • CIM
    Process Integration and Optimisation of the Boddington HPGR Circuit (5a005d54-696d-4671-abf8-b2ab149915bf)

    By S. Tavani, T. Rees

    The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova

    Jan 1, 2012