Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effects of applied stress on the oxidation kinetics of y-TiAl

    By G. C. Weatherly, D. S. Wilkinson, A. M. Limarga

    In addition to the harsh environment, materials for high-temperature applications are often subjected to a significant mechanical loading. Several researchers have noted that the rate of oxidation can

    Jan 1, 2004

  • CIM
    Anode Casting - Chemical Anode Quality

    By Ch. Wenzl

    Anodes must have a certain physical and chemical quality in order to provide uniform anodic corrosion and meet the requirements of electrorefining, i.e. to achieve a high current efficiency, low energ

    Jan 1, 2007

  • CIM
    Development of a Risk Assessement Model for Underground Openings

    By M. Moghadami

    Design and construction of underground openings are associated with many uncertainties with regard to input data. In the construction process of underground openings various levels of risks exist and

    Aug 1, 2013

  • CIM
    Riviera Tungsten - A Discovery Case History (5337e412-7cba-44c8-aee6-e1729c806564)

    By P. W. A. Walker

    "The Riviera tungsten occurrence in the Cape Province of South Africa was discovered in October 1979 as a result of stream-sediment panned concentrate sampling. The Cape age granite and late Precambri

    Jan 1, 1994

  • CIM
    Optimisation of the Prominent Hill SAG Mill (bf73cc6e-b0d3-47b9-89d5-5e692f076fff)

    By Brett Triffett, Mark Weidenbach, Christopher Treloar

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • CIM
    Interaction between copper mattes and refractories

    By G. Plascencia, A. Warczok, M. Zamalloa, T. Utigard, N. Behnood

    The objective of this investigation was to investigate interactions between high-grade copper mattes and Rexal 60DB direct bonded basic bricks. The infiltration and attack of Rexal 60DB bricks by copp

    Jan 1, 2004

  • CIM
    Risk Management and Project Evaluation

    What Discounted Cash Flow Analysis can do for you: ?Provide an accurate financial analysis of a project for the first 25 to 30 years of operations ?Identify cash flow requirements ?Identify relativ

    May 1, 2010

  • CIM
    Highland Valley Copper Control Systems Upgrade ? Case Study

    By Kevin S. Borthwick

    The subject of this paper is a facility wide Distributed Control System (DCS) upgrade being completed at a large copper and molybdenum mine. This paper will discuss the innovative hardware and softwar

    May 1, 2008

  • CIM
    Size and Support Effects of Gold Model Catalysts

    By Shamil Shaikhutdinov

    CO adsorption on gold particles deposited on well-ordered alumina and various iron oxide films has been studied with temperature programmed desorption (TPD) and infrared reflection adsorption spectros

    Oct 1, 2003

  • CIM
    Effect of particle size on the low cycle fatigue life of discontinuously reinforced MMCs

    By D. L. Chen, Q. Zhang

    The effect of particle sizes on the low cycle fatigue (LCF) life of discontinuously reinforced metal matrix composites (DR-MMCs) has been widely studied. However, how the particle size affects the LCF

    Jan 1, 2004

  • CIM
    Influence of additives on microstructural changes of nitride bonded SiC refractories

    By F. Golestani-Fard, A. A. Nourbakhsh

    In this paper microstructural development of nitride-Bonded SIC refractories is reported in presence of Al203, Mg() and Urea additives .The samples were prepared by mixing, shaping and firing at 1400-

    Jan 1, 2004

  • CIM
    The Molopo Farms Complex, Botswana: History, Stratigraphy, Petrography, Petrochemistry and Ni-Cu-PGE Mineralization (7cbfd5e2-2a0e-4041-96d5-f3f5caa4ab01)

    By EJ. Reichhardf

    The Molopo Farms Complex is a major, layered ultramafic/mafic, early Proterowic intrusion which is totally covered by sediments of the Karoo and Kalahari Fonnations and situated in southern Botswana a

    Jan 1, 1994

  • CIM
    The Labrador Central Mineral Belt IOCG Province -A Uranium-rich end member of the IOCGU Class

    By Rick Valenta

    Is the Labrador Central Mineral Belt part of the IOCGU Club? ?I sent the club a wire stating, PLEASE ACCEPT MY RESIGNATION. I DON'T WANT TO BELONG TO ANY CLUB THAT WILL ACCEPT ME AS A MEMBER.?

    May 1, 2006

  • CIM
    Effect of dispersants on rheological behavior of bauxite-based low-cement castables

    By M. Rigaud, N. Zhou, K. Sankaranarayanane, X. Zhou

    The effect of amount and type of dispersants on the rheological behaviour of bauxite-based low-cement castables has been studied in detail. The rheological properties: flow resistance and torque visco

    Jan 1, 2004

  • CIM
    Mining Ore Valuation by Real Option Under Uncertainty and Risk

    By M. D. Viera

    The purpose of the study is to show, through real cases of companies in Chile, the different problems concerning valuing or economically appraising a mining ore resource with the traditional technique

    Jan 1, 2007

  • CIM
    Geology of the NICO Au-Co-Bi Deposit & Sue-Dianne Cu-Ag Deposit, Southern Great Bear Magmatic Zone, Northwest Territories, Canada

    By Robin E. Goad

    ?Located 160 Km northwest of Yellowknife, NWT, Canada Current winter road access ?New all-weather road planned ?Power within 22 km ?Hwy to Edmonton 80 km south Close to existing infrastructure

    May 1, 2006

  • CIM
    Superplasticity and its application of ultra-fine-grained titanium alloys obtained through protium treatment

    By Kousuke Takahata, Hirofumi Yoshimura, Jun Nakahigashi

    Studies of a protium treatment for grain refinement of a + ß type titanium alloy are reviewed and recent experimental results are introduced. Protium treatment consists of the following three processe

    Jan 1, 2004

  • CIM
    Kinetic Transformation of Nanofilamentary Au Metal-Metal Composites

    By K. Wongpreedee

    Recovery and recrystallization of Au wire can degrade strength and alter conductivity properties during exposure to elevated temperature. Au Deformation Processed Metal Metal Composites (Au DMMC'

    Oct 1, 2003

  • CIM
    Selecting Effective Hydrogen Production and Delivery Optionis for Mining Applications

    By Kimberly M. Curran

    The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i

    May 1, 2007

  • CIM
    Creating Long-Range Strategic Scheduling Solutions for the Fort Hills Energy Oil Sands Project

    By Rebecca L. Jones

    The paper addresses the application of XPAC AutoScheduler at the Fort Hills Energy Oil Sands Project to complete fast turn around ?what if? scenario testing of different mine schedules. Traditional

    May 1, 2008