Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mine Closure ?The Perspective of Engineering Firms

    By Peter Lighthall

    What is an engineering firm?s role? ? The ideal situation is a life of mine service alliance with the owner ? Engineering firms are long term custodians of information ? Maintain consistency with e

    May 1, 2006

  • CIM
    Single Stage SAG/AG Milling Design (8f4dab33-2960-4942-b1dc-b2668e0eb796)

    By Brian Putland, Fred Kock, Leigh Siddall

    Single stage semi-autogenous / autogenous (S/AG) milling has become a common design for a variety of ore types with the advantages of being comparatively low capital cost and flexible for future expan

    Jan 1, 2012

  • CIM
    Size and Support Effects of Gold Model Catalysts

    By Shamil Shaikhutdinov

    CO adsorption on gold particles deposited on well-ordered alumina and various iron oxide films has been studied with temperature programmed desorption (TPD) and infrared reflection adsorption spectros

    Oct 1, 2003

  • CIM
    How accurate are non-destructive-testing based estimates of mine shaft rope breaking-strength losses? — an update

    By J. E. Udd, L. B. Geller

    "Mine-shaft wire-rope discard regulations include, among other criteria, a limited amount of permissible loss-of-breaking-strength (LBS). Currently, this parameter is estimated on the basis of non-des

    Jan 1, 1990

  • CIM
    Innovative CRF batch plant design at the Leeville Mine, Nevada

    By A. E. Reschke

    Optimized mine planning of the Leeville Gold Mine, Nevada, necessitated the requirement for an average of 2540 tpd of high quality cemented rockfill (CRF) in primary stoping blocks and underhand cut a

    May 1, 2007

  • CIM
    New and Innovcative Rare Earth Technology for Low-Level Phosphorous Removal

    By Joseph Carlston

    With environmental regulations continuing to restrict the discharge of phosphorus from wastewater treatment facilities, traditional methods of phosphorus removal are proving inadequate. To achieve the

    Jan 1, 2014

  • CIM
    A Collaborative Initiative of the Surface Mining Association for Research & Technology (SMART)

    By Paul Graham

    Presentation Focus ? What is LTUG / What do we do? ? History of LTUG ? Examples of Benefits from LTUG Participation ? Encourage Participation What is LTUG? ? An informal gathering of surface min

    May 1, 2008

  • CIM
    Laminated Displacement Discontinuity Analyses for Estimating Stresses, Strain, Convergence and Subsidence During the Recovery of Safety Pillar at Soma Coal Field- Western TURKEY

    By C. Okay Aksoy

    In Turkey, the increasing demand for lignite has necessitated an increased emphasis on both lignite production and recovery. This emphasis has resulted in a gradual increase in the application of the

    May 1, 2004

  • CIM
    Selection and Commissioning of ABC Grinding Circuit for Nkomati Nickel Mine (08cc03e7-68ed-4768-97f1-ea278e93afda)

    By P. J. Morgan, E. Wolmarans

    The selection of the main mineralised zone (MMZ) concentrator milling circuit has followed a comprehensive route over the preceding 10 years. Many knowledgeable parties have contributed and assisted i

    Jan 1, 2012

  • CIM
    Bacterial Leacidng of a Copper Sulphide Ore Containing Activated Pyrite

    By Z. Manafi

    Bioleaching of a copper sulfide ore containing "activated pyrite", using a mixed culture of mesophilic bacteria, was studied. This type of copper ore had been found unsuitable for flotation because it

    Jan 1, 2007

  • CIM
    Fleet Management System for Underground Mines

    By Michel Gamache

    This paper describes a system that manages and assigns vehicles in real-time in an underground mine. Each dispatching decision takes into account the traffic on the road segments of the mine network,

    May 1, 2001

  • CIM
    Long-Term Planning at Raglan

    By Lee W. T. Weitzel

    This paper reviews the Falconbridge- SMRQ?s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    May 1, 2002

  • CIM
    Influence of Sample Geometry (Scale Effects) on Mine Backfill Properties

    By Kristie D. Tarr

    Ideally, in situ monitoring would supply the input data for numerical modeling of backfill material property requirements. However, clue to production requirements and costs of conducting field tests,

    May 1, 2008

  • CIM
    Liven up your talent Acquisition Strategies with Social Media

    Situation Brands & Employment Value Propositions of mining sector firms are perceived negatively Competitive labour market is generally not aware of the diversity of mining careers Jobs requiring

    May 1, 2009

  • CIM
    Use of Local Average Subdivision to Characterize Marine Mineral Reserves —A conceptual framework

    By G. A. Fenton, A. Vervoort, M. Alvarez Grima

    "High-risk underwater mining operations necessitate characterizing spatial heterogeneity and resource uncertainty. Local average subdivision is a method of simulating spatial deposit variability insid

    Jan 1, 2015

  • CIM
    Forward and reverse numerical modeling of the nanoindentation of coatings

    By W. Beres, Li. J.

    The finite element method (FEM) has been applied to investigate the stress fields and deformation of a TiN/Ti-6A1-4V coating/substrate system subjected to nanoindentation. MSC Patran and MSC Marc were

    Jan 1, 2004

  • CIM
    Extending the Life of Brunswick Mine - An Integrated Approach to the Evaluation of the Mining Remnants: Many Opportunities, Many Challenges

    By Pierre Bernard

    Contents of the presentation ? Overview of Brunswick 12 Mine ? Brief description of the mine geology ? Summary of the current Mineral Reserves and Additional Mineral Resources ? Review of the ongo

    Apr 1, 2005

  • CIM
    Automated Fuel Inspection

    By J. Vanderlaan

    A proposed method of applying high-speed, non-destructive part scanning technologies to the production process of UO2 (Uranium Dioxide) fuel pellets is presented. The scanning process examines each pe

    Aug 1, 2010

  • CIM
    Gold-Catalysed Syngas Conversion: Pathways and Size Effects

    By Noko S. Phala

    The energetics of CO and CO2 hydrogenation to methanol were studied on a gold surface via periodic and cluster DFT calculations. CO hydrogenation appears to be much easier than CO2 hydrogenation on an

    Oct 1, 2003

  • CIM
    Contribution of the Mining Industry: A Positive Message to Canadians

    By Paul Stothart

    Context ? Industry is active in urban, rural, and remote regions ? Faces a range of environmental challenges and ?social license? issues ? There are also Aboriginal and northern issues ? Also very

    May 1, 2008