Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Small Diameter Fuse

    By A. Michalkow

    DELN ITE Mines Limited is located in Deloro township, on the west end of the south break of the Porcupine Camp. Mining operations are currently being carried out on the downward extension of a system

    Jan 1, 1962

  • CIM
    Sixth Commonwealth Mining and Metallurgical Congress

    By J. C. Mitcheson

    Mr. President, Mr. Mayor, Ladies & Gentlemen: IT GIVES ME great pleasure to have the opportunity, today, to speak on behalf of all the constituent. bodies of the Common-wealth Council of Mining and

    Jan 1, 1957

  • CIM
    Continuous Casting of Magnesium Alloy Sheet Using Semisoid Slurry Produced by an Inclined Cooling Plate

    By T. Motegi

    Semisolid casting provides grain refinement of the cast structure and prevents macro-segregation. The conventional semisolid slurry is obtained by electromagnetic or mechanical stirring. In our proces

    Jan 1, 2007

  • CIM
    Notes on Mining by the "V" System in West Virginia

    By J. C. Nicholson

    The "V" system was first introduced by the West Virginia Coal & Coke Company at their No. 9 mine, Norton. Norton is a small mining village on the B. & 0. railway, about seven miles from the town of El

    Jan 1, 1924

  • CIM
    Multiscale Modeling of Nanoindentation: Significance of Local Temperature

    By W. Beres, R. E. Miller, B. Shiari, L. R. Zhao

    A dynamic multiscale (MD/FE) method has been used to study dislocation generation and plastic deformation during a nanoindentation process which is physically associated with the generation of heat wi

    Jan 1, 2006

  • CIM
    Using Lca To Support Decision-Making And Sustainable Plant Design In Primary Copper Production

    By M. H. Ali

    Codelco, a multi-process primary copper producer, is undertaking a full life cycle inventory (LCI) of all its commercial products based on copper and molybdenum. During this work, many questions have

    Jan 1, 2007

  • CIM
    The Noranda Change House

    By J. R. Bradfield

    THOSE familiar with the development of the Horne mine can readily appreciate that more and more accommodation bas been required for underground labour as the mine has grown. A permanent fire-proof ch

    Jan 1, 1935

  • CIM
    Tire Maintenance at Scully Mine, Wabush

    By R. B. Anderson, N. J. Sherren

    The mining equipment at the Scully Mine, Wabush, consists of approximately twenty-five large haulage units, eight large dozer-loader applications and seventy other related pieces of service and mainte

    Jan 1, 1969

  • CIM
    Subsurface Tiltmeter Observations of Solid Earth Tides and Rock Excavation in Northeastern Illinois

    By C. E. Lancelle, J. T. Volk, H. F. Wang, D. Fratta

    "The Main Injector Neutrino Oscillation Search (MINOS) Near Detector Hall at Fermilab and the Lafarge – Conco Mine are located approximately 100 meters underground in the Galena-Platteville dolomite j

    Jan 1, 2015

  • CIM
    Benefits of Pillar Destressing in Narrow Vein Mining

    By Hani S. Mitri

    Overhand cut-and-fill mining of narrow vein orebodies inevitably leads to the creation of horizontal pillars. As the thickness of the overlying crown pillar diminishes, stresses build up in the pillar

    Oct 1, 2001

  • CIM
    Northern Ecosystems and Northern Development

    By R. W. Wein, L C. Bliss

    Northern ecosystems are dominated by a harsh physical environment which dictates a need for biological adaptation. As yet, it is unknown just how these adapted plants and animals will tolerate industr

    Jan 1, 1971

  • CIM
    Mineral Resources and Their Relation to the Development of the Empire

    By N. Thompson

    The Right Hon. Viscount Long, late Secretary of State for the Colonies, in his inaugural address to the Empire Mining and Metallurgical Congress in London last June said: "I am more and more? convince

    Jan 1, 1925

  • CIM
    Design Guidelines for Permanent Tunnel Plugs

    By Brennan Lang

    Why Seal Tunnels? ?Restore groundwater levels to pre-mining conditions. ?Saturate rock mass to reduce acid rock drainage. ?Reduce discharge flow to the environment. ?Reduce or regulate flows to a

    May 1, 2002

  • CIM
    The Ecstall Story: The Administration Department

    By Albert W. Scragg

    "THE ADMINISTRATION DEPARTMENT consists of six sections, all with their own supervisors, reporting to the superintendent of administration. Although each of these sections is uniquely separate, they a

    Jan 1, 1974

  • CIM
    Cement and Rock-Wool Materials

    By Donald F. MacDonald

    THE cement plant nearest to Nova Scotia is not far from Montreal. Cement is a heavy product which, because of its relatively low value, cannot stand a high freight charge without unduly enhancing its

    Jan 1, 1939

  • CIM
    Reclamation of the Lower Williams Lake tailings area of Denison Mines Limited

    By D. Murray

    A 2-hectare uranium tailings area has been reclaimed. The exposed tailings of 1.4 hectares were capped with glacial till and vegetated with grasses and legumes. The water running through the tailings

    Jan 1, 1979

  • CIM
    Operational Aspects of the Granisle Pit

    By R. R. Montigny

    A brief description is given of the history, location and geology of the Granisle Copper Limited operation on Copper I land in Babine Lake. Detailed information is given with regard to pit design, pla

    Jan 1, 1971

  • CIM
    Optimization of Process Variables During TLP Bonding of Nickel Superalloys

    By M. Medraj, M. A. Arafin, D. P. Turner, P. Bocher

    In this study, the kinetics of isothermal solidification during TLP bonding of Inconel 625 and 718 superalloys with nickel based multi-component filler alloy BNi-2 have been studied through a combinat

    Jan 1, 2006

  • CIM
    New Environmentally Friendly Corrosion Inhibitor as Replacement for Chromate

    By M. Reda

    Because of the adverse environmental effect of Chromate, Molybdate ions had been investigated as replacement for Chromate and the results had shown not to be encouraging. Film deposited from peroxopol

    Jan 1, 2010

  • CIM
    Milling Methods and Costs at Eustis Concentrator of the Consolidated Copper and Sulphur Company

    By H. A. Baxter

    THE Eustis concentrator is located about nine miles southwest of Sherbrooke, on the main line of the Quebec Central railway. The concentrator is served by a side track parallel to the main line, and a

    Jan 1, 1936