Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Transforming the Effectiveness of the HPGR Circuit at Anglo Platinum MogalakwenaThe Anglo Platinum Mogalakwena North concentrator was one of the first three hard rock mineral processing applications to utilise a HPGR circuit in preference to a SAG milling circuit. This was driven
Jan 1, 2012
-
Stamp-Milling and Amalgamation Practice at Goldenville, N.S.By E. H. Henderson
Introduction Stamp-Milling and amalgamation is, perhaps, one of the oldest processes of recovering gold from its ores. Many papers, theses, and textbooks have been written on the subject of stamp-mil
Jan 1, 1935
-
Cluff Lake Mill - Phase 2 ExpansionBy H. A. Schnell
"The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m
Jan 1, 1985
-
Operations at Canadian Copper Refiners LimitedBy G. Bridgstock, S. S. Forbes, E. M. Elkin
"OPERATIONS at Canadian Cop-per Refiners Limited, since the refinery was established in 1931, have been described in previous papers ( 1,2). Since then the refinery has treated the entire copper outpu
Jan 1, 1960
-
Bumps in No. 2 Mine, Springhill, Nova Scotia (6b22a26e-d82e-4ce9-8c21-9da88f205566)By Walter Herd
For the past eight years, No. 2 mine of the Cumberland Railway & Coal Co., Springhill-a subsidiary of the Dominion Coal Co., Ltd.-has had an unenviable reputation for bumps. As the workings extended i
Jan 1, 1929
-
Inorganic Chemistry of the Platinum-Group Elements"2.1. General Considerations and Properties2.1.1. IntroductionOur present knowledge of the platinum-group elements (POE) is extensive, the reason being two-fold. The elements have many uses and, moreo
Jan 1, 1979
-
Technology and Operational Improvements in Tuyere Punching, Silencing, Pyrometry and Refractory Drilling EquipmentBy M. J. Marinigh
Increased safety requirements, higher operational costs, greater environmental restrictions, and new competitive processing techniques are the challenges smelter operators must confront in order to re
Jan 1, 2007
-
Noranda Process Reactor at Xstrata Copper- Impact of Minor Slag Components (CaO, Al2O3, MgO, ZnO) on the Optimum %Fe/SiO2 in Slag and Operating TemperatureBy P. Coursol
The Noranda Reactor Process (NRP) has been in operation now for more than 30 years and this mature process has attained a high level of performance. The NRP at the Home Smelter of Xstrata Copper treat
Jan 1, 2007
-
Surface damage and phase fragmentation in Al-Si alloys during single pass scratch testsThe fracture behavior of second phase particles and the role of matrix material on the wear resistances of the three Al-Si alloys containing 8, 17, and 19% Si were investigated using single pass scrat
Jan 1, 2005
-
Application of CEET at Barrick's Goldstrike OperationBy Steve Custer, Chris Bennett, Patrick Garretson, Glenn Dobby, Jacques McMullen
"Barrick Gold is in the process of expanding one of its grinding circuits at the Goldstrike property as a response to both increasing ore hardness and increased ore sensitivity to finer grinding as it
Jan 1, 2001
-
The Implications of Planning and Scheduling by CPMBy Jack G. Hazan
The Critical Path Method is the modern scientific answer for solving the planning and scheduling problems inherent in today's complex projects. With this method, nothing is left to chance. All re
Jan 1, 1965
-
Model of a DecisionA mathematical model of a decision is represented by the table in Figure 4. The numbers in the matrix are a measure of the effectiveness of each alternate for an objective. In this case, it is the per
Jan 1, 1964
-
The Resource Valuation and Optimesation Model: Real Options Impact for the Mining IndustryBy G. W. Evatt
This paper presents the scientific framework underpinning the Resource Valuation and Optimisation Model (RVOM). The RVOM is a Real Options software package, which helps mine owners optimally plan thei
Jan 1, 2011
-
Achieving Stakeholder Support for New Gold Mining Developments that Contain Sulfide MineralsBy T. D. Chatwin
While new jobs and taxes are major incentives for support of mining, stakeholders must also be assured that current jobs, resources and environment will be protected. Mining companies can help achieve
Jan 1, 2011
-
Heavy media separation circuitsBy Mark Freberg
"IntroductionThis chapter is intended to provide information on the operation and maintenance of several pieces of equipment used in heavy media separation. Most heavy media separation circuits, parti
Jan 1, 1989
-
Mining Pitching Seams under Dangerous Roof ConditionsBy J. B. De Hart
This paper has been confined to the consideration of the working of thick seams, from six feet to sixteen feet, which are pitching at about thirty degrees to the horizontal. The discussion has been li
Jan 1, 1930
-
Falconbridge Mine-No. 9 Internal Shaft and FacilitiesBy V I. McCallum
In 1954, Falconbridge Nickel Mines Limited began the program of deepening the Falconbridge mine workings for 2,000 feet below the bottom, or 4025, level in order to provide twelve new levels for produ
Jan 1, 1964
-
Estimation of the Average Value of Gold OreBy W. A. Jones
THE estimation of the average value of gold ore involves many considerations, among them the correct sampling of the deposit, the dilution by waste, and the loss of high-grade fines. It is a common ex
Jan 1, 1943
-
An Overview of Biological Treatment Concepts for Nickel and Cobalt Recovery, and SO, RemovalBy J. L. Huisman, G. Schouten
After pyrometallurgy and hydrometallurgy, bio(hydro)metallurgy is the latest development in the ongoing search for efficient and economic metal winning processes. In addition to bioleaching, other bio
Jan 1, 2005
-
Twenty Five Years of Sonic Injection Plant Trials and Implementation — Let’s Take StockBy Joël P. T. Kapusta
Back in 1995, Air Liquide and Union Minière presented a joint paper at the Copper 95 – Cobre 95 Conference in Santiago, Chile, describing the first full scale plant trials of shrouded sonic injection
Jan 1, 2019