Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Continuous loading and conveying technology in mining

    By Dale Lens, W. S. (Wayne) Cusitar

    "The use of continuous loading and conveying technology for mining is currently practiced in relatively few mining environments and, even in these cases, on a non-exclusive basis. For the most part, a

    Jan 1, 1987

  • CIM
    Rubber Lining Design for Grinding Mills: Influence on Economy and Capacity

    By Gustav Nillson

    There is a difference in design parameters between steel linings and rubber linings for grinding mills. The basic design parameters for rubber are described and a comparison is made between steel and

    Jan 1, 1979

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • CIM
    All-Hydraulic Bucket-Wheel Excavators (A Synopsis)

    By Walter Durst

    On October 16, 1978, the Harnback open cut of Rheinische Braunkohlenwerke, the largest open cut ever planned, was officially put into operation. It will outperform all of the large open cuts known at

    Jan 1, 1979

  • CIM
    Applications of fracture mechanics in failure analysis case studies

    By M. N. Bassim, W. W. Tennese

    "Concepts of linear elastic fracture mechanics were applied to study two cases of failure, namely an equalizing beam from a tandem rear axle of a highway tractor unit and the main beam of a flat bed t

    Jan 1, 1985

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • CIM
    Low-Grade Geothermal Potential of the Regina - Moose Jaw Area, Saskatchewan

    By L. W. Vigrass

    Porous and permeable rocks deeply buried in sedimentary basins contain immense volumes of hot water with the potential to supply low-grade heat energy. A part of Canada with sizeable potential for low

    Jan 1, 1979

  • CIM
    An Approach to Energy Management at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc., over progressively shorter time peri

    Jan 1, 1979

  • CIM
    Minimum variance or maximum profitability?

    By R. Mohan Srivastava

    "The goal of estimation is considered in the light of decision analysis. A simple example reveals the essential elements of decision-making in the face of uncertainty. A second example shows that thes

    Jan 1, 1987

  • CIM
    A study of problems relating to mining engineering university education

    By C. Pelley, A. Piche

    "The Canadian mining industry faces the prospects of a severe shortage of graduate mining engineers over the next decade. This arises from three factors: first, a growth in industrial activity; second

    Jan 1, 1989

  • CIM
    Systematic and Integrative Ore Characterization of Massive Sulfide Deposits: An Example from Voisey’s Bay Ni-Cu-Co Ovoid Orebody, Labrador, Canada

    By P. J. Sylvester, D. H. C. Wilton, R. I. Wheeler, M. A. E. Huminicki, D. Evans-Lamswood

    "Systematic characterization of the mineralogy of massive sulfide ore deposits can provide valuable insights into ore genesis and metallurgical processing that would not be apparent otherwise. We desc

    Jan 1, 2012

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Dynamic Testing of Friction Rock Stabilisers

    A rough simulated borehole has been developed for the installation and dynamic testing of rock bolts a the WASM Dynamic Test Facility. The rough simulated borehole is used for rock bolts that are sens

    May 1, 2009

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    Production of Paste from Total Tails in a Deep Cone Thickener A Case Study

    By Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary

    "In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo

    Jan 1, 2001

  • CIM
    The Effect of Disposal Configuration on the Environmental Behavior of Paste Tailings

    By Thomas Deschamps

    The main objective of this work was to investigate the effect of binder addition on the geochemical properties of surface paste tailings. Nine leaching columns were prepared following different dispos

    May 1, 2007