Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluating the Effect of Seeding on Zinc Recovery through the Zincor Iron Removal Circuit

    By Jochen Petersen, Diane Taggart

    "At an average of 90.3% (for the period of 1 January 2009 to 30 September 2011), Zincor’s zinc recovery was well below the industry standard of 96%. The losses through the residues, in particular the

    Jan 1, 2016

  • CIM
    Haile Gold Mine Metallurgy and Flowsheet Review

    By P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens

    "Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se

    Jan 1, 2013

  • CIM
    The Application of the Stackcell Technology for Fine Coal Recovery

    By E. S. Yan, R. Graley

    "The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell

    Jan 1, 2013

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    A Mathematical Model for the Prediction of Large Diameter Ball Consumption Rates in Semiautogenous Grinding Applications

    By J. E. Sepulveda, R. Morrow

    "In full scale mineral grinding operations, the steel balls normally utilized as auxiliary grinding media get to be consumed at different specific rates, as determined by 3 basic mechanisms: abrasion/

    Jan 1, 2015

  • CIM
    Development of value-added zeolite products from St. Cloud Mining

    By R. S. Bowman, G. S. Austin, J. M. Barker, P. S. Freeman

    The physical, chemical and mineralogic characteristics of zeolites allow commercially important applications. While adoption of zeolite technology is slow in the United States compared to other region

    Jan 1, 2004

  • CIM
    Numerical Modelling of Rock Fracture with the Embedded Discontinuity Approach Incorporating Heterogeneity

    By T. Saksala

    In this paper, the embedded discontinuity approach is applied to finite element modeling of rock fracture. A rate-dependent constitutive model based on the embedded displacement discontinuity theory i

    Jan 1, 2015

  • CIM
    Study on Recovery Process for Ruthenium from Scraps by Hydrometallurgical Methods

    By Y. Nakamura, T. H. Okabe, S. A. Sunkar, K. Nose

    Ruthenium (Ru) is known as a platinum group element with a very small production volume. In fact, the worldwide annual production of primary Ru metal is only about 20-30 tons, and it depends on the am

    Jan 1, 2014

  • CIM
    The Response of Cemented Backfill to Dynamic Loads from Field Observations and Split Hopkinson Pressure Bar Tests

    By J. C. Johnson

    Underhand mining with cemented mill tailings for backfill has proven to be a safe and effective alternative to conventional overhand mining for rockburst prone mines. The ability of the cemented sand

    May 1, 2007

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • CIM
    Novel High Efficiency Gold Extraction Process Using Nanotechnology

    By Adil Aledresse, Louis Mercier, Laxman Amaratunga

    "The development of high capacity adsorbents with uniform porosity denoted, MP-HMS (Mercaptopropyl – Hexagonal Mesoporous Structure) using nanotechnology, and their ability to extract gold from soluti

    Jan 1, 2008

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Metallogeny of the Canadian Cordillera

    By A. Panteleyev, C. S. Ney, R. J. Cathro, A. Sutherland Brown

    The general distribution of metal deposits in the Canadian Cordillera can be related to its tectonic evolution. The Canadian Cordillera is naturally divisible into five longitudinal tectonic belts wit

    Jan 1, 1971

  • CIM
    Geological Setting, Petrology, and Geochemistry of Granitic Pegmatites and Leucogranites Hosting U-Th-REE Mineralization at Fraser Lakes Zone B, Wollaston Domain, Northern Saskatchewan, Canada

    By Kevin M. Ansdell, Irvine R. Annesley, Christine L. Mckechnie

    The U-Th-REE mineralization at Fraser Lakes Zone B is hosted by granitic pegmatites and leucogranites, which lie along the deformed contact between Paleoproterozoic metasedimentary gneiss of the Wolla

    Jan 1, 2013

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh Mine

    The uphole bench extraction strategy at EKJV Management Pty Ltd?s Raleigh Mine, requires simultaneous horizontal and vertical exposure of paste filled stopes. In order to prevent excessive ore dilutio

    May 1, 2007

  • CIM
    Paste Backfill Bulkhead Monitoring ? A Case Study from Inmet?s Cayeli Mine, Turkey

    The stability of paste fill bulkheads forms an integral part of a successful paste fill system. Bulkheads are constructed at the draw points of open stopes to contain paste fill while the initial pour

    May 1, 2007

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Compañia Fresnillo, S.A. De C.V., Proaño Mine, expansions and improvements during the past twenty years

    By Salvador Gómez, Rodolfo Espinosa, Jaime Bravo, Leopoldo Gallas

    "Compañia Fresnillo, S.A. de C.V. - Proaño Mine, is owned by Industrias Peñoles S.A. de C.V. (Peñoles). The Proaño Mine, is one of the richest silver underground mines in the World, and for this reaso

    Jan 1, 2002