Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, OntarioBy A. C. Wilson
In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu
May 1, 2003
-
High Iron Calcines Treatment in Electrolytic Zinc Plant of Metallurgical Met-Mex Peñoles, S.A De C.VBy Claudio Rocha Rosales
"Peñoles is a mining group with integrated operations in the smelting and refining of non-ferrous metals, and is also a chemicals producer. Peñoles is the world’s foremost producer of refined silver,
Jan 1, 2016
-
Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper SmelterBy L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi
This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel
Jan 1, 2019
-
The Importance of Water Utilization for Maximizing Grinding Circuit Classification System EfficiencyBy Robert E. McIvor
"The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci
Jan 1, 2009
-
Applications for Biogenic Sulphide Reagent for Copper Recovery in Copper and Gold Hydrometallurgical OperationsBy R. W. Lawrence
Sulphide is an effective reagent in the precipitation of base metals for both metal winning and environmental control. BioteQ Environmental Technologies Inc. has successfully demonstrated in industria
Jan 1, 2007
-
Automatic Control at East Malartic Part 2By A. Gillis
"In order to obtain the equipment necessary to automate the equipment it was decided that the Department of Mines and Milltronics would jointly survey the circuit. This survey involved a metallurgical
Jan 1, 1965
-
Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa ProjectBy J. A. Brown, F. P. Kerr, M. A. Archer
Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach
Jan 1, 2020
-
Residual Effects of Lognormality in Concentrator DataBy Norman O. Lotter, André R. Laplante
"The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim
Jan 1, 2005
-
Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and InstallationBy Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt
"In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due
Jan 1, 2013
-
Electrolytic Recovery of Metallic Iron and Chlorine Gas from Chloride WasteBy Yves Pépin, Sylvain Lefebvre, Dimitrios Filippou, Guillaume Hudon
"Titanium dioxide pigment plants using the so-called “chloride process” produce considerable amounts of chloride waste, which contains predominantly iron chloride. In most cases, this waste is dissolv
Jan 1, 2016
-
Rotating equipment reliability for surface operation. Part I: Vibration analysis for rotating equipmentBy D. Prince, G. Nollet
"Since 1994, Aur Ressources has operated Louvicourt mine, a zinc and copper mine close to Val d’Or, at a rate of 4300 t/d. Ever since the start-up of the plant, management has encouraged innovative ap
Jan 1, 2002
-
The Behaviour of Copper during the Dissolution of Metallic Nickel in Cuso4 SolutionsBy L. V. Volkov
The equilibrium of the CuO-Cu20-Cu+-Cu2+ system with various chloride ion concentrations in solution in the presence or absence of an oxidant was investigated. It is shown, that, regardless of the pre
Jan 1, 2007
-
The behaviour of zinc, cadmium, thallium, tin and selenium during ferrihydrite precipitation from sulphate mediaBy J. E. Dutrizac, J. M. Zinck
Ferrihydrite is often the initial precipitate resulting from the rapid neutralization of Fe(III) sulphate solutions, and it seems to be a major constituent of zinc plant neutral leach residues. The mo
Jan 1, 1998
-
Cerro Verde Project ? Stage 1 ?Copper ? Oxides to Cathodes?By Victor R. Eyzaguirre
Cerro Verde is one of several large porphyry-type copper deposits in Southern Peru. The copper occurs as primary sulphides, with a significant oxide capping. The exploitation of the deposit has been c
Jan 1, 1978
-
Simulation of an SX/EW Pilot PlantBy Hossein Aminian, Daniel Hodouin, Claude Bazin, Claude Jacob
"Solvent extraction followed by electrowinning (SXEW) is an economical option for the processing of low grade and oxidized copper ore. Phenomenological models were developed to simulate the copper sol
Jan 1, 1999
-
Monitoring and targeting of plant utilities at INCO Limited, Sudbury, Garson MineBy D. Pacey
"This paper reviews the installation, start-up, and operation of a comprehensive monitoring and targeting management technique in which all plant utilities (i.e., electricity, natural gas, compressed
Jan 1, 1997
-
Financial Aspects of Mine OperationBy A. H. C. A. Zimmerman
WE have just heard what must be regarded as a thoughtful, constructive and somewhat painful analysis of the financial function of our industry. While thinking about this, it is interesting to reflect
Jan 1, 1962
-
A Non-Nuclear Density Meter and Mass Flow System Measuring Mining Slurries with Entrained GasBy R. H. Batey
"The process control and cost of monitoring mining slurries is normally accomplished using a continuous mass flow system, conventionally embodying a volumetric magnetic flow meter and nuclear density
Jan 1, 2013
-
Design and Implementation of a Brownfield Sag Pre-Crush CircuitBy G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - DraftIn order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla
Apr 1, 2005