Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • CIM
    Synthesis of Li2tTiO3 Powders by a Hydrothermal Process

    By L. Kong, V. G. Papangelakis, L. Li

    "The Eh-pH diagram of lithium-titanium-water system at 25°C, 100 °C and 200 °C was constructed. It shows that there exist thermodynamic stability areas of Li2TiO3. This indicates a thermodynamic possi

    Jan 1, 2012

  • CIM
    One Hundred Years of Cyanidation

    By Fathi Habashi

    The year 1987 marked the centennial of the beginning of modern hydrometallurgy. On October 19, 1887 British Patent No. 14174 entitled Process of Obtaining Gold and Silver from Ores was issued*. The di

    Jan 1, 1999

  • CIM
    Morphology of Environmentally Assisted Cracks in Pipeline Steel (02425a31-82ac-48df-900e-2f0f4bebe2ef)

    By A. Plumtree

    The morphology of environmentally assisted cracks in stressed pipeline steel has been investigated. For a dilute and neutral solution (NS4) simulating ground water in contact with the steel, semi-elli

    Jan 1, 2005

  • CIM
    Removal of Arsenic Content from Copper Concentrates by Electrochemical Flotation

    Arsenic bearing minerals such as enargite (Cu3AsS4) and tennantite (Cu12As4S13), which may associate with major copper minerals such as chalcopyrite (CuFeS2), chalcocite (Cu2S) and bomite (Cu2FeS4), u

    Jan 1, 2007

  • CIM
    Autoclave Application for Zinc Leach Residue Treatment by Akita Zinc Co., Ltd.

    By H. Arima, Y. Kudo

    In general, the iron content of zinc leach residue produced by sulphuric acid leaching from calcine is disposed as jarosite or goethite into a tailing dam. More recently, these iron residues have been

    Jan 1, 2004

  • CIM
    Hematite versus Jarosite Precipitation in Zinc Production

    By M. Lahtinen

    Traditionally, there have been three main methods for iron removal in the hydrometallurgical production of zinc. These methods are atmospheric precipitation of jarosite or goethite and pressurised pre

    Jan 1, 2006

  • CIM
    Recovery of Europium and Yttrium from Spent Fluorescent Lamps

    By M. A. Rabah

    This study aims to recover europium, yttrium metals, some valuable salts or oxides from the white powder (apatite) coating the inner surface of spent florescent lamps (SFLs). Pressure leaching using s

    Jan 1, 2004

  • CIM
    Analysis of open-pit truck haulage system by use of a computer model

    By V. J. Hucka, J. H. Tu

    "A computer model has been developed for evaluating the performance of truck and shovel operations in an open-pit mine. The data required for describing the haulage network are simplified and shift st

    Jan 1, 1985

  • CIM
    Huckleberry Mines Ltd. Process Design and Project Startup

    By Greg Rasmussen

    "Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b

    Jan 1, 1998

  • CIM
    Corrosion Study of the Skin and Bulk of Die-Cast and Thixocast AZ91d Alloy in CF Solution Using Electrochemical Noise Technique

    By A. -M. Lafront

    The corrosion resistance of die-cast and freely-solidified and electromagnetically-stirred thixocast AZ91D alloy has been studied using electrochemical noise technique in a 0.05M NaCI solution at pH 6

    Jan 1, 2007

  • CIM
    Applications of NSC Pressure Leaching

    By C. G. Anderson

    Industrially proven and applied nitrogen species catalyzed (i.e. NSC) acidic pressure leaching has been utilized to treat a number of ores, concentrates and recycled materials. This versatile technolo

    Jan 1, 2004

  • CIM
    Studies on hot working and microstructure evolution of aluminum alloys in Russia

    By D. S. Salonine

    Aluminum alloys offer a wide range of capability with a unique combination of advantages that makes them the materials of choice for numerous products and markets. One of the most important applicatio

    Jan 1, 2004

  • CIM
    Continuous Training – Insurance for Sustainable Operation

    By Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala

    Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co

    Jan 1, 2019

  • CIM
    Galvanic Coupling between Carbon Steel and Stainless Steel Reinforcements

    By S. Qian

    Galvanic corrosion is a potentially major concern associated with the application of stainless steel reinforcement which is in direct (electrical) contact with carbon steel reinforcement in concrete s

    Jan 1, 2005

  • CIM
    Corrosion properties of skin and bulk of semi-solid processed and high pressure die cast AZ91 alloy

    By C. Blawert

    The corrosion properties of the skin and the bulk of semi-solid processed and high pressure die cast AZ91 alloy were studied in 5% NaCI solution by (a) analysing the corrosion morphology, (b) measurin

    Jan 1, 2004

  • CIM
    A Process for Preparing Tungstic Trioxide of High Purity from a Canadian Scheelite Concentrate

    By W. A. Gow, J. A. Vezina

    "A new process for treating scheelite for the production of tungstic tri-oxide is described. The novelty of the process resides in that an ion-ex-changer is used to convert sodium tungstate to either

    Jan 1, 1966

  • CIM
    Investigation into Oxidative Dissolution of Enargite with Chlorine Dioxide

    By G. W. Norval, V. G. Papangelakis, G. A. Moldoveanu

    Smelting has been the primary method of treatment for refractory copper sulfide concentrates such as enargite (Cu3AsS4), but the pyrometallurgical processing generates elevated levels of volatile arse

    Jan 1, 2014

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Stress in Full Deposit Electrowon Nickel

    By L. Bryson, J. H. W. M. Brits, K. Voogt

    "The Anglo American Platinum’s Rustenburg Base Metals Refinery (RBMR) has the world’s first full deposit nickel plating tankhouse. Impurities in the nickel electrolyte can induce stresses in the elect

    Jan 1, 2017