    The Role of Rock Engineering in Developing a Deep Geological Repository in Sedimentary Rocks

    By Rodney S. Read

    Both crystalline and sedimentary rocks are being considered to host a deep geological repository (DGR) for nuclear fuel waste in Canada. In the past several decades, considerable research has been con

    May 1, 2009

  • CIM
    Groundwater control in open pit mines in the Kursk region of the Soviet Union

    By Yu. V. Ponomarenko, A. I. Meka, P. A. Witherspoon, Yu. I. Volkov, J. E. Gale

    "The mining of iron ore in the Kursk Magnetic Anomaly (KMA) region of the U.S.S.R. is done mostly by the open-cut method. An assembly of open pits capable of producing about 100 million tons of ore pe

    Jan 1, 1992

  • CIM
    Risk Management in Carbon Sequestration: Case Studies from Unconventional Reservoirs in the Appalachian Basin

    Risk management has taken on renewed vigor since the economic crisis of the late 2000s. The resources of governments, individuals, and corporations are being stretched to a point where only the most p

    Aug 1, 2013

  • CIM
    In-Pit Crushing and Conveying: Fitting a Square Peg in a Round Open Pit

    By Robert J. McCarthy

    Many technologies have been adopted over the last half century for the haulage of material from open pit mining operations. Some of the technologies utilized include rail, off-highway trucks, conveyor

    May 1, 2011

  • CIM
    Innovation and perseverance: breaking new ground in hard-rock shaft sinking in the 1990s

    By M. J. Medd, G. A. Speirs

    "This paper describes the simultaneous sinking and equipping of a 4.9 m diameter concrete-lined shaft to a projected depth of 1660 m. The shaft blast design utilizes the full face method using a paral

    Jan 1, 1991

  • CIM
    Canada to Host the XIV International Mineral Processing Congress in Toronto in October 1982

    By P. D. R. Maltby

    "The Canadian Institute of Mining and Metallurgy has undertaken to host the XIV International Mineral Processing Congress to be held in Toronto at the Royal York Hotel from October 10 to 16, 1982. The

    Jan 1, 1980

  • CIM
    Energy Efficient Technologies for the Mining Industry

    By Bern Klein

    Motivation for Improved Energy Efficiency in Mining ? Canada potentially adopting Greenhouse Gas Emissions and Intensity Legislation in 2013 ? BC -Climate Action Plan and Energy Conservation Agreeme

    May 1, 2010

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    Capital Cost Estimating for Mineral Processing Plants

    By R. J. Balfour, T. L. Papucciyan

    "INTRODUCTIONCapital Cost considerations are basic to feasibility in the achievement of success for Mineral Processing Projects as much as or more than in many other industries. Capital cost is an imp

    Jan 1, 1972

  • CIM
    Applications for Magnetic Mill Linings at the Horne Concentrator of Noranda Mines Limited

    By P. W. Godbehere

    "INTRODUCTIONMagnetic mill linings have been developed from an invention by Mr. Bertil Brandt, the originator of the Skega rubber lining. The OREBED magnetic mill lining is a concept in which rubber c

    Jan 1, 1983

  • CIM
    The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho Deposit

    By Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl

    The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b

    Jan 1, 2014

  • CIM
    Autoguided Vehicles in a Production Environment

    By Fabien Miller

    Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p

    May 1, 2002

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Towards Sustainable Mining

    ?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can

    May 1, 2011

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • CIM
    Technology Options and Innovation for Copper Heap Leaching

    By Damian Connelly

    The metallurgical heart of the majority of copper oxide processes is the heap leaching operation. Fresh low grade sulfide ores is a far greater challenge.The success of this unit operation is so impor

    Jan 1, 2019

  • CIM
    The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora North

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss

    Jan 1, 2013

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013