Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Continuous SAG Volumetric Charge Measurement

    By Andre Vien, Jean-François Dupont

    "Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p

    Jan 1, 2001

  • CIM
    Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals

    By David G. Almond

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi

    Jan 1, 2005

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • CIM
    Installation of Flash Flotation Units at the Louvicourt Concentrator

    By Bernard Dallaire, Jean Cayouette, Sylvain Duchesne

    "Louvicourt Mine's concentrator, located near Val d'Or, Quebec, treats an average of 4,300 tonnes of ore per day composed mainly of copper, zinc, gold and silver. An analysis of concentrator revenues

    Jan 1, 2001

  • CIM
    Significant Improvements are Possible from Process Optimization

    By Jon R. Maki

    "EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for

    Jan 1, 2014

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study

    By M. C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles an

    May 1, 2005

  • CIM
    Fuel cell versus diesel loader operation: Cost-benefit analysis study (6b80a653-d0e2-439c-a343-5c05fb591d61)

    By G. Righettini, G. Desrivières, P. Mousset-Jones, R. Lacroix, M. C. Bétournay, P. Laliberté, S. Hardcastle

    "Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles a

    Jan 1, 2005

  • CIM
    The transition of mining methods at Anderson Lake Mine

    By Seppo Haapamaki

    "Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i

    Jan 1, 1988

  • CIM
    Promises, Promises: Students, Industry and The New Labour Market

    Geology grads mine heated job market Salaries up 44 per cent in three years ?[Geology student] passed up a $100,000-a-year job at a mining company last December when he finished his degree in geol

    May 1, 2008

  • CIM
    Safety Lessons Learned Building two Diamond Mines

    By D. L. Putnam

    Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile

    May 1, 2008

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    A 21st century advancement for mine hoisting systems: Frictionless non-powered emergency arrestors

    By E. Pribonic

    Failure of a mine material hoist can cause injuries, fatalities and significant infrastructure damage, along with an associated loss of production. Principal causes of hoist accidents are overwind and

    Jan 1, 2008

  • CIM
    Prospects for the Canadian uranium industry

    By O. J. C. Runnalls

    "Canada became the world's largest uranium producer in 1984. That leadership position is likely to be maintained for many years into the future because of a firm production base, many undeveloped

    Jan 1, 1988

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    Safe mining practice at Quinsam coal mine

    By K. Galovich, P. Krivokuca

    "Quinsam coal mine is located about 25 km west of Campbell River on the east coast of Vancouver Island, British Columbia. Using continuous miners in a fully mechanized retreat room-and-pillar operatio

    Jan 1, 2004

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Large-scale panel destress blast at Brunswick mine

    By B. P. Simser, R. K. Brummer, A. Mortazavi, P. P. Andrieux

    "A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically important neighbouring mining region. This work, sponsored by

    Jan 1, 2003

  • CIM
    Development of Oxidation Resistant Titanium Alloys by Niobium Addition

    By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers

    The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li

    Jan 1, 2014