Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Primary Breaking at Snow Lake

    By J. S. Roper

    "IntroductionSNOW LAKE is situated in northern Manitoba at latitude 54° 55 and longitude 100°, 400 miles northwesterly of Winnipeg, 80 miles northeast of The Pas, 80 miles east of Flin Flon. A 38-mile

    Jan 1, 1955

  • CIM
    Raglan project optimization and economics

    By T. F. Pugsley, D. Gignac

    "The historical background to the project dates back to the mid-30s with the discovery of surface sulphide showings in the Cape Smith-Wakeham Bay ultramafic belt. In the mid1950s, orderly exploration

    Jan 1, 1996

  • CIM
    Extraction of No. 2 East Pillar at Waite-Amulet Mines, Limited

    By M. A. Cawley, J. W. Jordan

    "IntroductionTHE ORE PILLARS in the lower ""A"" ore body of Waite Amulet Mines, Limited, can be divided into two groups, those mined in the open by sub-level blast-hole methods, and those to be mined

    Jan 1, 1955

  • CIM
    Geophysics of the Montcalm Township Copper-Nickel Discovery

    By Douglas C. Fraser

    A DIGHEM survey was flown in the Belford-Montcalm Township area of Ontario in November 1975. This 600-linemile survey resulted in the detection of 134 EM anomalies. The Montcalm Township copper-nickel

    Jan 1, 1978

  • CIM
    Stone Dusting

    By W. S. McDonald

    PRACTICALLY all dusts derived from organic matter are explosive and instances are recorded of explosions-some of them extremely violent-having occurred in grain elevators and flour mills. While a disc

    Jan 1, 1938

  • CIM
    Nor-Acme Mine (38a3a98c-c47b-464f-b6c8-c0ff6e104948)

    By J. M. Harrison

    "The Nor-Acme gold mine is near the shore of Snow lake, northern Manitoba, about 75 miles east of Flin Flon. The claims that form the nucleus of the present property were staked in 1927 by C. R. Parre

    Jan 1, 1954

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Crushing and Grinding Practices at Brenda Mines Limited

    By G. P. Holmes

    "IntroductionThe copper-molybdenum property of Brenda Mines Ltd. is located 18 miles north west of Peachland in the Okanagan Valley of the Southern Central interior of British Columbia. The actual sit

    Jan 1, 1972

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014

  • CIM
    Selection of large diameter wire rope for use on surface milling excavators

    By Ronald G. Hamm

    "With the advent in Canada of large open-pit equipment, the associated wire rope required must keep pace, especially in design and construction, along with the field that leads to increased rope life.

    Jan 1, 1983

  • CIM
    Inter-provincial competition and the Canadian potash industry

    By David L. Anderson

    "The objective of this paper is to describe the potential impact of inter-provincial competition f or new output capacity on the Canadian potash industry. It will be shown that the ramifications of su

    Jan 1, 1985

  • CIM
    Multi-Tiered Project Delivery Systems Selection for Capital Projects

    By O. Moselhi

    This paper describes a method for selection of most suitable project delivery systems for capital projects. It expands upon the method advanced by the Construction Industry Institute (CII) in 2003, an

    Aug 1, 2013

  • CIM
    The Benefits of AG Milling for Diamond Liberation when Processing Soft Kimberlites (e79715fa-d210-4775-a49c-94a480574caf)

    By J. E. Danoczi, J. A. Herbst

    "Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne (FalC) area in central Saskatchewan. The first st

    Jan 1, 2012

  • CIM
    Variation of gold content with depth the San Antonio gold mine

    By D. H. Whiting, A. J. Sinclair

    "The San Antonio gold mine, in the Archean Rice Lake Greenstone Belt, was in continuous production from 1932 to 1968, during which period the mine yielded 1.35 million ounces (41 985 kg) of gold and 1

    Jan 1, 1990

  • CIM
    Midwest Joint Venture high-grade uranium mining – underground

    By H. K. Fredrickson

    "Midwest Joint Venture (MJV) owns a high-grade uranium deposit in northern Saskatchewan. The deposit is located too deep below surface to be mined economically by open pit methods, and as a consequenc

    Jan 1, 1992

  • CIM
    Measuring Thermally-Induced Rock Block Displacement inside a Controlled Climate Laboratory

    By Y. H. Hatzor, D. Bakun Mazor

    "A new model for thermally-induced block displacement in discontinuous rock slopes is being explored inside a Controlled Climate Laboratory (CCL). The model is based on a hypothesized wedging mechanis

    Jan 1, 2015

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2016

  • CIM
    Methods for recovering fine placer gold

    By Wang Wenqian, George W. Poling

    "Devices and flowsheets for recovering fine placer gold are reviewed. Inefficiencies of gravity processing techniques are documented and discussed. Prospects of combining gravity and froth flotation t

    Jan 1, 1983

  • CIM
    The Canadian Mineral Industry 1900 to 1975

    By Ralph D. Parker

    THE subject matter of this paper will be primarily restricted to the metallic mineral industry, which last year was responsible for almost 60 per •Cent of the total value of Canada's mineral productio

    Jan 1, 1962