Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design of liner plate culverts for underground mining environment

    By Roy EI. Durr, Glen R. Davidge

    "This paper presents the results of structural analyses and full-scale destructive tests conducted on liner plate culverts. The purpose of this work was to establish a design method and evaluate the s

    Jan 1, 1995

  • CIM
    Design of a Control Strategy for Kidd Creek Grinding Circuit Line B

    By S. Pinard, A. Desbiens, R. del Villar, D. Jakelski

    "During the fall of 1993, a new Pill-based control strategy was installed in the B grinding circuit at the Kidd Creek Division of Falconbridge Ltd. The control strategy was first evaluated on a grindi

    Jan 1, 1994

  • CIM
    Testing of Pyromag TM for Energy Efficient Hot Magnetic Seperation

    By Ian Sherrell, Michael Pirie, Riddhika Jain

    "Conventionally, direct reduced iron (DRI) mixed with char from rotary furnace discharge is cooled down before separating the char via magnetic separator. The DRI must then be reheated for further dow

    Jan 1, 2016

  • CIM
    Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta

    By R. F. Dawson, A. S. Bagnall, K. Barron

    "At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t

    Jan 1, 1995

  • CIM
    Blast monitoring and tile law

    By Rene A. Morin, John K. Kebe

    "As explosives become more widely used in urban and other congested areas, governmental regulations pertaining to their use are becoming more pervasive and stringent. This is forcing the blasting indu

    Jan 1, 1985

  • CIM
    Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta (b00134fd-f294-4823-b57d-05c31c7f1dcd)

    By R. F. Dawson, A. S. Bagnall, K. Barron

    "At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t

    Jan 1, 1995

  • CIM
    Effective non-destructive testing (N.D.T.) of mine haulage equipment

    By W. F. Harkness, D. Hodgkinson

    "A non-destructive testing program was established at Crows Nest Resources (C.N.R.), Line Creek mining operation following an in-service fatigue failure of a front wheel spindle on a large haulage tru

    Jan 1, 1987

  • CIM
    The Geological Setting and Estimation of Gold Grade of the High-grade Zone, Red Lake Mine, Goldcorp Inc.

    By Stephen Mcgibbon, Tim Twomey

    "Abstract - The High-grade Zone (HGZ) was discovered 5000 ft (1520 m) below surface in the hangingwall of the existing orebody, 46 years after the Red Lake mine first went into production. The very ri

    Jan 1, 2001

  • CIM
    Dynamic modelling, simulation and control of a grinding circuit

    By H. W. Smith, D. Guerin

    "This paper describes the development of a dynamic model for a full- scale (64 tonnes/hr) grinding circuit consisting of an open-circuit rod mill feeding a ball mill operating in closed circuit. The o

    Jan 1, 1980

  • CIM
    The Hull iron range: 1801-1977

    By D. D. Hogarth

    "IntroductionThe Hull iron range, comprising the Forsyth, Scott , Baldwin and Lawless properties (Fig. I), is in Gatineau Park, on the outskirt s o f the city of Hull , and about 6 miles (10 kilometre

    Jan 1, 1983

  • CIM
    South Main Shaft at Flin Fion

    By J. P. Caulfield

    THE Hudson Bay Mining and Smelting Company's underground mine at Flin Flon, Manitoba, has in the past been serviced by two working shafts-the North Main shaft, and the No. 3 shaft. The North Ma

    Jan 1, 1941

  • CIM
    Exploration (b5d994dc-54d9-422d-9999-62e9a88e4dbc)

    By D. R. Derry

    "IT WOULD TAKE a braver man than I to try to forecast the future of mining exploration far into Canada's second century. Even to look ahead ten or twenty-five years we must review the figures of the f

    Jan 1, 1968

  • CIM
    Functional training at Inco's Thompson Mine

    By W. F. Scott, K. L. Somerville

    "This paper outlines the development and inplementation of functional training at the Thompson Mine of Inco Metals Company, Manitoba Division. This training is an extension of similar methods implemen

    Jan 1, 1981

  • CIM
    Shape Characterisation: Can Different Devices Produce Comparable Data for Particulate Samples?

    By Megan Becker, Aubrey Mainza, Indigo Research Laboratories, Jenny Wiese, Gaynor Yorath, Lucy Little

    Particle shape characterisation has an important role to play in mineral processing, to clarify effects of shape on rheology, equipment wear rates, comminution, classification, sizing and flotation. H

    Jan 1, 2016

  • CIM
    Reduction of Magnetite and Cuprous Oxide from a Liquid Slag with Carbon

    By A. Warczok, T. A. Utigard

    "Slags from smelting of copper concentrates contains from 1 to 15% of copper. Copper is present in the form of copper or copper matte inclusions of size from 2 to 1000 micro, and as dissolved cuprous

    Jan 1, 2015

  • CIM
    Evaporation Losses from Crude Oils

    By J. W. Gregg, P. M. Dranchuk, D. L. Flock

    "From preliminary investigations it has been observed that although evaporation losses may be estimated by comparing single values of certain physical properties of crude oils and their evaporation re

    Jan 1, 1960

  • CIM
    Sudden slumping of hydraulic fills inside geotextile bags

    By H. J. lgner

    Hydraulic fills are widely used in the tabular, steeply dipping stopes of the South African gold and platinum mines as an integrated process within a daily cycle of drill and blast. There is therefor

    May 1, 2007

  • CIM
    The Shear Strength of McMurray Oil Sands

    By G. F. Round

    In order to obtain values of angle of shearing resistance and initial resistance for McMurray oil sand for use in general design calculations, the shear strength of this oil sand was measured in a con

    Jan 1, 1960

  • CIM
    Sheerness — A new coal mine for Alberta

    By Keith Haddock

    "The Sheerness Mine, a new surface coal mine located near Hanna, Alberta, went into full production in mid-1995. The mine, which is operated by Luscar’s subsidiary Forestburg Collieries (1984) Ltd., h

    Jan 1, 1997

  • CIM
    The Manufacture of Silica Brick (0a1af218-3b0d-414e-a6bb-404d1bfed003)

    By H. B. Gillis

    THE following pages c9ntain a brief description of the processes involved in the manufacture of silica brick at the Sydney plant of the Dominion Steel & Coal Corporation. Silica brick manufacture wa

    Jan 1, 1938