Development Through Paste and Rock FillBy Robert White
?Introduction of BMS?Paste fill generalities?Development through paste?Development through rock fill?Conclusion ?Brunswick mine is operated by Xstrata. The mine has been in operation since 1964 and p
Feb 1, 2008
-
Cost Savings Through Improved Ore Recovery Using Automated Core Logging and Ore Sorting Imaging Spectrometers.By Gavin A. Hunt
In order for mines to operate profitably throughout their life it is important to monitor and maximise ore recovery. A common problem facing many mines is the underestimation of clay type and its dis
May 1, 2007
-
Effect of Heat Treatment on the Bending Behavior of Cu/Al Composite WiresBy Haofeng Xie, Lijun Peng, Xujun Mi, Xue Feng, Xiangqian Yin, Zhen Yang, Guojie Huang
The Cu/Al composite wires have been widely used in cable industry. Especially in the development of aerospace, the light weight character of wires is particularly important. The wires are fabricated b
Jan 1, 2019
-
Bubble Surface Area Flux: A Parameter to Characterize Flotation CellsBy R. Filippone, Donald Leroux, Colin Hardie, G. Leichtle, Cesar Gomez, Jim A. Finch
"Bubble surface area flux (Sb) is the surface area of bubbles per unit time per unit cross-sectional area of flotation machine. The units are: (m2 bubble surface/s)/(m2 cell) or s -1. For bubbles of m
Jan 1, 1999
-
The application of a total energy system at the Polaris mining projectBy A. Nielsen
"The Polaris mining operation (Fig. I) is located on Little Cornwallis Island in the Canadian Arctic, an area with a very limited shipping season and a hostile climate. The operation consists of the u
Jan 1, 1984
-
A study on kriging small blocksBy Margaret Armstrong, Normand Champigny
"In order to define the ore/waste boundaries as finely as possible, mine planners often insist on kriging very small blocks (relative to the spacing of the available sample grades). These kriged estim
Jan 1, 1989
-
The Ontario Securities ActBy W. E. Segsworth
Introduction By far the largest part of the money raised for mining is raised by honest and legitimate means; but a not inconsiderable amount is raised by fraudulent sales methods. It will be conced
Jan 1, 1934
-
The Electrical System of the Hudson Bay Mining and Smelting Company, LimitedBy G. F. Cross
INTRODUCTION THE electrical system associated with the mining development of the Hudson Bay Mining and Smelting Company, Limited, at Flin Flon, Manitoba, may be conveniently divided into three main p
Jan 1, 1935
-
Study of a New Large Scale Borehole Soundless Cracking TechnologyBy Q. J. Xu
In blasting sensitive areas, the use of traditional blasting for rock fracture is restricted. Soundless cracking technology has been presented to achieve rock fracture instead of blasting. However, wh
Aug 1, 2013
-
Study on Sulfidation Roasting and Flotation of Refractory Lead-Zinc Oxide OreBy Ltd Changsha Research Institute of Mining and Metallurgy Co., Shi Yunliang, Luo Yunbo, Chen Jun, Liu Miaohua, Xiao Jinxiong, Long Yan
"A refractory lead-zinc oxide ore located in Yunnan has hundreds of tons of metal reserves, which is hard to be recovered effectively by conventional oxide ore beneficiation methods. In this study, by
Jan 1, 2016
-
The Engineering Department of the Hudson Bay Mining and Smelting Company, LimitedBy J. A. Haskin
The Engineering Department at Flin Flon has the following responsibilities: 1. Underground Surveying. 2. Open-Pit Surveying and Supervision of Blasting. 3. Mine Geology and Examination of Prospects
Jan 1, 1935
-
Simulation as a tool for quantifying design parameters for material handling systemsBy D. W. Ginsberg, D. Cieplinski
"The lifetime cost of a material handling system, or any mine system, can be reduced through the application of quality engineering. Dynamic simulation is a powerful tool that can be used to enhance t
Jan 1, 1998
-
The Stillwater Paste Backfill PlantBy Frank Yu, Bob Fukuhara
"The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe
Jan 1, 2000
-
Restauration Du Site Minier Poirier (Joutel) - Expériences Acquises Et Suivi Des TravauxBy Richard Maurice
RÉSUMÉ La restauration du site minier Poirier, à Joutel s?est déroulée entre 1998 et 2001. Le principal élément des travaux a été la restauration du parc à résidus et des zones d?épanchement qui tot
Nov 1, 2002
-
The use of a geographic information system for open pit mine developmentBy U. Dillon, G. Blackwell
"Geographic information systems (GIS) provide an efficient means for the recording, manipulation, revision, display and analysis of spatially referenced data. GIS are widely used at the exploration st
Jan 1, 2003
-
The Challenges of Adaptive Processing to Geostatistical PredictionsAdaptive Processing as proposed in geometallurgy has to rely on spatially interpolated information on geometallurgical parameters like phase composition, size distributions of particles of different p
Aug 1, 2013
-
Open Stope Exposure Time and Stope DilutionUnplanned open stope hanging wall dilution is a significant cost for many open stope mining operations. Significant advances in empirical and analytical approaches for estimating stope dilution have b
May 1, 2003
-
Base-Metal Deposits of the Bathurst-Newcastle District: Characteristics and Depositional Models (e2fcbc36-94fa-4bf9-92bb-6227c20c24f4)By Steven R. McCutcheon
"The Bathurst-Newcastle district, a subcircular area approximately 50 km in diameter, contains 37 massive-sulfide Zn-Pb-Cu deposits that have defined tonnages, and has 58 additional significant occurr
Jan 1, 1992
-
Campaign Life Extension and Refractory Management of Copper Making FurnacesBy T. Gonzales, M. Maleki, M. Caçador, B. Climenhaga, H. Ghorbani
The campaign life of furnaces in the copper making industry is greatly affected by damage caused by normal operation cycling and abnormal conditions. Proper monitoring and assessment of the existing c
Jan 1, 2019
-
Failure Mechanism of Pea Gravel within the Annular Gap of a Shield-TBM Driven TunnelBy M. R. Henzinger, W. Schubert
"The quality of the backfill applied at a shield driven tunnel is of significant importance failure of the lining. The used material also affects the interplay between support and excavation behaviour
Jan 1, 2015