Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Climate Change and Canadian Mining: Opportunities for Adaptation

    By Jason Prno

    Context ? Climate change an issue of global significance ? Research is lacking ? Study initiated by the David Suzuki Foundation, led by ArcticNorth Consulting Industry Surveying ? 34% and 48% of

    May 1, 2010

  • CIM
    High-Temperature Heat Pumps for Industry

    By Ron Ferris

    The Westinghouse Temptifier TM, using heat pump principles, recovers lowgrade waste heat in the 600P to 1600P temperature range and amplifies it to usable levels of up to 2200P. Coefficients of perfor

    Jan 1, 1979

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    Mine planning and design integration

    By Earl Gebhardt

    The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain in

    Feb 1, 1993

  • CIM
    Tire-Rim Interactions and Predictions at High G Loading

    By T. G. Joseph, M. Bolster, M. Curley

    "High tirerim loading on haul trucks operating on rough ground frequently manifests as mechanical separations and rim base cracking caused by cyclic fatigue. This paper provides an understanding of th

    Jan 1, 2019

  • CIM
    The Jinia Copper Smelter

    By D. C. Treilhard

    After a brief history of the mining and smelting operations of Kilembe Mines Limited, this paper outlines the smelter layout and describes . the. daily operations at the Jinja plant. Particular attent

    Jan 1, 1966

  • CIM
    Mining PMGS To BOOSTRAP Commercial Space

    By Christine Hansen

    ?Kiss my Asteroid? Unofficial Title Human life is tied to minerals It?s worth noting that: The living human body consumes minerals. The minerals we take in multivitamins show the close linka

    May 1, 2013

  • CIM
    Research Progress on Mine Rescue Robots

    By Hong-wei Ma

    With social development and technological advancement, mine rescue robots used in complex environments have developed as a research hotspot. This paper reviews the progress of research on coal mine re

    Aug 1, 2013

  • CIM
    Winter Operation of Heavy Equipment ... Pine Point Mines limited

    By J. M. B. Scarborough

    This paper deals with measures taken to maintain effective operation of heavy-duty equipment in open-pit mining. at Pine Point, N.W.T., during periods of extreme cold weather. The points covered inclu

    Jan 1, 1966

  • CIM
    The Installation and Operation of Heap Leaching Test Facilities

    By J. Maheu

    Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test

    Jan 1, 1982

  • CIM
    Diagnostic Characteristics of IOCG Deposits and IOCG-Prospective Terranes

    By Patrick J. Williams

    Defining Features of IOCGs ? Sulphur-poor Cu-Au(-Fe) deposits ? Contain low-Ti iron oxides ? Hydrothermal origin (breccia, vein, replacement) ? Local structural controls (no ?causitive? intrusions

    May 1, 2006

  • CIM
    Cabot Corp. - Tantalum Mining Corporation of Canada Ltd.

    By William Ferguson, Claude Deveau, Wade Hazel, Stephen R. Young, Allen Lussier, Robert Copeland

    "LocationSometimes known as the Bernie Lake mine, the mine is located about 180 km east-northeast of Winnipeg on the northwestern shore of Bernie Lake, close to the Nopiming Provincial Park and the Ma

    Jan 1, 2000

  • CIM
    Effect of Various Additives on Valuable Metals Recovery from Copper Cliff Converter Slag

    By A. Mitrašinovic, A. Wolf

    "The aim of this investigation was to determine the most suitable additive for recovering metals from converter slags generated during Ni extraction. Fluxes analyzed were silica and lime and reductant

    Jan 1, 2015

  • CIM
    Development of a Total Station with a Concentric Circle Reticle and a Navigation System for Pile Driving

    By Kazuhide Nakaniwa

    In this research, we devised a measurement method using total stations (TSs) which have ?the Baum? which is a concentric circle reticle, as substitute for crosshairs. The Baum owes its name to the sim

    Aug 1, 2013

  • CIM
    Overview of the EU Chemicals (REACH) Proposal and its Potential Impact on the Canadian Aluminum Industry

    By G. Barrasso

    REACH was proposed by the EU Commission in October 2003 and stands for the Registration Evaluation, Authorisation and Restriction of Chemicals. It requires that all substances identified as persistent

    Jan 1, 2006

  • CIM
    Parametric BIM Objects Exchange and Sharing Between Heterogeneous BIM Systems

    By Yu-Min Cheng

    Over the past two years, the construction industry has increasingly recognized the benefits and capabilities of building information modeling (BIM) for information integration, visualization and param

    Aug 1, 2013

  • CIM
    Maximiser ? Beyond Pit Optimisation

    By M. A. Kelly

    Pit Optimisation using the Lerchs Grossman algorithm has been successfully applied in many deposits. Pit shells often form the basis for scheduling. Pre-assigned costs may not accurately reflect the c

    May 1, 2007

  • CIM
    The Equator Principles and Beyond

    By Tim Bekhuys

    Equator Principles ? Applies to projects > $10 million ? Voluntary agreement between 58+ EPFIs ? Categorized projects based on environmental risk, consequences ? Requirements for EA, EMP, use of s

    May 1, 2008

  • CIM
    Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine Caving

    By C. O?Connor

    With ever-increasing global demand for mineral resources, numerous mines are moving towards developing and mining deeper, more complex and lower grade ore bodies. In many cases, mass mining methods (e

    May 1, 2007

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003