Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Tire-Rim Interactions and Predictions at High G Loading

    By T. G. Joseph, M. Bolster, M. Curley

    "High tirerim loading on haul trucks operating on rough ground frequently manifests as mechanical separations and rim base cracking caused by cyclic fatigue. This paper provides an understanding of th

    Jan 1, 2019

  • CIM
    The Jinia Copper Smelter

    By D. C. Treilhard

    After a brief history of the mining and smelting operations of Kilembe Mines Limited, this paper outlines the smelter layout and describes . the. daily operations at the Jinja plant. Particular attent

    Jan 1, 1966

  • CIM
    Mining PMGS To BOOSTRAP Commercial Space

    By Christine Hansen

    ?Kiss my Asteroid? Unofficial Title Human life is tied to minerals It?s worth noting that: The living human body consumes minerals. The minerals we take in multivitamins show the close linka

    May 1, 2013

  • CIM
    Research Progress on Mine Rescue Robots

    By Hong-wei Ma

    With social development and technological advancement, mine rescue robots used in complex environments have developed as a research hotspot. This paper reviews the progress of research on coal mine re

    Aug 1, 2013

  • CIM
    Winter Operation of Heavy Equipment ... Pine Point Mines limited

    By J. M. B. Scarborough

    This paper deals with measures taken to maintain effective operation of heavy-duty equipment in open-pit mining. at Pine Point, N.W.T., during periods of extreme cold weather. The points covered inclu

    Jan 1, 1966

  • CIM
    The Installation and Operation of Heap Leaching Test Facilities

    By J. Maheu

    Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test

    Jan 1, 1982

  • CIM
    Diagnostic Characteristics of IOCG Deposits and IOCG-Prospective Terranes

    By Patrick J. Williams

    Defining Features of IOCGs ? Sulphur-poor Cu-Au(-Fe) deposits ? Contain low-Ti iron oxides ? Hydrothermal origin (breccia, vein, replacement) ? Local structural controls (no ?causitive? intrusions

    May 1, 2006

  • CIM
    Cabot Corp. - Tantalum Mining Corporation of Canada Ltd.

    By William Ferguson, Claude Deveau, Wade Hazel, Stephen R. Young, Allen Lussier, Robert Copeland

    "LocationSometimes known as the Bernie Lake mine, the mine is located about 180 km east-northeast of Winnipeg on the northwestern shore of Bernie Lake, close to the Nopiming Provincial Park and the Ma

    Jan 1, 2000

  • CIM
    Effect of Various Additives on Valuable Metals Recovery from Copper Cliff Converter Slag

    By A. Mitrašinovic, A. Wolf

    "The aim of this investigation was to determine the most suitable additive for recovering metals from converter slags generated during Ni extraction. Fluxes analyzed were silica and lime and reductant

    Jan 1, 2015

  • CIM
    Development of a Total Station with a Concentric Circle Reticle and a Navigation System for Pile Driving

    By Kazuhide Nakaniwa

    In this research, we devised a measurement method using total stations (TSs) which have ?the Baum? which is a concentric circle reticle, as substitute for crosshairs. The Baum owes its name to the sim

    Aug 1, 2013

  • CIM
    Overview of the EU Chemicals (REACH) Proposal and its Potential Impact on the Canadian Aluminum Industry

    By G. Barrasso

    REACH was proposed by the EU Commission in October 2003 and stands for the Registration Evaluation, Authorisation and Restriction of Chemicals. It requires that all substances identified as persistent

    Jan 1, 2006

  • CIM
    Parametric BIM Objects Exchange and Sharing Between Heterogeneous BIM Systems

    By Yu-Min Cheng

    Over the past two years, the construction industry has increasingly recognized the benefits and capabilities of building information modeling (BIM) for information integration, visualization and param

    Aug 1, 2013

  • CIM
    Maximiser ? Beyond Pit Optimisation

    By M. A. Kelly

    Pit Optimisation using the Lerchs Grossman algorithm has been successfully applied in many deposits. Pit shells often form the basis for scheduling. Pre-assigned costs may not accurately reflect the c

    May 1, 2007

  • CIM
    The Equator Principles and Beyond

    By Tim Bekhuys

    Equator Principles ? Applies to projects > $10 million ? Voluntary agreement between 58+ EPFIs ? Categorized projects based on environmental risk, consequences ? Requirements for EA, EMP, use of s

    May 1, 2008

  • CIM
    Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine Caving

    By C. O?Connor

    With ever-increasing global demand for mineral resources, numerous mines are moving towards developing and mining deeper, more complex and lower grade ore bodies. In many cases, mass mining methods (e

    May 1, 2007

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    Determining Fill Fence Stability During Increased Backfill Rates at an Underground Hard Rock Mine

    By K. K. Dehn

    This study focused on determining the stability of thin shotcrete fill fences at a hard rock mine in northwestern Ontario during increased pour rates of paste backfill. Determination of the stability

    May 1, 2007

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    Characterization of Laser Scanners for Detecting Cracks for Post-Earthquake Damage Inspection

    By Engin Burak Anil

    Objective, accurate, and fast assessment of damage to buildings after an earthquake is crucial for timely remediation of material losses and safety of occupants of buildings. Laser scanners are promis

    Aug 1, 2013

  • CIM
    The Serra Verde Rare Earth Deposit, Goias State, Brazil: Advancing to Production

    By Denilson Coutinho, Euler Soares, Paulo de Tarso, Jordana Ferreira, John R. Goode, Andreas Sprecher, Alexandre Rocha

    The Serra Verde Project is located in the northern part of Goiás state, Brazil, and comprises 49 mineral claims covering an area of 69,814 ha. The Serra Verde deposit is a rare earth element (REE) enr

    Jan 1, 2014