SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore GrindabilityBy F. O. Verret
Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the
Jan 1, 2012
-
High-Speed Development of a 2,000-foot 12-degree DeclineBy M. D. Lawton, P. Steen
"Drilling results from the established levels at AngloRouyn Mines Limited had indicated inadequate tonnages to meet the planning schedule. It was decided to develop the main zone of the orebody below
Jan 1, 1971
-
Main Controlling Factors of the Mining-Induced Deformation and Failure of Surface Borehole and their Time-Space EffectBy Jianzhong Liu
Based on the characteristics of overburden rock strata movement, surface ground subsidence and casing deformation and failure, a tension-shear combination failure model of surface borehole was set up.
Aug 1, 2013
-
Scale Model Study of Time Domain Electromagnetic Response of Tabular ConductorsBy A. Becker, C. Gauvreau, L. S. Collett
"A scale model was designed to simulate the airborne Barringer INPUT time domain electromagnetic system. The amplitude of the response to a vertical conductive dyke varies considerably with the conduc
Jan 1, 1972
-
Hoisting at the Stobie MineBy A. M. Cameron
THE HOISTING PLANT at the Stobie section of the FroodStobie mine is a two-shaft installation designed to handle a daily production of 18,000 tons of ore at depth. The two vertical shafts are within 10
Jan 1, 1956
-
Geotechnical Challenges At The Beal Mountain Mine, MTBy David Stone
The Beal Mountain Mine near Anaconda, MT is an interesting case history of a mine that has continued operations despite several large pit wall failures over a period of about 10 years. The largest eve
May 1, 2001
-
Blasthole Stoping at Inco's Birchtree MineBy R. H. Brooks
Blasthole stoping methods were introduced at Birchtree Mine as an alternative to the original cut-and-fill and shrinkage stoping methods. The object was to take advantage of the ore structure and cond
Jan 1, 1979
-
Assessment of Performance of Powered Shield Support used on Weak FloorThe article presents an outline of methods and certain results of laboratory tests, underground tests and model tests, aimed at assessing performance of a powered shield support on the floor of low st
Aug 1, 2013
-
Underground Mining Cowichan Copper and Milling at Co. Ltd.Of the twelve known ore zones on the Sunro property, acquired by Cowichan Copper Co., only the "B" and "C" orebodies of the "River Zone" had been explored sufficiently to indicate the grade and tonnag
Jan 1, 1965
-
Dry Grinding at the Wabush Mines Pellet PlantBy A. Sobering, G. N. Carlson
"This paper describes the conversion of the grinding section of the W a bush Mines pelletizing plant from conventional wet, open-circuit trunnion overflow ball milling, with filtering, and bentonite m
Jan 1, 1971
-
The Open-Pit Mine at Asbestos HillBy Roméo Roussin
"The yearly production from the Asbestos Hill pit is 1,550,000 tons of asbestos ore, with a yield varying between 18 and 20 % . The orebody was exposed at the top of a hill, and initial production sta
Jan 1, 1976
-
Experimental Electric Smelting of Manganese Ores (ca29afc4-b842-40ff-8cd4-421e412a15a9)By R. A. Campbell
Pig iron and silicospiegeleisen were produced experimentally from a very low-grade manganiferous iron ore from Steep Rock, Ontario, by a two-stage electric smelting process. The most favourruble opera
Jan 1, 1958
-
Mining at Cupra Mines Ltd.By Claude Bourgoin
"The Copra massive sulphide deposit occurs as a continuous slab of ore dipping at approximately 40 degrees within a sericite schist formation. The orebody has been delineated over a distance of more t
Jan 1, 1966
-
Pit Design by Computer at Gaspe Copper Mines, LimitedBy F. J. Gauthier, R. G. Gray
"The possibilities of expanding the production rate from the Copper Mountain Mine have been examined using computer programs for analysing a complete range of data, beginning with the diamond drill as
Jan 1, 1971
-
Planning and Development of the Lake Dufault MineBy J. R. Smith
"The Lake Dufault orebodies were discovered by deep surface diamond drilling. When a reasonable amount of outline drilling had been completed, the decision to go into production was made. The fact tha
Jan 1, 1966
-
Energy Conservation for the Mining IndustryBy E. Howard Lambert
"Operating costs of mining plants are increasing due to the increased cost of labour, materials and fuels. Labour and materials costs are factors not readily controlled. However, the use of energy fro
Jan 1, 1973
-
Some Problems 1n the Melting and Casting of Uranium and Its AlloysBy F. H. Hueston, R. S. Barclay
"Depending on the application, zirconia, fused magnesia and graphite have been found to be the most suitable crucible materials for melting uranium metal and its alloys. Although graphite has been fou
Jan 1, 1967
-
Observation of ore pass system performance at Brunswick mine (56ecacd0-ce74-4364-ac15-e3875a5d4671)By R. Harrisson, K. Esmaieli
Brunswick mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance of ore pass systems at the mine. It presents the range of selected configura
Jan 1, 2008
-
Exploration• Expenditure, Discovery Rate and MethodsBy D. R. Derry
This paper up-dates an earlier paper by the author on the rate of new Canadian mineral discoveries and the exploration methods which were principally responsible for these finds. He concludes that the
Jan 1, 1970
-
Control Feeding of Ores By Natural-Frequency MachinesBy A. Musschoot
"The paper will review general types and designs of vibratory feeders, describing briefly the design features and characteristics that apply to the application of specific types. Control consideration