Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stress Mechanism at the Mindola Mine, Zambia, Africa

    By M. L. Jeremic

    The design of the long-hole sublevel mining method was originally based on the traditional assumption that the principal load was due to the weight of the overlying rock, and that the horizontal stres

    Jan 1, 1978

  • CIM
    Effect of Scale and Structure on the Strength and Deformability of Rocks

    By I. Pérez-Rey, J. Arzúa, L. R. Alejano

    "The decrease in strength with increasing rock specimen size is usually associated to the increase in the number of defects inside the specimens at small scale (centimeters) but also to the role of th

    Jan 1, 2015

  • CIM
    Utilisation du remblai en pâte dans les mines filoniennes : La Mine Doyon

    By Chantale Doucet

    L?utilisation du remblai en pâte dans les exploitations en vrac est de plus en plus importante. Puisque la technologie existe pour fabriquer du remblai en pâte sans construire une usine coûteuse, il e

    Oct 1, 2001

  • CIM
    Electrochemical Behavior of An X-80 Pipeline Steel During Stress-Corrosion Cracking in Near-Neutral-pH Environment

    By B. Fang

    Electrochemical behavior of an X-80 pipeline steel, including frequency-sweep electrochemical-impedance spectroscopy (EIS), time-sweep EIS at a constant frequency and open-circuit potential (OCP) moni

    Jan 1, 2005

  • CIM
    Trends in Canadian Diamond Exploration

    By L. H. Thorleifson

    Demand for both gem and industrial diamonds is very strong. Synthetic production supplies industrial uses, but synthetic gems remain inferior and expensive, so the large gem market is supplied by mini

    May 1, 2003

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh

    Jan 1, 1997

  • CIM
    Samarium doped SrCoO3.6 cathode ceramics for use in intermediate temperature SOFCs

    By A. C. Hatton

    Doped SrCoO3.8 was found to be a promising material for use as a cathode component in intermediate temperature SOFCs. In this work, strontium cobaltite ceramics doped with 10 mol% to 90 mol% samarium

    Jan 1, 2005

  • CIM
    Application of Water Covers, Remote Monitoring and Data Management Systems to Environmental Management of Uranium Tailings Sites in the Serpent River Watershed

    By Darrell McClarty, Roger Payne, Matt Haggis, Michael Courtin, Deborah Berthelot

    "Over forty years of uranium mining in the Elliot Lake region of Ontario (I 956-1996) has resulted in the production of over 300 million pounds of uranium. With the completion of mining activity, Rio

    Jan 1, 1998

  • CIM
    The Mining Society of Nova Scotia, 1887-1937

    By Harry Piers

    A RAPID glance over the history of The Mining Society of Nova Scotia shows that in its fifty years of service, which it is now rounding out, the Society has had an honourable career, rendered signal s

    Jan 1, 1937

  • CIM
    Asymetric Buckling Of Circular Rings in a Confined Environment. “Amstutz Buckling” – An Enhanced Approach

    By A. Pearson, F. A. Auld, S. O. Colbeck

    """The theory of buckling of shafts and Steel tunnel-linings"" was published by E. Amstutz in 1970 and commented on by S. Jacobsen in 1974. The authors have revised and enhanced Amstutz’s work to addr

    Jan 1, 2019

  • CIM
    Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfills

    By F. P. Hassani, H. B. Poorooshasb

    "A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro

    Jan 1, 1989

  • CIM
    The Quintette coal project (96ee627b-a342-4ea7-a0e8-7394b1a8b815)

    By D. C. Rance

    "The Quintette Coal Limited property is located in the north east coal area of British Columbia. A basic agreement with the Japanese steel industry was ex ecuted on January 27, 1981 for the sale of 69

    Jan 1, 1985

  • CIM
    Estimation of the Average Value of Gold Ore

    By W. A. Jones

    THE estimation of the average value of gold ore involves many considerations, among them the correct sampling of the deposit, the dilution by waste, and the loss of high-grade fines. It is a common ex

    Jan 1, 1943

  • CIM
    The Next Milestone . . . . . .AccessDirectTM

    By Frank G. Wickert

    One key to maintaining successful mining operations in today?s global economy is in having the ability to access real-time machine operating data ([1] G. Brown, B. Ebacher, W. Koellner,2000)([2] Broch

    May 1, 2002

  • CIM
    Three-Dimensional Modeling of a Heater Test to Investigate Crushed Salt Reconsolidation and Rock Salt Creep for the Underground Disposal of High-Level Nuclear Waste

    By J. T. Birkholzer, M. Rutenberg, K. -H. Lux, R. Wolters, J. Rutqvist, L. Blanco Martin

    In this paper, we present numerical results corresponding to the Thermal Simulation for Drift Emplacement (TSDE) test, conducted in the Asse salt mine (Germany) between 1990 and 1999 to simulate refer

    Jan 1, 2015

  • CIM
    Low Energy Anode Developments in Zinc Electrowinning

    By H. Aaltonen, T. G. Robinson, M. Morimitsu

    "The energy required to plate pure zinc can be the most significant operating cost for an operator in the production of electrolytic zinc. This paper reports on developments on low energy Outotec coat

    Jan 1, 2016

  • CIM
    Development and Implementation of an Expert System for Grinding Control at the Dome Mine

    By John Eggert, Paul Benford

    "Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the

    Jan 1, 1994

  • CIM
    Conflict Impact Assessment Between Objects in a BIM System

    By Yi-Chun Lin

    Mechanical/Electrical/Piping (MEP) systems, due to their complexity and diversity, are the most intricate part of building construction. This being the case, Combined Services Drawings (CSD) and Struc

    Aug 1, 2013

  • CIM
    Small Scale Mining using the Modular Gold Processing Unit at the Granada Mine, Rouyn-Noranda, Quebec

    By Louis Cabot

    A pilot plant of the Modular Gold Processing Unit (MGPU) was designed, installed and operated, over a 8 months period, by RSW-Béroma, at the Granada Mine located near Rouyn-Noranda, Quebec. A descript

    May 1, 2001

  • CIM
    Analysis and Testing of Lubricating Oils in Mine and Mill Production Equipment

    By R. A. Ford

    The paper outlines: methods used for the determination of wear metals in motor and transmission oils; contaminents in motor, transmission and crusher lubricating oils; and viscosity determinations. Ca

    Jan 1, 1977