Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate from Eldorado Gold Corporation’s Certej Project in Romania

    By J. Stiksma, J. Dennett, R. Kalanchey, J. Ji, M. Collins, T. Chan, R. Berezowsky

    A pilot plant campaign has been conducted by Sherritt Technologies in support of Eldorado Gold Corporation’s evaluation of pressure oxidation technology for the treatment of refractory gold concentrat

    Jan 1, 2014

  • CIM
    Geochemical Evolution of the Epidote Zone, Fraser Mine, Sudbury, Ontario: Ni-Cu-PGE Remobilization by Saline Fluids

    By Catharine E. G. Farrow, David H. Watkinson

    Abstract-The Ni-rich Epidote Zone of the Fraser Mine at Sudbury is characterized by alteration assemblages rich in epidote, actinolite and magnetite which are roughly concentrically zoned and up to hu

    Jan 1, 1996

  • CIM
    Tracer Gas Measurements of Effective Ventilation Airflow and its Influence on Dust Concentrations in an Underground Quarry

    By K. Sasaki

    Ventilation measurements were carried out in a shallow underground-quarry space with relatively large internal volume of 14,600 m3 in order to evaluate its effective ventilation characteristics. Based

    Aug 1, 2013

  • CIM
    Anaconda Mining Inc.’s Point Rousse Project Cyanide Destruction System Development Study

    By Neri Roux, Chris Budgell, Allan Cramm, Leo Cheung

    "Anaconda Mining Inc. is investigating potential improvements and expansions to their operating plant located on the Baie Verte Peninsula in Newfoundland. An extensive batch and continuous bench scale

    Jan 1, 2017

  • CIM
    The Molopo Farms Complex, Botswana: History, Stratigraphy, Petrography, Petrochemistry and Ni-Cu-PGE Mineralization (7cbfd5e2-2a0e-4041-96d5-f3f5caa4ab01)

    By EJ. Reichhardf

    The Molopo Farms Complex is a major, layered ultramafic/mafic, early Proterowic intrusion which is totally covered by sediments of the Karoo and Kalahari Fonnations and situated in southern Botswana a

    Jan 1, 1994

  • CIM
    Investigation of the Correlation Between Homogenisation and Tensile Properties of Almgsi-Alloys

    By G. Anger, J. Enser, H. Antrekowitsch, S. Koch

    Homogeneous chemical composition and microstructure are always necessary, but not always attained in practice. As-cast aluminium alloys tend to have a segregation microstructure. Features of the cast

    Jan 1, 2006

  • CIM
    Assessment of precious metals distribution in Lac Mattagami flotation plant by computer mass balance calculation

    By M. Remillard, M. Garon, D. Hodouin, M. Therien

    "Nineteen streams in the copper and zinc flotation units of the concentrator of the Matagami Division of Noranda Inc. have been sampled f or particle size distributions, chemical assays, and gold and

    Jan 1, 1988

  • CIM
    Development of an Innovative Mixed Chloride Leaching Process for the Recovery of Rare Earths

    By V. I. Lakshmanan

    Rare earth elements and yttrium (REEs+Y) are being used in the making of hybrid electric cars, catalytic converters, wind power generators, LEDs, hard disc drives, flat panel displays, and portable el

    Jan 1, 2014

  • CIM
    Vanadium-bearing magnetite and ilmenite mineralization and beneficiation from the Sinarsuk V- Ti project, West Greenland

    By T. Grammatikopoulos, A. McKen, O. Christiansen

    Vanadium mineralization occurs in oxide-rich horizons within layered metagabbro zones of the Sinarsuk deposit, West Greenland. The main oxide minerals are vanadiferous magnetite and ilmenite, comprisi

    Jan 1, 2002

  • CIM
    The Development of WFC/ROMS Ground Support Strategy at Cigar Lake Mine

    By Cale J. Dubois

    At Cameco Corporations' Cigar Lake Project, large excavations are developed on the 480 Level and 500 Level must remain stable for at least 15 years to host underground processing infrastructure.

    Nov 1, 2011

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Effect of Zr and V Additions on Microstructure and Mechanical Properties of the AlSi10Mg Cast Alloy

    By Z. Zhang, X. -G. Chen, F. Breton, A. Arici

    "The microstructure of Al-10Si-0.3Mg-0.5Mn alloy with 0.27% Zr and 0.19% V addition was quantitatively analysed and compared to the base material. The addition of Zr and V in the AlSi10Mg alloy exhibi

    Jan 1, 2018

  • CIM
    Effect of Mineralogy on the Sensor-Based Sorting of a Low Grade Copper Ore Using High Frequency Electromagnetic Technology

    By Bahjat Khoshaba, Bern Klein, Haixing Yan, Libin Tong, Andrew Bamber

    "When a conductive or magnetic particle was put into an electromagnetic field introduced by an electromagnetic sensor, the particle can influence the electromagnetic field which can be used to charact

    Jan 1, 2016

  • CIM
    Quantitative Indexes to Evaluate Operator?s Bearing, Difficulty in Task, and Machine Operability when Remotely Controlling Backhoe

    By Shigeomi Nishigaki

    This paper presents quantitative indexes to evaluate operator?s bearing, difficulty in a task, and machine operability when an operator remotely controls a backhoe, and reports the use cases. The quan

    Aug 1, 2013

  • CIM
    Investigation on the Effective Strength of Broken Rock Through Shape Properties of Particles

    By S. Balideh

    A good understanding of the behavior of rock helps us to make more informed decisions regarding geo-structures. Engineers need accurate equations to calculate the strength and deformation of rock befo

    Aug 1, 2013

  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • CIM
    Geochemical Performance of Mine Rock beneath an Elemental Sulfur Stockpile and Implications for Water Quality Management Following Removal of the Stockpile

    By S. Litke

    Elemental sulfur was stockpiled at the Mount Polley Mine for use as a source of sulfuric acid as part of research into leaching copper from oxide ores, but the project did not proceed beyond an initia

    Jan 1, 2019

  • CIM
    Continuous Uranyl Peroxide Precipitation From Combined Solvent Extraction Strip Liquor And Ion Exchange Eluate For The Honeymoon Uranium Project

    By K. Bowes, M. D. Maley, R. J. Ring

    The Honeymoon Uranium Project is an acid In-Situ Recovery (ISR) mine in South Australia. It was previously operated for approximately 18 months before being placed on care and maintenance in 2014, it

    Jan 1, 2020

  • CIM
    Deformation of the High Pressure Die Cast Az91 at High and Intermediate Temperature

    By P. Leo

    The hot deformation behavior of a Mg-9A1-1Zn alloy produced by high pressure die casting has been investigated by means of compression tests in the temperature and strain rate ranges of 125-300°C and

    Jan 1, 2006

  • CIM
    Effect of Mechnochemical Treatment on the Extraction Ratio of Ni From Ni Ore

    By H. Ito, T. Takasu

    Effects of a mechnochemical treatment to oxide Ni ores have been investigated to enhance the extractive ratio of Ni from them in acid leaching process. High intensity grinding by a planetary boll mill

    Jan 1, 2005