Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Microstructures and Softening Behaviours of Lead Sinters and Their Correlation to Sintering Temperatures in Mount Isa Lead SmelterBy Burrows. A.
Temperature profiles in the lead smelter sinter bed at Xstrata Zinc Mount Isa sinter plant have been measured using a wireless temperature probe. Corresponding sinter samples have been collected for c
Jan 1, 2008
-
Paste Backfill Bulkhead Monitoring ? A Case Study from Inmet?s Cayeli Mine, TurkeyThe stability of paste fill bulkheads forms an integral part of a successful paste fill system. Bulkheads are constructed at the draw points of open stopes to contain paste fill while the initial pour
May 1, 2007
-
The economics and marketing of Canadian potashBy M. A. Upham
"Prairie Evaporites of the Province of Saskatchewan in a deep oil-well hole. Exploitation started in 1950 under a shroud of doubt that this huge reserve could be mined. It was fraught with almost insu
Jan 1, 1980
-
Chapter III-Continued - Part 8.- Matachewan-Kirkland Lake-Larder Lake Area Regional Structure of the Kirkland Lake-Larder Lake AreaBy Jas. E. Thomson
"The Kirkland Lake-Larder Lake gold area is in northeastern Ontario and is a continuation of the ore-bearing belt that extends across northwestern Quebec through the Rouyn, Cadillac, Malartic, and Bou
Jan 1, 1954
-
Effect of Plasticity on Stress Corrosion Cracking Rate of X-52 Pipeline Steel in Near-Neutral pH EnvironmentBy R. L. Eadie, J. L. Luo
The effect of plastic deformation on near-neutral pH stress corrosion cracking (SCC) also known as environmentally assisted cracking was studied by cracking rate measurements. All the tests were condu
Jan 1, 2005
-
Mining In Space; Technology Transfer: Examples and ApplicationsElectric Vehicle Controllers Ltd. ?EVC started in 1981 ?Underground electric locomotive drive systems ?Developed tandem load sharing system and radio ELOS controls ?Locomotive autonomy systems
May 1, 2009
-
Suitability of PEM Fuelcells for Underground Mining VehiclesBy Marc C. Bétournay
Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a
May 1, 2003
-
DFT Study on Reactivity of Different Neutral Flotation Collectors with Cu, Zn and Pb Metal Ions in SolutionBy Manjeet Chowdhry, Qingxia Liu, Phillip Choi, Zhenghe Xu
Computational chemistry methods, such as density functional theory (DFT), are powerful tools to quantify reagent-mineral interactions encountered in sulphide mineral flotation. A quantitative relation
Jan 1, 2015
-
Coal Preparation - A two-part paper on problems encountered in a modern coal preparation plant and how they were dealt with - Part 1 Low-gravity separationBy B. W. Clyburn
"Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing a/l essential properties to provide metallurgical c
Jan 1, 1980
-
Extended Weights-of-Evidence Modelling for Predictive Mapping of Base Metal Deposit Potential in Aravalli Province,Western IndiaBy Alok Porwal, E. J. M. Carranza, M. Hale
Abstract- Approaches to mineral potential mapping based on weights of evidence generally use binary maps, whereas, real-world geospatial data are mostly multi-class in nature. The consequent reclassif
Jan 1, 2001
-
Commissioning and Ramp Up of the HPGR Circuit at Newmont Boddington Gold (Newmont Boddington Gold’s Processing Facilities)By Brendan Parker, Tyron Rees, Steven Hart, Abba Manesh, Ian Mcgaffin
"In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of th
Jan 1, 2012
-
External Outreach in Action ? Challenges of Consistent ImplementationBy Patricia Dillon
EHS Management Standards Communication and Reporting (8) ! Establish processes for internal and external communications ! Designate responsibilities for communication with COI ! Report as defined
May 1, 2004
-
The Du Pont Sequential Blasting SystemBy D. O. Tansey
This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show
Jan 1, 1979
-
The 425 Project - Dealing with SO2By Éric Côté
Introduction The 425 Main Ore Zone ? Block of ore partially mined in the late sixties; ? Area was sealed off for over 30 years due to SO2 emissions from oxidizing fill material; 425 Project goal
Feb 1, 2008
-
Comparing the MHD Cell Stability of an Aluminium Reduction Cell at Different Metal Pad Height and Ledge ThicknessBy M. Dupuis, V. Bojarevics
It is well known that horizontal current density in the metal pad contributes greatly to the generation of MHD driven bath-metal interface wave. It is possible to compute very accurately the metal pad
Jan 1, 2006
-
A Factorial Study of Gold Leaching in Temperature Controlled Thiosulfate Solutions Containing Copper and Meso-2,3-Dimercaptosuccinic AcidBy L. Fernandes
A factorial study was performed to investigate the relative effects of temperature, copper concentration and meso-2,3-dimercaptosuccinic acid (DMSA) concentration on the performance of thiosulfate lea
Jan 1, 2014
-
Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer ProcessBy Yannis Faitakis, Simon Bergeron
"This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B
Jan 1, 2003
-
Residence time distributions modelling for mineral processes evaluationBy C. Bazin, D. Hodouin
"A flexible model involving perfect mixers, stagnant zones, plug flow, material bypassing and recycling zones has been developed for interpreting mixing phenomena in mineral processes. The mixing prop
Jan 1, 1988
-
An Investigation on the Effect of Age Hardening on the Formability of 7075 Aluminum AlloyBy A. Sadough vanini A. Kami
In this paper, effects of different ageing treatments on the mechanical properties, microstructure and formability of 7075 aluminum alloy have been studied. Forming limit diagrams of the alloy have be
Oct 1, 2011
-
Effects of the Rolls’ Speed and Pressure on the HPGR Performance during Gold Ore GrindingBy H. Dundar, C. Dzomeku
An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa
Jan 1, 2012