Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Density and Porosity Concepts for Asbestos and , Other Minerals

    By M. Cossette, P. C. A?tcin

    At present there is considerable confusion in the asbestos industry with regard to density and porosity measurements of asbestos. In order to clarify the situation, various notions of porosity and den

    Jan 1, 1972

  • CIM
    Evaluation Assessing Rock Burstability Through Mechanical Property Testing and Microscope Image Analysis

    By C. D. Rowe, H. S. Mitri, J. Malki, I. Vennes

    Ore extraction at great depths creates high stresses around mine openings, which can result in violent rock failure in one of various forms of strainburst. This is especially true with strong and brit

    May 4, 2025

  • CIM
    Suggestions for Good Grade Capping Practices from Historical Literature

    By M. Nowak

    Extreme high grades often exert too much influence on surrounding block estimates, leading to a smearing of high grades that can cause overestimation of mineral resources. This concern underlies the d

    Aug 1, 2013

  • CIM
    Observational Ground Control at Xstrata?s Nickel Rim South Mine, Sudbury, Ontario

    By Bradford P. Simser

    Increasingly sophisticated rock mechanic tools are becoming more and more available for today?s ground control specialist. However many problems are still beyond our ability to explicitly calculate or

    Oct 1, 2010

  • CIM
    Interactive computer modelling of truck haulage systems

    By L. K. Nenonen

    "Given the properties, locations and quantities of material to be hauled and the dump locations and capacities, the designer wishes to select the type and number of trucks and loading equipment requir

    Jan 1, 1982

  • CIM
    Development Through Paste and Rock Fill

    By Robert White

    ?Introduction of BMS?Paste fill generalities?Development through paste?Development through rock fill?Conclusion ?Brunswick mine is operated by Xstrata. The mine has been in operation since 1964 and p

    Feb 1, 2008

  • CIM
    Conveyor systems design and application for surface mining

    By M. Scobie, T. Atkinson

    "This paper reviews the development of new designs in extensible and high angle conveyor systems. These aim to overcome the limitations of prior alternative concepts in design. The application of such

    Jan 1, 1991

  • CIM
    On-Site Daily Mineralogy - SIDMIN Program

    By Fuzail Siddiqui

    "The SIDMIN program aims at filling the mineral processor’s need to know the deportment of ‘minerals of interest’ not just ‘elements of interest’ that pass through the processing plants. Generally, ch

    Jan 1, 2000

  • CIM
    Was that Locked Cycle Test Any Good?

    By Mike Ounpuu

    "Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo

    Jan 1, 2001

  • CIM
    Status report on Canadian coal mining

    By Eric D. Jamieson

    "How well is the Canadian coal industry able to expand in the tough competition with other fuels in Canada and with other suppliers in the international, metallurgical and thermal coal trade? Coal pro

    Jan 1, 1980

  • CIM
    An intuitive approach to improving organizational effectiveness

    By Wayne N. McKee, Scott A. Lewis

    "Introduction to the Syncrude OperationSyncrude Canada Ltd., located 42 km north of the city of Fort McMurray, Alberta, (Fig. I) is an integrated operation that has produced synthetic crude oil from t

    Jan 1, 1993

  • CIM
    Crusher and inclined conveyor system at Detour Lake Mine

    By P. Hansman

    "Place Dome Canada's Detour Lake Mine is a low-grade gold producer located in northeastern Ontario. Production is targeted for 2850 tonnes of ore per day. As reserves and mining areas continued t

    Jan 1, 1995

  • CIM
    Canada Fluorspar (NL) Inc. St. Lawrence Fluorspar Project – Flowsheet Development

    By M. Stogran-Baker, E. Legault-Seguin

    "Fluorspar mining in the St. Lawrence area of Newfoundland and Labrador began in the 1930s and ended in the mid-1980s. In 2013, Canada Fluorspar (NL) Inc (CFI) discovered a new ore body, the AGS vein,

    Jan 1, 2018

  • CIM
    Analysis on Sag Mill Liner Failure

    By E. Vesely, A. Saxena

    "SAG mill liners are designed for protecting the mill shell and providing lifting power for ore charge and grinding media. Due to the impacts from the charge and the grinding media, the liner experien

    Jan 1, 2019

  • CIM
    Mine planning and design integration (8b994481-1a73-40ce-ac2d-755d2a73f2cd)

    By Earl Gebhardt

    "The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain i

    Jan 1, 1993

  • CIM
    Experimental Research on Reduction of Granite Strength Induced by Microwave Irradiation

    By Jun Dai

    Based upon research findings from several countries, the combination of microwave and mechanical means to break hard rock holds promise for the future. To achieve this goal, it is essential to underst

    Aug 1, 2013

  • CIM
    Production of nano-Structured 5083 Aluminum Alloy by ARB Process and Evaluation Microstructure and Mechanical Properties

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    Empirical Approaches for Weak Rock Masses

    By Tom Brady

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate weak rock m

    May 1, 2003

  • CIM
    A Review of Suncor Energy’s Millennium Extraction Process

    By Michael Godard, Peter Cleyle

    "Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp

    Jan 1, 2004

  • CIM
    Recovery of Copper from a Massive Polymetallic Sulpidde by High Concentration Chloride Leaching

    By G. B. Harris

    A new process for the recovery of copper and associated base metals from a polymetallic massive sulphide ore is described. The massive sulphide contains copper and especially nickel sulphide in a mine

    Jan 1, 2007