Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Quality control requirements for more reliable mineral deposit and reserve estimates

    By Deni Côte, Michel Dagbert, Marcel Vallée

    "Greater reliability of mineral deposit and reserve estimates can be attained through better quality control of the data and information acquisition, and the estimation processes. This paper reviews t

    Jan 1, 1993

  • CIM
    Frieda River Project Update

    By C. Beaudry

    Outline ? General Geology of Frieda River Project Area ? Exploration History ? Geology of Porphyry Deposits ? Porphyry Resource ? Update of Nena Deposit and High-Sulfidation Mineralization ? Ne

    May 1, 2006

  • CIM
    Effect of Copper on Microstructure and Mechanical Properties of Ultrasonic Melt Treated Aluminum Alloys

    By Y. -H. Cho, J. -M. Lee, J. -G. Jung

    The effects of copper on the microstructure and mechanical properties of ultrasonic melt treated Al-xCu (x=0, 4) alloys were investigated. The densities of alloys were increased and their grain sizes

    Jan 1, 2014

  • CIM
    Geological Framework of Alkaline Cu-Au Porphyries -central B.C.

    By James Logan

    BC Alkaline CuBC Cu--Au PorphyriesAu Porphyries ?Formed over narrow time interval ~205 Ma ?from silica deficientvsalkali-enriched magmas ?At shallowdepths ?Structuralcontrol ?Cu-Au-Ag, trace M

    May 1, 2006

  • CIM
    Selenium and Molybdenum Removal from Contaminated Mill Process Effluent: Cameco Key Lake Operation

    By Arthur Lieu

    The mill effluent treatment circuit (Bulk Neutralization (BN)) in the Cameco Key Lake Operation was modified in 2008 to enhance the removal efficiency of selenium (Se) and molybdenum (Mo) from the mil

    Aug 1, 2010

  • CIM
    L?application Du Prri Au Secteur Minier

    By Josée Dartois

    En 1988, à l?instar de plusieurs états du monde industrialisé, le Québec décidait d?accélérer la cadence de l?assainissement des rejets industriels et lançait un programme intégré de réduction de la p

    Nov 1, 2002

  • CIM
    Bonded-particle simulation of Tunnel Sealing Experiment

    By T. S. Wanne

    Tunnel sealing experiment (TSX) was conducted between 1997 and 2004 in the Canadian URL located in Manitoba. In the experiment, a tunnel was excavated parallel to the maximum principal stress directio

    May 1, 2009

  • CIM
    Mechanical Properties of Inconel 600 Welded to Carbon Steel

    By S. Knapp

    Inconel 600 pipes welded to Carbon-Steel are used in CANDU nuclear reactors. Fracture of these welded tubes would have important consequences in term of safety, and therefore their mechanical properti

    Jan 1, 2011

  • CIM
    AL KIN - A new generation of fluxing and purging technology for a cleaner Aluminium

    By F. Filzwieser, K. Gamweger

    The process of gas purging in molten aluminium has been an industrial practice in Europe for many years. The advantages are a reduction in the hydrogen content and impurities in the melt, as well as a

    Jan 1, 2004

  • CIM
    Laboratory Flotation Separation of Inco "Bulk" Matte

    By A. Mukherjee, C. Kelly, B. Markovich, G. E. Agar, G. E. Robertson, F. Khan, B. Shea

    "Laboratory batch flotation tests were performed on a sample of bulk slow cooled converter matte (Cu:Ni = I) to optimize the time in each of the separation stages. Numerical simulations were carried o

    Jan 1, 1996

  • CIM
    Feed Size Changes for Increased Throughput at Newmont Carlin’s Dry Grinding Circuit (c85eb443-2a29-43a1-b434-f327269c2a25)

    By Walter Valery, Lauren Hafla, Megan Tibbals, Adrian Dance, Jeff Snyder

    "Newmont Mining Corporation’s Carlin (“Carlin”) operation processes roaster feed through a double rotator, dry grinding mill following secondary crushing. Metso Process Technology & Innovation (“PTI”)

    Jan 1, 2012

  • CIM
    Novel materials for aluminium electrolysis cells

    By W. M. Silva, Bittencourt. L. R. M.

    Three newly developed alumino-silicate refractory bricks for use in safety lining of aluminum electrolysis cells were compared to one commonly used bricks for the same application. It was shown that t

    Jan 1, 2004

  • CIM
    Etude du drainage superficiel et souterrain de la -mine à ciel ouvert des Mines Gaspé, Murdochville, Québec

    By A. Liard, H. Sommelet, G. Sauriol

    "Description des études qui ant conduit à la conception spécifique du système de drainage de la mine à ciel ouvert. Les approches différentes sont examinées ainsi que la valeur du système recommande.I

    Jan 1, 1981

  • CIM
    AOSTRA underground test facility: progress and potential

    By R. W. Luhning, S. D. Gittins, J .. A. Haston

    "The Underground Test Facility (UTF) project operated by the Alberta Oil Sands Technology and Research Authority (AOSTRA) north of Fort McMurray has achieved marked success in field testing mining acc

    Jan 1, 1990

  • CIM
    Niobium and Tantalum Chemistry: A Brief Overview and Recent Highlights

    By Sarah Belair, Gauthier Deblonde, Valerie Weigel, Alexandre Chagnes, Gerard Cote

    "Niobium and tantalum are strategic metals for electronic and alloys industries. They are produced by pyrometallurgy and hydrometallurgy but most of the niobium and tantalum production processes are n

    Jan 1, 2016

  • CIM
    Kinross Paracatu, Start-Up and Optimization of SAG Circuit (7832025f-e075-4ccb-ad3a-7f076b2a98ce)

    By Jr. Santos, T. V. Pignaton, R. B. Gomides, W. Phillips, M. P. D. Gomes

    Kinross Paracatu started the operation of the new gold processing plant in the end of 2008, being composed by one SAG mill and two ball mills. During the first year of operation the plant had several

    Jan 1, 2012

  • CIM
    Spring budgets-a recap

    By Robert D. Brown

    "Important tax changes, many of them of direct interest to the mining industry, were contained in the budgets brought down by federal and provincial finance ministers across Canada this spring. This m

    Jan 1, 1980

  • CIM
    An assessment of Soviet bucket-wheel excavator and direct sidecasting technology

    By F. G. Boehm, T. S. Golosinski, P. M. Tucker

    "In an earlier paper(1) the visits to several European mines using the bucket-wheel excavator (BWE) technology were described. It was during this trip that information was gathered on some interesting

    Jan 1, 1985

  • CIM
    Laboratory and pilot-plant beneficiation of chromite ore from Bird River, Manitoba

    By P. R. A. Andrews, I. Jackman

    "A mineral processing investigation to recover chromite was performed at Lakefield Research, under the guidance of CANMET personnel, on a 70 tonne ore sample from the Bird River deposit in Manitoba. I

    Jan 1, 1988

  • CIM
    Optimization of a Tilt Poured Permanent Mold Casting via Solidification Modeling

    By Bernard Tougas, Franco Chiesa, David Levasseur, Bernard Duchesne

    "In the present paper, the optimization of a tilt poured permanent mold will be carried out using filling and solidification modeling. This exercise resulted in 3 modifications of the initial mold des

    Jan 1, 2014