    Design, Construction And Testing Of Micro-Piles Used To Support A Concrete Arch Bridge

    By William Auyeung

    Micro-piles are small-diameter, drilled and grouted reinforced piles used for both structural support and in situ earth reinforcement. They were conceived in Italy in 1952, but have become popular in

    Jan 1, 2004

  • DFI
    Micropiles To Support Electric Power Transmission Towers

    By Wendy L. Mathieson

    The Bonneville Power Administration (BPA) will build about 500 miles of new 500-kV transmission lines in the next 5 years. Many new lattice towers will be built in remote locations or in environmenta

    Jan 1, 2004

  • DFI
    Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.

    By Jim Bruce

    This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss

    Jan 1, 2004

  • DFI
    Dynamic Characterization Of Drilled Shafts On Doremus Avenue Bridge

    By Martina Balic

    Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid

    Jan 1, 2004

  • DFI
    Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC Region

    By Frank J. Arland

    Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p

    Jan 1, 2004

  • DFI
    Corroboration and Remediation Options

    "After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga

    Jan 1, 2004

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • DFI
  • DFI
    Vibrations Caused by Pile Driving

    By K. Rainer Massarsch

    "Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can

    Jan 1, 2004

  • DFI
    Permanent Soil Nail Earth Retention System, Stanley Hall Replacement Project, UC Berkeley

    By Pirooz Barar

    The new Stanley Hall building will house the center for bio-engineering and technology research for the UC Berkeley campus. The structure is located at the northeast part of campus, adjacent to Donne

    Jan 1, 2004

  • DFI
    Application of Non-Destructive Testing to Drilled Shafts

    Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde

    Jan 1, 2004

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Seven Mile Dam Retrofit - A Global Challenge

    By Arvindh Gupta

    BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally

    Jan 1, 2004

  • DFI
    Vertical Load Carrying Capacity Of Concrete Expanded Base Piles

    By Mustapha Zergoun

    This paper presents the results of load tests to assess the vertical load carrying capacity of concrete expanded base piles, or pressure injected footings, for various projects located near Vancouver,

    Jan 1, 2004

  • DFI
    Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)

    By K. Rainer Massarsch

    "Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an

    Jan 1, 2004

  • DFI
    Laterally Loaded Caissons for Ontario College of Art & Design

    By William F. Starke

    "The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o

    Jan 1, 2004

  • DFI
    Guide to Drafting a Specification for Micropiles (XXII International Mineral Processing Congress)

    By Joint Micropiles Committee

    "The three types of specifications which are used for micropile work are: • Performance Specifications: The contractor is permitted control over certain design and/or construction procedures but must

    Jan 1, 2004

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • DFI
    Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations

    The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi

    Jan 1, 2004

  • DFI
    Murphy's Law And The Pile Prediction Event At The 2002 ASCE GeoInstitute's Deep Foundations Conference

    By Bengt H. Fetlenius

    The "Pile Prediction Event" at the ASCE GeoInstitute's Deep Foundation Conference in February 2002 involved prediction of drivability and capacity of three 14m long, 324mm diameter, closed-toe pi

    Jan 1, 2004