Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Earth Retention Systems In The Urban Environment - Special ConsiderationsBy George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Fundamental Issues Of Displacement Auger Piling: The European PerspectiveBy Maurice Bottiau
When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond
Jan 1, 2003
-
Installation Of Augered Cast-In-Place Piles - Equipment? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2003
-
Earth Pressure Acting On Single Driven Piles In SandBy Adel Hanna
Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin
Jan 1, 2003
-
Recent Advances In Soil Nailed Earth RetentionBy Tom A. Armour
Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&
Jan 1, 2003
-
Deep Foundations In The Challenging Geology Of Central FloridaBy Gary Kuhns
Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo
Jan 1, 2003
-
Instrumented Load Tests On Closed-And Open-Ended PilesBy Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And ConstructionBy Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Installation Of Augerpiles In Low Headroom And Restricted Access ConditionsBy Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003
-
Jacked Tunnel Construction"Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in
Jan 1, 2003
-
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
-
Performance Of Non-Displacement And Displacement Piling, Adelaide Convention Centre, South AustraliaBy Felix Cheng
Extensions to the Convention Centre in Adelaide, South Australia consisted in part of construction over the existing railway system comprising nine rail lines and passenger platforms. Vibro-pile (Aust
Jan 1, 2002
-
Estimation Of Settlements Of Piles In GroupBy Kazimierz Gwizdala
In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles
Jan 1, 2002
-
Information Technology And The Foundation IndustryBy Andreas Massarsch
Information Technology, IT, is rapidly affecting all aspects of private life and how professional activities are conducted. Probably the most important development is the Internet, which makes it poss
Jan 1, 2002