Stabilization Of Organic Soil With The Limix SystemBy Magnus Ruin
The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met
Jan 1, 2001
-
Presentation #4 - Reflections On Pile Integrity TestingBy Joram M. Amir
Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]
Jan 1, 2001
-
Predicting ACIP Pile Settlement Using Case Histories ? IntroductionBy Christopher M. Kenney
Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr
Jan 1, 2001
-
New Outfall Bridge Structures At Bonneville Dam - 1. IntroductionBy Lance Helwirg
New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu
Jan 1, 2001
-
Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)By Tracy Brettmann
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2001
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 IntroductionBy Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
Effects Of Permanent And Temporary Loads On Allowable Bearing Capacity Of Piles Subjected To Nagative Skin FrictionBy Mohammad T. Izadi
Piles are, often, used for transferring load from the super structure through soft consolidating strata onto relatively stiff uncompressible soils. Downward movement of the soft soil strata develops
Jan 1, 2001
-
Oakland Airport Roadway Project - SynopsisBy David S. Yang
The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc
Jan 1, 2001
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
-
Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And OverviewBy Edmund J. Cardoza
WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM
Jan 1, 2001
-
Presentation #5 - The High-Strain Dynamic Load Test (Drop Weight Test) - ContentsBy Frank Rausche
Why testing What tests can be done Dynamic load testing Loading device Measurements Analysis Examples
Jan 1, 2001
-
Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)By Frank Rausche
The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender
Jan 1, 2001
-
-
Pile Load Testing At JFK International Airport - SynopsisBy J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
New York City - A Review Of Various Foundation Problems And Solutions - SynopsisBy Mel Febesh
Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and
Jan 1, 2000
-
Installation Of Augered Cast-In-Place Piles - Equipment (1ca07ced-58e8-4100-8369-c2eebb984ebc)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2000
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - IntroductionBy F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000