Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel HammersBy R. D. Short
Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali
Jan 1, 1989
-
Capacity Of Slender Steel PilesBy J. Wennerstrand
Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to
Jan 1, 1989
-
American Developments In The Use Of Small Diameter Inserts As Piles And Insitu ReinforcementBy D. A. Bruce
The use of small diameter cast-in-place bored piles is becoming increasingly popular in the United States. Such inserts are used as conventional load bearing piles, and are generally referred to as pi
Jan 1, 1989
-
Review Of The Methods Used To Construct Large Diameter Bored Piles For Top Down ConstructionBy J. D. Findlay
The demands on development in London in recent years has led to the increasing use of top down construction methods in which there is a requirement to place steel columns to high tolerances into large
Jan 1, 1989
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of StructuresBy A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Deep Vibrocompactation By Stone Columns And Liquefaction InvestigationBy P. Ventura
Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde
Jan 1, 1989
-
Port Orange Drilled Shaft Load Tests - IntroductionBy David K. Crapps
The drilled shaft load tests at Port Orange were part of a demonstration project sponsored by the Federal Highway Administration (FHWA) and the Florida Department of Transportation (FDOT). Three load
Jan 1, 1989
-
An Innovative Approach To Load Testing Of High Capacity PilesBy P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Behavior Of Mini-Piles Used In Foundation Underpinning In Beaumont Clay, Houston, Texas, USABy O&apos, M. W. Neill
Mini-piles have been found to be a practical, technically correct remedial underpinning method. They can be constructed in limited access areas with very little disruption. Experience indicated that m
Jan 1, 1989
-
Variable Inertia Elastic Piles On Elastic Plastic Soils Bearing Horizontal Forces: A Numerical Calculation Method Applied To Two Examples Of StructuresBy G. Noce
The ever more present necessity for greater precision in foundation structures on vertical piles subject to horizontal forces applied to the heads, in the light of of the latest knowledge about the el
Jan 1, 1989
-
Base Grouted Piles In Thanet Sands, LondonBy D. E. Sherwood
Twelve toe grouted, and eleven ungrouted piles, founded in very dense sands have been analysed to establish how toe grouting enhances pile performance. It is shown that pile stiffness is greatly incre
Jan 1, 1989
-
The Effects Of Changes In Effective Stress On A Base Grouted Pile In SandBy V. M. Troughton
Large diameter bored piles with grouted bases have been adopted for the foundations of the majority of the buildings at Canary Wharf in London's Docklands, including a deep basement car park. The
Jan 1, 1989
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
On The Effects Of Sand Grading On Driven Pile PerformancePrecast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i
Jan 1, 1989
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete ProcessBy E. W. Raabe
The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available
Jan 1, 1989
-
Construction Productivity Advancement Research Program (CPAR)By Jesse A. Pfeiffer
CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati
Jan 1, 1989
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Recent Developments In Continuous Flight Auger PilingBy P. H. Derbyshire
The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des
Jan 1, 1989
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USABy P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989