    Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PR

    By Filippo Maria Leoni, Wesley Schmutzler

    "Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s

    Jan 1, 2015

  • DFI
    Comparison of LRFD Resistance Factors to Tension Pile Load Tests

    By Seth H. Hamblin, John E. Regan, Dimitrios Palantzas

    "Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto

    Jan 1, 2015

  • DFI
    Comparison of Numerical Predictions Using P-Y Curves and Finite Element Analyses of Monopiles of Ocean Energy Converters under a Very Large Number of Low Amplitude Lateral Load Cycles

    By Deepak Pappusetty, Miguel A. Pando

    This study is motivated from the increased interest in recent years to explore use of Ocean Energy Converters (OEC’s).OEC’s can be tidal or generate electricity from wave or current action. Design of

    Jan 1, 2015

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • DFI
    Deep Excavation for Loop Pit

    By Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De

    "This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t

    Jan 1, 2015

  • DFI
    Deep Excavation Support – Shangri-La – Toronto

    By Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle

    "The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe

    Jan 1, 2015

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015

  • DFI
    Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short Pile

    By Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee

    "The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope

    Jan 1, 2015

  • DFI
    Determination of Liquefaction in Time Domain Using Shake Table Test, Wavelet Analysis and Numerical Approach

    By Aniruddha Sengupta, Rana Chattaraj, G. R. Reddy, Raj Banerjee

    "Earthquake induced liquefaction in saturated granular soils is an important phenomenon which causes severe damage to life and property. In the present study, dynamically induced liquefaction of satur

    Jan 1, 2015

  • DFI
    Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.

    By Mark Spence, Tom Lardner, Matthew Janes

    "IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora

    Jan 1, 2015

  • DFI
    Design of Pile Foundation for Tall Railway Bridges in North-East India

    By Sumantra Sengupta

    "Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu

    Jan 1, 2015

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge Method

    By Jogeshwar P. Singh, Mohamed Ashour

    The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio

    Jan 1, 2015

  • DFI
    Reliability Assessment of the Capacity of Single Pile Subjected to Vertical Loading

    By Rajarshi Pramanik, Nirjhar Dhang, Dilip K. Baidya

    "This paper performs the reliability evaluation of pile foundation under vertical loading condition using the concept of fuzzy set theory. The uncertain parameters are expressed as fuzzy numbers. Mont

    Jan 1, 2015

  • DFI
    Response of Pile and Pile Groups against Excavation Induced Ground Movement

    By K Ilamparuthi, R. K. Madhumathi

    "This paper presents the results of 1g model tests conducted on model piles both single and two pile groups embedded in sand by physically inducing lateral soil movement. From the test results it was

    Jan 1, 2015

  • DFI
    Pullout Capacity of Pile Groups in Sand

    By S. P. Mukherjee, Smita Tung

    "Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i

    Jan 1, 2015

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects

    By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami

    "Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha

    Jan 1, 2015

  • DFI
    Piles through Soft Clay for a Metro Project

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese

    "Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar

    Jan 1, 2015

  • DFI
    Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing Facility

    By Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler

    "This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in

    Jan 1, 2015