    Investigation and Design for Large Drilled Shaft Foundations in Southwest Arizona

    By John C. Tosh, Peter M. Kandaris, Sheldon John

    Geologic, geotechnical and hydrologic studies were performed for the design of 115 deep, large diameter drilled shaft reinforced concrete foundations (6 to 12 feet) to support tall steel monopoles for

    Sep 8, 2021

  • DFI
    Probabilistic Subsurface Characterization for Transmission Line Foundation Design

    By Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok

    "Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc

    Jan 1, 2017

  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • DFI
    Ground Energy Systems In London - A Best Practice Approach

    By Ryan Law

    Ground energy systems are being installed in increasing numbers in the United Kingdom. This is particularly true in London where planning regulations require larger scale developments to provide at l

    Jan 1, 2008

  • DFI
  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • DFI
    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • DFI
  • DFI
    Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep Terrain

    By Scott D. Neely, Donald R. Clark

    "An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g

    Jan 1, 2015

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • DFI
  • DFI
    Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage Barrier

    By A. David Miller, Douglas M. Barber

    "The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust

    Jan 1, 2015

  • DFI
    Skilled Operative Training For The Foundation Industry - Summary

    By Geoffrey Birch

    A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski

    Jan 1, 2000

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • DFI
    The Road To Innovation In Geotechnical Construction

    By Peter J. Nicholson

    During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i

  • DFI
    Friction Loss in Tieback Anchors used for Landslide Stabilization

    By John P. Turner, Benjamin J. Turner

    "Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho

    Jan 1, 2017

  • DFI
    The Road to Innovation in Geotechnical Construction (f2290583-6329-4b39-a4c9-b746aba3a1f4)

    By Peter J. Nicholson

    "IntroductionDuring my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concre

    Jan 1, 2017