Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected ApplicationsBy Michael E. Ameel
The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co
Jan 1, 2010
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
The Equilibrium Point Method Of Analysis For The Statnamic Loading Test With Supporting Case HistoriesBy R. G. Horvath
The Statnamic loading test is a new and innovative method for testing deep foundations. The test is relatively inexpensive, quick, easily mobilized, provides for direct measurement of applied load and
Jan 1, 1993
-
Prescriptive Specification Design: The Impact on Cost and Constructability – Case HistoryBy Shawna Munn, Nadir Ansari, Allison Bennett
"This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an
Jan 1, 2017
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Foundations In The Urban Environment The Need For Unique Installation Methods - IntroductionBy James J. Cahill
Contractor's working in an urban environment face a multitude of working conditions. There is no typical "Downtown" job site. From afar we just see the skyline, or up close a specific building. T
Jan 1, 1991
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
The Effects Of Heating And Cooling Energy Piles Under Working Load At Lambeth College, UKBy Tony Amis
There is very limited information relating to the potential impact of temperature cycles, outside the variation that occurs naturally, on the behaviour of foundation piles. Such thermal loading occurs
Jan 1, 2008
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests ProceduresBy Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests ProceduresBy Vijaya Bhushan Rao, Jason Redgers
A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis
Sep 8, 2021
-
Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay BridgeBy Gerry Houlahan
The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde
Jan 1, 2005
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007