Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction

    By Stephen Buttling, Zhong Rui

    "A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a

    Jan 1, 1900

  • DFI
    Interface Testing For The Design Of Micropiles In Expansive Soils

    By Robert W. Schaut

    The use of micropiles is increasing for new construction and to retrofit distressed foundations in expansive soils. Typical micropiles in expansive soils have a lower section where the micropile grou

    Jan 1, 2011

  • DFI
    ACIP Pile Performance and Installation in the Northeastern United States

    By Jr NeSmith

    "Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile

    Jan 1, 2016

  • DFI
    Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis

    By H. Meseck

    Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr

    Jan 1, 2010

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Economic Design Of Piling Platforms On Coarse Grained Subgrade

    By Patrick Wong

    The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv

    Nov 1, 2022

  • DFI
    Advances In Marine Piling Techniques And New Age Piling Materials

    By D. Cantali

    This paper will be presented in two parts. The first part will present the latest advancements in pile installation techniques using state-of-the-art press-in piling technology by Giken. By pressing i

    Nov 1, 2022

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange

    By Travis Coleman, Elvis Ishimwe

    Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic

  • DFI
    Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock Construction

    By Garth Howlett

    In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w

    Jan 1, 2006

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay

    By Susheel R. Kolwalkar

    A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred

    Jan 1, 2008

  • DFI
    The Effc/Dfi Guide To Support Fluids For Deep Foundations

    By Chris Harnan, Christophe Justino

    The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20

    May 1, 2022

  • DFI
    Present To Future Design Considerations Of Deep Foundations ? 1. Introduction

    By William S. Gardner

    It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac

    Jan 1, 1991

  • DFI
    Diggs Does Deep Foundations

    By Robert Bachus, Nikolaos Machairasm, Allen Cadden

    Data Interchange for Geotechnical and Geoenvironmental Specialists (DIGGS) is a data transfer standard that is gaining widespread acceptance in the geotechnical and geoenvironmental communities. Origi

    Jan 1, 2019

  • DFI
    Consultants Can Be Safe, Too – A Collaborative Approach

    By Brian FitzPatrick, Michael J. Weaver

    Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration

    Jan 1, 2019

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    Evolving Micropiles: Optimizing Foundations For Seismic Retrofit

    By Rob Jameson

    Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be

    Jan 1, 2008

  • DFI
    Research Advances In Barrettes: Installation Effects And Load-Carrying Behaviour

    By Guo H. Lei

    Over the last four decades, barrettes have been ever-increasingly adopted as the foundations for tall buildings and heavy infrastructure projects all over the world. Many findings have been gained fro

    Jan 1, 2006

  • DFI
    The World In Steel Sheet Piling ? Synopsis

    By M. Dondelinger

    This paper presents a comprehensive review of steel sheet piling including internationally manufactured hot rolled sections, their history, applications, installation and driving techniques. The di

    Jan 1, 2010