Evaluation of Elongation Criteria and Friction Loss in Ground AnchorsBy John P. Turner, Benjamin J. Turner
"This report describes a research project for evaluating the applicability of the widely accepted 80 percent criterion for elongation of ground anchors to anchors with unbonded lengths exceeding 100 f
Jan 1, 2017
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Collaborative Alliances – A Sustainable Way Forward For Construction?By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
Effect Analysis On Static And Dynamic Tests Of Pile FoundationsBy Hou Shitao
With the development of Wuhan's city planning in China, new buildings of moderate and high store have been increasing day by day. Precast concrete piles or cast-in-site piles were used in the maj
Jan 1, 1991
-
Reliability Of Pile Prediction Methods - SummaryBy M. T. Davisson
Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)
Jan 1, 1991
-
Hybrid Excavation Support System for the Union Station Revitalization ProjectBy Charles G. Crans, Naresh Gurpersaud
"Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni
Jan 1, 2017
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring SystemBy Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
Experiences And New Developments In Offshore FoundationBy Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage StructuresBy Ramanathan C, Prasad P. V. S. R
The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph
Sep 1, 2022
-
Effect of Electrokinetics on Pullout Resistance of Sheet Pile WallsBy Antonio Kodsy, Lutful Khan
A research was carried out to test the possibility of reducing the pullout resistance of metal sheet piles driven in clay soils using Electrokinetic (EK) conditioning. The hypothesis was applying an e
Jan 1, 2019
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984
-
Numerical Modeling Of Dynamic Soil-Structure Interaction In Bridges With Hp Driven PilesBy Tu Bao
HP-Pile foundations are the most favorable type of foundations for bridges because of their constructability, versatility with regard to subsoil conditions, and settlement controllability. For many
-
Cockatoo Island Seawall Seepage Barrier – Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping TrenchBy Chris L. Powell, Russell J. Denny.
"The remotely located Cockatoo Island iron ore mine off the Kimberly coast in Western Australia, which has been in operation since 1951, was recently expanded up to 50m below sea-level using staged co
Jan 1, 2016
-
Recommended Steps And Procedures For Planning And Performing A Geotechnical Investigation For A Seismic Retrofit ? IntroductionBy Mark DeSalvatore
Currently, at Caltrans, the Office of Structure Design is carrying out an extensive seismic retrofit program involving transportation structures throughout California. The goal of the retrofit program
Jan 1, 1993
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
Deep Foundation Shoring in South FloridaBy Douglas C. Brunot
Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w
Jan 1, 2018
-
Estimation & Comparison Of Axial Compression Capacity Of Bored Cast In-Situ Piles As Per Indian And International StandardsBy Sowmiyaa. V. S., Tiruvengala Padma
Axial compression capacities of bored cast in situ piles as per Indian and International Standards are compared in this paper. Bored cast in-situ piles resting on soil and rock are considered for capa
Sep 1, 2022