Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Hybrid Design Approach for Anchored Retaining Walls in Complex GeologyBy Christopher J. Ramsey, Don W. Dotson
"An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga
Jan 1, 2015
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Slope Stabilization of Mill Creek Landslide Using Steel H-PilesBy Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
An Alternative Approach for Estimating the Vertical Capacity of L-Shaped Segmental Underpinning Systems in Urban Basement ConstructionBy Abid O. Adekunte, David Greentree, David Hilton
"The construction industry is witnessing an upsurge in demand by property developers to have basements incorporated into their residential and commercial development schemes. This is attributable to p
Jan 1, 2016
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Site Specific Study for Foundation Design of Iswar Gupta BridgeBy Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath
"Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig
Jan 1, 2015
-
Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected ApplicationsBy Michael E. Ameel
The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co
Jan 1, 2010
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Micropiles Take Off at Dulles AirportBy Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Grouted Micropiles for Foundation Remediation in Expansive Soil (8th Michael W. O?Neill Lecture)By John D. Nelson
Foundation underpinning is a common component of remediation schemes for distressed foundations on expansive soils. For many applications in expansive soil, micropiles have distinct advantages over ot
Aug 1, 2013
-
The Evolution of Augered Cast-in-Place PilesBy Willie M. NeSmith, W. Morgan NeSmith, Alan Roach
"In 2013, Augered Cast-in-Place (ACIP) piles are a mature foundation technology throughout the United States. General guidelines for the design and construction of ACIP piles are available along with
Jan 1, 2013
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral SpreadingBy Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson
The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain
Jan 1, 2019
-
New Insights into Driven Pile Vibrations using Novel Data Management and Visualization ToolsBy Mark Zablocki, Dakarai McCoy
Ground vibrations are an unavoidable effect of driving piles and may pose a risk to nearby infrastructure and the comfort of adjacent occupants. Driven-pile-induced ground vibrations are known to vary
Sep 8, 2021
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee DamBy Glen R. Andersen
"Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is
Jan 1, 2017