Evaluation Of The Effect Of Vertical Load On The Impedance Function In Seismic Analysis Of Soil-Pile-Structure InteractionBy Ahmad Mahboubi
The damage caused by catastrophic earthquakes has always been an incentive towards more sophisticated building codes and requirements. In parallel to computer technology development, the engineers? at
Jan 1, 2010
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In DrivingBy Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of CanadaBy Richard Deakin
This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and
Jan 1, 2011
-
Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of OahuBy Steve Davidow, Scott Tunison
As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of
-
Observational And Numerical Evaluation Of Defects In Deep Mixing Method Columns Used For Lng Process Train Structural Foundation SupportBy Paul J. Sabatini
Between 2008 and 2009, more than 6,000, 23-m long deep mixing method (DMM) elements were constructed to support 124 concrete mats comprising the foundations for the process trains for an LNG facility.
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The UkBy Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile
-
Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In NevadaBy David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana
-
The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok SubsoilBy Narong Thasnanipan
This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w
Jan 1, 2006
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, CaliforniaBy Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung
"Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt
Jan 1, 2017
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell
In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur
May 1, 2022
-
Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow RockBy J. Brian Anderson
Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t
Jan 1, 2011
-
Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil ConditionsBy Seffen Leppla, Rolf Katzenbach, Matthias Seip
"Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig
Jan 1, 2014
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical IslandBy Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled ShaftsBy Josef K. Alter
Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr
Jan 1, 2011
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008