Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The World's Longest Directional Impact Driven Pile

    By Robert F. Stevens, Robin Givet, Kenneth Viking

    "Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660

    Jan 1, 2014

  • DFI
    Risks Associated With Finite Element Modelling Of Cut And Cover Structures

    By Tony Suckling

    The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This

    Jan 1, 2010

  • DFI
    Foundation Stabilization of the Morris Island Lighthouse

    "The Morris Island Lighthouse (MIL) is located between the jetties leading to the Charleston Harbor and Folly Beach, S.C. The present structure is the third lighthouse to occupy this location. The fir

    Jan 1, 2017

  • DFI
    Dynamic Response of Short Piles under Lateral Transient Load

    By Ambarish Ghosh, Rituparna Dey, Indrajit Chowdhury

    "In port and harbor facilities, jetties and cargo berth terminals are usually installed on piles that remain partially embedded in soil, while a part of it behaves as columns supporting top deck. Tech

    Jan 1, 2015

  • DFI
    Accuracy of Low-Strain Pile Integrity Test Results

    By Mahesh Hingorani

    Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv

    Jan 1, 2019

  • DFI
    Deep Excavation for Loop Pit

    By Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De

    "This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t

    Jan 1, 2015

  • DFI
    The Resonant Driver: Ultra High Frequency Pile And Casing Installation

    By Matthew Janes

    The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c

    Jan 1, 2008

  • DFI
    Session 14 "Deep Mixing Method III"

    By Stefan Dahlin

    The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation

    Feb 10, 2003

  • DFI
    Effect of Free Standing Height on Rock Socketed Pile under Lateral Load

    By Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan

    "Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o

    Jan 1, 2015

  • DFI
    Excavation-Induced Movement of Adjacent Foundations

    By Hugo Meggitt, Damian R. Siebert, Wystan Carswell

    Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras

    Jan 1, 2019

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • DFI
    Vibrodriving And The Compaction Of Granular Soils

    By RAP Bement

    Installation by vibrodrivers of sheet and bearing piles generates periodic vibrations in the surrounding ground, which have been widely measured and reported. One of the possible consequential effects

    Jan 1, 1996

  • DFI
    A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - Synopsis

    By J. W. Slatter

    Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati

    Jan 1, 2000

  • DFI
    On The Axial Load-Bearing Behavior Of Vibrated And Impact Driven Full Displacement Piles

    By Bastian Hoffmann, Christian Moormann

    The paper presents results of an experimental study on the axial load bearing behavior of vibratory driven full displacement piles in comparison with impact driven and cyclic quasi-static installed pi

    May 1, 2022

  • DFI
    Lateral Load Testing Of Pile Foundations

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 260 Load Tests

    By Jesús E. Gómez

    A recent bridge underpinning project provided a unique opportunity to obtain information on the load-deflection response of 260 hollow-core bar micropiles. All production micropiles were proof-tested

    Jan 1, 2007

  • DFI
    Optimization Of Pile Length Using Decision Analysis With Information From Load Tests During Construction

    By Jiun-Yih Chen

    Pile load tests are regularly used to verify pile capacities. Sometimes, they are used to optimize pile designs. This paper presents a case study based on a real project, in which the information ob

    Jan 1, 2009

  • DFI
    Intelligent Pile-Driving With A Diesel Impact Hammer

    By Michael D. Justason

    This paper describes the technology behind the development of an automated energy control system for a diesel pile hammer. Some background is given on experience using an energy monitoring system on

    Jan 1, 2006

  • DFI
    The Practical Application Of Pile Reuse At Bow Bells House, City Of London

    By Justin Phillips

    The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin

    Jan 1, 2008

  • DFI
    Metro Sports Facility – A Ground Improvement Case Study

    By I. D. McPherson, Dominic P. Mahoney

    The Metro Sports Facility is currently under development in Christchurch, New Zealand and is a key Anchor Project in the city’s post-earth quake recovery. When completed it will be largest indoor spor

    Nov 1, 2022