    Experiences From The Italian High Speed Rail Network AV Construction

    By Vincent Jue

    In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.

    Jan 1, 2010

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • DFI
    New Application of Geophysics: Reduce Uncertainty in Subsurface Investigation for Deep Transmission Line Structure Foundations

    By Ralphie Adams, Tiana Rasmussen, Ashley E. Shirer

    Transmission line foundation designers must rely on limited subsurface information, from easily accessible locations, resulting in subsurface uncertainty, increased design risk and increased construct

    Sep 8, 2021

  • DFI
    A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? Summary

    By Michael D. Justason

    This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola

    Jan 1, 1997

  • DFI
  • DFI
  • DFI
    Large Diameter Machine Bored Piles In Australia

    By W. J. Kingwell

    Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of

    Jan 1, 1989

  • DFI
    Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test

    By Liqun Liang

    Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and

    Jan 1, 2011

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • DFI
  • DFI
    High Capacity Barrettes In A Region Of Old Underground Quarries

    By F. Schlosser

    The extension of Montparnasse Station in Paris required the construction of supports of very high unit capacity to support a particularly rigid super-structure. The majority of the site is characteriz

    Jan 1, 1989

  • DFI
  • DFI
    Machine Foundation Repair

    By Scott D. Thomson

    The client for this project specializes in the use of state-of-the-art technology to fabricate and assemble composites and metal-bonded structures for commercial and military aircraft programs. One of

    Jan 1, 2003

  • DFI
  • DFI
    CFA Pile Design Parameters in Sand

    By Stuart Coutts

    "This paper presents an overview of the author’s experience related to the assessment of the base capacity of straight shafted and enlarged-base bored piles in sand. A design approach based on CPT qc

    Jan 1, 1900

  • DFI
    Deep Mixing in the United States: Milestones in Evolution

    By Donald A. Bruce

    "Abstract The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments we

    Jan 1, 2014

  • DFI
    Insitu Ground Reinforcement Techniques

    By Peter J. Nicholson

    The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement

    Jan 1, 1991

  • DFI
  • DFI
    Securing Rail Infrastructure in Romania

    By Andreas Brandner

    "At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors

    Jan 1, 2017