Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002

  • DFI
    Session 23 "Grout in Rock and Mining"

    By John Davie

    We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is

    Feb 10, 2003

  • DFI
    An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The Problem

    By M. Zanotto

    [ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole

    Jan 1, 1992

  • DFI
    Drilling And Dewatering In An Urban Environmentprivate - Project Description And Location

    By Joel Moskowitz

    In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M

    Jan 1, 1996

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • DFI
    Geophysical Methods For Site Characterization For Marine Foundations

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri

    Jan 1, 2013

  • DFI
    Soil Plug in Open Ended Pipe Piles Embedded in Sand

    By Mohammed Y. Fattah, Wissam H. S. Al-Sudani

    "During installation of pile, a soil column is formed inside the pile. For small depths, the height of the soil column typically equals to the penetration depth (full coring state). As the penetration

    Jan 1, 2014

  • DFI
    Stone Columns At Trenton Water Treatment Facility - Suitable Alternative To Remove And Replace For Mat Foundation

    By Darrell Wilder

    The Trenton Water Treatment Facility in Trenton, New Jersey, is expanding to upgrade existing facilities and to meet the increasing demands of the public. The facility sits uncomfortably between the

    Jan 1, 2008

  • DFI
    Using Seismic Tomography To Evaluate Foundation Structures

    By Ed Kase

    Cross-hole sonic logging (CSL) has become the universal standard, nondestructive testing (NDT) method used in evaluating the integrity of foundation structures to maintain quality assurance and qualit

    Jan 1, 2003

  • DFI
    Real Time Monitoring the Historic Old South Church, Boston, Massachusetts

    By Pierre Gouvin, Michael Oakland

    "This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple

    Jan 1, 2017

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2015

  • DFI
    Monitoring Auger Cast In Place Pile Construction And Testing In Hard Clay

    By C. Vipulanandan

    Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curing

  • DFI
    Berth Deepening A Three Decade Old Wharf Structure For The Next Generation Of Container Ships

    By Bill Paparis

    The thirty year old wharf structures at the Port Authority of New York & New Jersey?s Port Elizabeth Marine Terminal are being modernized for the next generation of Post-Panamax container ships, which

    Jan 1, 2013

  • DFI
    Stability Analysis Of Jack-Up Rig At The Bohai Oil Field ? Introduction

    By H. Cheng

    The Bohai Oil Company has applied all together 11 jack-up oil drilling rigs (movable platforms) (1) which can be classified in terms of their forms of foundations into two types: the integ­ral mat and

    Jan 1, 2010

  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • DFI
    Design And Load Test Of Micropiles In A Power Plant In Missouri

    By Bidjan Ghahreman

    A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde

    Jan 1, 2009

  • DFI
    History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - Summary

    By James S. Graham

    Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area

    Jan 1, 2000

  • DFI
    Analysis Of Vibratory Driven Pile ? Introduction

    By Sherrill Gardner

    Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type

    Jan 1, 1987

  • DFI
    Drilled Displacement Rigid Inclusions Support Port-Based Cement Facility

    By Morgan NeSmith

    The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the

    Apr 1, 2023

  • DFI
    Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral Load

    By Andrew Baxter

    The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend

    Jan 1, 2008