Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Rectification Measures And Restoration Of Distressed Pump Foundations

    By V K. Panwar, Sampat Raj

    At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t

    Nov 1, 2022

  • DFI
    Drilled Shaft Design, Testing and Construction in New Jersey Turnpike - Case Studies

    By Abu B. Siddique, Anthony S. Crincoli

    "The New Jersey Turnpike Section 2 widening program consisted of widening between Interchange 6 in Mansfield Township, Burlington County and Interchange 9 in East Brunswick Township, Middlesex County.

    Jan 1, 2015

  • DFI
    The Wireline Undisturbed Soil Sampling In Deep Foundation ? Synopsis

    By Z. Q. Bian

    The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam

    Jan 1, 2010

  • DFI
    Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving Permits

    By Alan Christopherson

    Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med

    Jan 1, 2013

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017

  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • DFI
    Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles

    By Norm Kirk, Robert Bittner

    "The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca

    Jan 1, 2017

  • DFI
    Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - Synopsis

    By J. Nakayama

    Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of

    Jan 1, 1996

  • DFI
    New Orleans Levee Improvement Project: An OPA Contender

    By Filippo Leoni, Wesley Schmutzler

    "The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot

    Jan 1, 2013

  • DFI
    Design, Specification And Installation Of Square Shaft Helical Piers In Expansive Soils

    By John S. Pack

    The application of square shaft helical piers in expansive soils is a standard of practice in many areas of the United States. Over 20 years of performance monitoring show exceptional performance and

    Jan 1, 2007

  • DFI
    Estimation Of Horizontal Deformational Property Using A Pressuremeter Test For The Evaluation Of Lateral Bearing Capacity Of A Pile

    By Hyung-Min Kwon

    There are a number of methods available that can be used to estimate the bearing capacity of piles that are subject to lateral load, such as the theory of subgrade reaction or the elastic continuum ap

    Jan 1, 2008

  • DFI
    Micro-Biological Attack On Deep Foundation Concrete

    By Piotr D. Moncarz

    As major urban areas begin to run out of "good-terrain" for their expansion, they begin to claim high water-table areas within or adjacent to water fronts or swamps. Similarly, major infrastructure pr

    Jan 1, 2002

  • DFI
    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991

  • DFI
    Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design

    By Jesse R. Jacobson

    A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of

    Jan 1, 2011

  • DFI
    Ultimate Uplift Capacity Of Piles And Pile Groups In Granular Soil

    By B. M. Das

    Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,

    Jan 1, 1989

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f

    Jan 1, 2013

  • DFI
    Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - Synopsis

    Pier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app

    Jan 1, 1996

  • DFI
    The Role Of Real-Time Instrumentation In Large Infrastructure Projects

    By J. G. La Fonta

    The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be

    Jan 1, 2006