Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in GoaBy Akshay Sakhuja, M. S. Karthika, R. Vignesh
"The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup
Jan 1, 2015
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of MexicoBy Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Drilled Pier Foundations for Mercedes-Benz StadiumBy Jean Wehbe, Daniel C. Brahana
"The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece
Jan 1, 2016
-
Bearing Capacity And Slope Instability Solved By Novel Ground Engineering SolutionsBy T. J. Snell
Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes
Jan 1, 2006
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Finned Piles Response Subjected To Lateral Loading In Clayey SoilsBy Viswanadham B. V. S., Babu K. V
Wind energy is one of the most economical renewable energy sources. In order to support wind turbines onshore or offshore open-ended monopile foundations are widely used. Unlike conventional structure
Sep 1, 2022
-
Structural Evaluation of Thermal Integrity Profile Results of Transmission FoundationsBy Ryan Weaver, Travis Coleman
The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b
Jan 1, 2019
-
Full-Scale Field Investigations & Numerical Analyses of Innovative Seismic Composite Fiber Reinforced Polymer and Reinforced Grouted Helical Screw Instrumented Piles Under Axial & Lateral Monotonic & Cyclic LoadingsBy M. Hesham El Naggar, Yasser Abdelghany
"ABSTRACT: The axial and lateral monotonic and cyclic behavior of helical pile foundations was investigated and new innovative helical screw systems suitable for seismic loadings were developed and pa
Jan 1, 2014
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Alternative Binder For Ground Improvement To Reduce Co2 FootprintBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS
May 1, 2022
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 IntroductionBy Andy Schroeder
Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun
Jan 1, 1997
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall SystemsBy Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
Estimating Kinematic Demands From Lateral Ground Deformations On Pile-Supported WharvesBy Arash Khosravifar Ph. D. P. E., Thomas Torkelson P. E., Milad Souri Ph. D. P. E.
Kinematic demands from lateral ground deformations can be a major cause of damage to maritime and highway transportation structures such as wharves, piers, and bridges. These kinematic demands are dif
Oct 1, 2022
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
Value-Engineering of H-Pile Foundations in Karstic GeologyBy Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman
"A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert
Jan 1, 2016
-
Experience-Based Value Engineering of Foundations & Deep Excavation Support SystemsBy Abdulazeez Rotimi, Barry Sheppard, Abid Adekunte
Good engineering practice is a function of sound theoretical knowledge, first-hand experience on previous projects of similar scope and scale, good acquaintance with case histories of similar projects
Sep 8, 2021